Calgary, AB,
06
September
2013
|
09:38
America/Denver
Sarcee Trail S.W. scheduled for pavement rehabilitation
On the weekend of Saturday, September 7 City of Calgary crews will repave the road surface of Sarcee Trail S.W. from Glenmore Trail S.W./Highway 8 to Richmond Road S.W. as part of The City’s Surface Overlay Paving program. This work is weather dependent and to allow for an uninterrupted course for the Tour of Alberta cycle race the construction will end by 12:30 p.m. Sunday; however, the road will remain closed to traffic until 2 p.m. for the surfaces to finish cooling.
- Saturday, September 7: Southbound Sarcee Trail S.W. between Glenmore Trail/Highway 8 and Richmond Road S.W. will be closed from 4 a.m. to 6 p.m. Traffic will be detoured to 37 Street S.W.
- Sunday, September 8: Northbound Sarcee Trail between Glenmore Trail S.W. and Richmond Road S.W. will be closed from 4 a.m. to 2 p.m. Traffic will be detoured to 37 Street S.W. and along Highway 8.
Regular maintenance and upgrading is an important part of improving the safety and extending the life-cycle of our roadways. When more extensive repair methods are required, pavement rehabilitation is carried out through pavement rehabilitation or the Surface Overlay Paving program.
The Surface Overlay Paving program includes several important steps, such as milling, adjusting manholes and sidewalk repair. For a detailed description of the program please visit Calgary.ca and type “Surface Overlay Paving” into the search bar.
Paving is prioritized based on specific guidelines for road conditions. Roads that experience high traffic volumes need proactive rehabilitation to maintain the safety of the road as well as increase its service life. Performing preventative construction can avoid hazards like potholes, cracks and frost heaves and lessen the need for continuous maintenance.
The City of Calgary would like to thank motorists for their patience during construction. Please drive with caution in construction zones and adhere to the speed limit and traffic controls. To view the full paving schedule, please visit calgary.ca for details.
- 30 -
Public Contact Information:
The City of Calgary, 3-1-1 Operations Centre
The City of Calgary, 3-1-1 Operations Centre
Phone: 3-1-1 or from outside the local calling area phone 403.268.CITY (2489)
Public E-mail Contact: