<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:pp="http://www.presspage.com/rss/"
     version="2.0"
     xmlns:atom="http://www.w3.org/2005/Atom">
                <channel>
                    <title><![CDATA[City of Calgary Newsroom]]></title>
                    <link>https://newsroom.calgary.ca/</link>
                    <description></description>
                    <language>en</language>
                    <lastBuildDate>Mon, 07 Sep 2026 20:53:43 +0200</lastBuildDate>
                    <pubDate>Tue, 30 Aug 2022 22:28:27 +0200</pubDate>
                    <image>
                        <title><![CDATA[City of Calgary Newsroom]]></title>
                        <url>https://content.presspage.com/clients/150_1485.png</url>
                        <link>https://newsroom.calgary.ca/</link>
                        <width>144</width>
                    </image><item>
                        <title>City Services: Labour Day 2022</title>
                        <link>https://newsroom.calgary.ca/city-services-labour-day-2022/</link>
                        <guid>https://newsroom.calgary.ca/city-services-labour-day-2022/</guid><pp:caseid>525867</pp:caseid><description><![CDATA[<p><span>We're adjusting our hours of operation for Labour Day on Monday, Sept. 5, 2022.</span></p><h2><span><strong>Getting around</strong></span></h2><p>&nbsp;</p><h3><span><strong>​Calgary Transit</strong>&nbsp;</span><br>&nbsp;</h3><p><span>Calgary Transit will provide Sunday level of service on Labour Day, Monday, Sept. 5. For more information on fares,&nbsp;schedules&nbsp;and&nbsp;service changes, please visit&nbsp;</span><a href="http://www.calgarytransit.com/"><span>calgarytransit.com</span></a><span>.</span></p><p><span>Parts of 9 Avenue downtown will be closed due to the Calgary Pride Parade on Sunday, Sept. 4, and some bus routes will be affected. Visit </span><a href="calgarytransit.com/CTrain-service"><span>calgarytransit.com/CTrain-service</span></a><span> for information on these detours</span></p><p><span>The Red Line will also be closed for scheduled maintenance and repair work between Chinook and City Hall Stations from Sept. 3 to 5. Shuttle buses will replace train service between the stations.&nbsp;</span><br><br><span>The shuttle will also run on a detour route due to the parade on Sunday. Customers travelling northbound on the Red Line will disembark the shuttle at 4 Street or 8 Street Stations to transfer to the CTrain, instead of travelling directly to City Hall Station. City Hall Station can still be accessed via CTrain.</span></p><p><span>Maps and full route information for this weekend’s bus and CTrain detours can be found at </span><a href="http://www.calgarytransit.com/CTrain-service"><span>calgarytransit.com/CTrain-service</span></a><span>.</span></p><p><span><strong>Parking</strong></span><br><br><span>No payment is required for on-street parking on Labour Day, Sept. 6. Holiday rates will be in effect at Calgary Parking Authority parkades and select surface lots. Regular rates will be in effect at the Calgary Zoo, TELUS Spark and Heritage Park. Our Impound Lot will also be closed. More information is available at&nbsp;</span><a href="http://calgaryparking.com/"><span>calgaryparking.com</span></a><span>.</span></p><h3><span><strong>Road closures</strong></span><br>&nbsp;</h3><p><span style="padding:0in;"><strong>Memorial Drive long-weekend closure</strong></span><br><span style="padding:0in;"><strong>September 3–5</strong></span></p><p><span>The eastbound traffic lanes on Memorial Drive between 9 Street N.W. and 4 Street N.E. will be closed to traffic Sept. 3 to Sept. 5. This closure is to allow Calgarians to walk and wheel on the roadway when adjacent pathways are expected to be busy.</span></p><h2><span><strong>Around the house</strong></span><br>&nbsp;</h2><h3><span><strong>Landfill hours</strong>&nbsp;</span><br>&nbsp;</h3><p><a href="https://urldefense.proofpoint.com/v2/url?u=http-3A__mandrillapp.com_track_click_30905674_www.calgary.ca-3Fp-3DeyJzIjoiOE02V21rWXJGVUo5aVlLTnhXNk41NzBkVmFjIiwidiI6MSwicCI6IntcInVcIjozMDkwNTY3NCxcInZcIjoxLFwidXJsXCI6XCJodHRwOlxcXC9cXFwvd3d3LmNhbGdhcnkuY2FcXFwvVUVQXFxcL1dSU1xcXC9QYWdlc1xcXC9MYW5kZmlsbC1pbmZvcm1hdGlvblxcXC9MYW5kZmlsbC1Mb2NhdGlvbnMtYW5kLUhvdXJzLmFzcHhcIixcImlkXCI6XCIxYmZhMzA5NDc0ZGU0YWY0YWUxNGM2MzA5OTYxYjZmOFwiLFwidXJsX2lkc1wiOltcImM3ODNhNTYwOThjMWMyZmM5Zjk0MGM3YjIwMmUxODIxNzE2NDhkYzNcIl19In0&d=DwMFaQ&c=jdm1Hby_BzoqwoYzPsUCHSCnNps9LuidNkyKDuvdq3M&r=tTZpPO7FPw28Vipu0NewfqCvWvmgJEEJtB_01FYfCZ4&m=mTo5OMqHepPiWIaLfuaK2EHxOOjkr8kv8T8IhuZHmew&s=PQwqVH_JGlyU3W5wlDDfFWFfk5usxyGAuBvz-NeVIQE&e="><span>Landfill hours and locations</span></a><span>&nbsp;are available on&nbsp;</span><a href="http://www.calgary.ca/UEP/WRS/Pages/Landfill-information/Landfill-Locations-and-Hours.aspx"><span>calgary.ca/landfill</span></a><span>. Hours for&nbsp;</span><a href="http://www.calgary.ca/UEP/WRS/Pages/Landfill-information/Landfill-Holiday-Schedule.aspx"><span>this weekend</span></a><span>&nbsp;are as follows:</span></p><table border="1" cellpadding="0" cellspacing="0"><tr><td style="vertical-align:top;">&nbsp;</td><td style="vertical-align:top;"><span>Spyhill</span></td><td style="vertical-align:top;"><span>East Calgary</span></td><td style="vertical-align:top;"><span>Shephard</span></td></tr><tr><td style="vertical-align:top;"><span>Saturday, Sept 3</span></td><td style="vertical-align:top;"><p><span>OPEN</span></p><p><span>7:30 a.m. – 5 p.m.</span></p></td><td style="vertical-align:top;"><p><span>OPEN</span></p><p><span>7:30 a.m. – 5 p.m.</span></p></td><td style="vertical-align:top;"><p><span>OPEN</span></p><p><span>8:00 a.m. – 5 p.m.</span></p></td></tr><tr><td style="vertical-align:top;"><span>Sunday, Sept 4</span></td><td style="vertical-align:top;"><span>CLOSED</span></td><td style="vertical-align:top;"><p><span>OPEN</span></p><p><span>7:30 a.m. – 5 p.m.</span></p><p><span>&nbsp;</span></p></td><td style="vertical-align:top;"><span>CLOSED</span></td></tr><tr><td style="vertical-align:top;"><p><span>Monday, Sept 5</span></p><p><span>Labour Day</span></p></td><td style="vertical-align:top;"><p><span>OPEN</span></p><p><span>7:30 a.m. – 5 p.m.</span></p><p><span>&nbsp;</span></p></td><td style="vertical-align:top;"><p><span>OPEN</span></p><p><span>7:30 a.m. – 5 p.m.</span></p></td><td style="vertical-align:top;"><p><span>OPEN</span></p><p><span>8:00 a.m. – 5 p.m.</span></p></td></tr></table><h2><span><strong>Facility hours and closures</strong></span><br>&nbsp;</h2><p><span>All City of Calgary administrative buildings, including City Hall, will be closed on Monday, Sept. 5.</span></p><p><span><strong>Arenas, Athletic Parks & Flatwater Pools: </strong>Closed Monday, Sept. 5. See </span><a href="https://www.calgary.ca/csps/recreation/recreation-facilities.html"><span>website</span></a><span> for operating hours on Saturday and Sunday.</span></p><p><span><strong>Glenmore Reservoir Kayak & Canoe Rentals:</strong> Open 10 a.m. – 7 p.m. See </span><a href="https://www.calgary.ca/csps/recreation/sailing-in-calgary/glenmore-sailing-school/facility-information-and-hours-glenmore-sailing-school.html"><span>website</span></a><span> for Glenmore Reservoir boat launch status.</span></p><p><span><strong>Soccer Centre</strong>: Closed Monday, Sept. 5. Regular operating hours on Saturday and Sunday.</span></p><p><span><strong>Leisure Centres</strong>: Closed Monday, Sept. 5. Village Square Leisure Centre pool open Saturday 10:30 a.m – 6 p.m. Southland Leisure Centre pool open Sunday 10:30 a.m – 6 p.m</span></p><p><span><strong>Arts Centres:</strong> Closed Saturday, Sept. 3 – Monday, Sept. 5.</span></p><p><span><strong>The Ralph Klein Park&nbsp;Environmental Education Centre: </strong>Closed Monday, Sept. 5.</span></p><p><span><strong>The Inglewood Bird Sanctuary Nature Centre: </strong>Closed Monday, Sept. 5.</span></p>]]></description><category><![CDATA[city news,Transportation]]></category>
            <pubDate>Thu, 01 Sep 2022 13:30:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_skylinefeature-134853.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_skylinefeature-134853.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/skylinefeature-134853.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[skylinefeature]]></pp:imageTitle><pp:imageDescription><![CDATA[Summertime cityscape image of downtown Calgary, Alberta, Canada.]]></pp:imageDescription></item><item>
                        <title>City Services: Holiday Season 2021</title>
                        <link>https://newsroom.calgary.ca/city-services-holiday-season-2021/</link>
                        <guid>https://newsroom.calgary.ca/city-services-holiday-season-2021/</guid><pp:caseid>486736</pp:caseid><description><![CDATA[<p>We're adjusting our hours of operation for the winter holidays.</p><h2>Things to do</h2><h3>New Year&rsquo;s Eve fireworks!</h3><p>Welcome in 2022 with fireworks! Everyone is invited to celebrate by watching the livestream of a midnight fireworks show over the Calgary Tower at <a href="http://www.calgary.ca/nye">Calgary.ca/NYE</a>, with a synchronized <a href="https://cjsw.com/">CJSW 90.9 FM</a> music soundtrack.</p><p>The fireworks show will be atop the iconic Calgary Tower. If you don&rsquo;t have a view of the Calgary Tower, please watch and listen to the livestream featuring a blessing from a local Indigenous Elder, the countdown to midnight with Calgary Mayor Jyoti Gondek and the main event &ndash; a spectacular fireworks show with music soundtrack broadcast on CJSW 90.9FM.</p><p>We recommend tuning in at 11:55 p.m. on December 31, 2021.</p><h3>What else can you do:</h3><p>In addition to tuning into Calgary&rsquo;s New Year&rsquo;s Eve fireworks show, there are lots of ways people can mark the new year:</p><ul><li>You can enjoy fun outdoor winter activities, visit Calgary.ca/LoveWinter for ideas.</li><li>Consider supporting local restaurants and have a great meal with your friends and family. Learn more about <a href="https://www.calgary.ca/ca/city-manager/about-us/buy-local.html">Support Local</a>.</li><li>Check out VisitCalgary.com to learn about New Year&rsquo;s Eve activities and events hosted by Calgary businesses and organizations.</li></ul><h2>Getting around</h2><h3>Calgary Transit</h3><p>Over the holidays we adjust our hours of service. For more information on fares, schedules and service changes, please visit&nbsp;<a href="http://www.calgarytransit.com/">calgarytransit.com</a>.</p><table style="width:634px"><tr><td width="50%"><p>Monday, Dec 20</p></td><td><p><a href="https://www.calgarytransit.com/content/transit/en/home/news/winter-service-changes--2021.html">Winter service changes</a>&nbsp;begin.</p></td></tr><tr><td><p>Monday, Dec 20 - Tuesday, Jan 4, 2022</p></td><td><p>All school trips are cancelled as schools close for the holidays.</p></td></tr><tr><td><p>Saturday, Dec 25</p></td><td><p><strong>CTrain:</strong>&nbsp;Trains will run every 15 minutes throughout the day. Trains will run every 30 minutes after 10 p.m. Service ends around 02:30.</p></td></tr><tr><td><p>Saturday, Dec 25</p></td><td><p><strong>Bus:&nbsp;</strong>Service every 20-45 minutes on Routes&nbsp;<a href="https://hastinfo.calgarytransit.com/HastinfoMVCWeb/RouteSchedules?Date=2021-12-25&RoutePublicIdentifier=1&RouteDirection=East">1</a>,&nbsp;<a href="https://hastinfo.calgarytransit.com/HastinfoMVCWeb/RouteSchedules?Date=2021-12-25&RoutePublicIdentifier=3&RouteDirection=North">3</a>,&nbsp;<a href="https://hastinfo.calgarytransit.com/HastinfoMVCWeb/RouteSchedules?Date=2021-12-25&RoutePublicIdentifier=8&RouteDirection=North">8</a>,&nbsp;<a href="https://hastinfo.calgarytransit.com/HastinfoMVCWeb/RouteSchedules?Date=2021-12-25&RoutePublicIdentifier=9&RouteDirection=North">9</a>,&nbsp;<a href="https://hastinfo.calgarytransit.com/HastinfoMVCWeb/RouteSchedules?Date=2021-12-25&RoutePublicIdentifier=14&RouteDirection=East">14</a>,&nbsp;<a href="https://hastinfo.calgarytransit.com/HastinfoMVCWeb/RouteSchedules?Date=2021-12-25&RoutePublicIdentifier=38&RouteDirection=East">38</a>,&nbsp;<a href="https://hastinfo.calgarytransit.com/HastinfoMVCWeb/RouteSchedules?Date=2021-12-25&RoutePublicIdentifier=43&RouteDirection=North">43</a>,&nbsp;<a href="https://hastinfo.calgarytransit.com/HastinfoMVCWeb/RouteSchedules?Date=2021-12-25&RoutePublicIdentifier=100&RouteDirection=East">100</a>,&nbsp;<a href="https://hastinfo.calgarytransit.com/HastinfoMVCWeb/RouteSchedules?Date=2021-12-25&RoutePublicIdentifier=300&RouteDirection=North">300</a>,&nbsp;<a href="https://hastinfo.calgarytransit.com/HastinfoMVCWeb/RouteSchedules?Date=2021-12-25&RoutePublicIdentifier=301&RouteDirection=North">301</a>,&nbsp;<a href="https://hastinfo.calgarytransit.com/HastinfoMVCWeb/RouteSchedules?Date=2021-12-25&RoutePublicIdentifier=302&RouteDirection=North">302</a>,&nbsp;<a href="https://hastinfo.calgarytransit.com/HastinfoMVCWeb/RouteSchedules?Date=2021-12-25&RoutePublicIdentifier=303&RouteDirection=East">MAX Orange</a>,&nbsp;<a href="https://hastinfo.calgarytransit.com/HastinfoMVCWeb/RouteSchedules?Date=2021-12-25&RoutePublicIdentifier=304&RouteDirection=North">MAX Yellow</a>,&nbsp;<a href="https://hastinfo.calgarytransit.com/HastinfoMVCWeb/RouteSchedules?Date=2021-12-25&RoutePublicIdentifier=306&RouteDirection=North">MAX Teal</a>&nbsp;and&nbsp;<a href="https://hastinfo.calgarytransit.com/HastinfoMVCWeb/RouteSchedules?Date=2021-12-25&RoutePublicIdentifier=307&RouteDirection=East">MAX Purple</a>. On Demand service is closed.</p></td></tr><tr><td><p>Saturday, Dec 25</p></td><td><p><strong>CTrain:</strong>&nbsp;Trains will run every 15 minutes throughout the day. Trains will run every 30 minutes after 10 p.m. Service ends around 02:30.</p></td></tr><tr><td><p>Friday, Dec 31 New Year&rsquo;s Eve</p></td><td><p>Regular weekday service.</p></td></tr><tr><td><p>Tuesday, Jan 4</p></td><td><p>Regular weekday service and school trips resume.</p></td></tr></table><h3>Parking</h3><p><strong>Christmas Day (Saturday, Dec 25), Boxing Day (Sunday, Dec 26) and New Year&rsquo;s Day (Saturday, Jan 1):</strong>&nbsp;No payment is required for on-street parking. Holiday rates will be in effect at select CPA parkades and surface lots. Regular rates will be in effect at the Calgary Zoo, TELUS Spark and Heritage Park.</p><p>The Impound Lot and CPA Contact Centre will be closed on Dec 25 and Jan 1. Regular rates will be in effect Dec 24 and Dec 31.</p><h3>Road closures</h3><p>As a result of the fireworks show, from 11:45 p.m. Dec. 31, 2021 to 12:15 a.m. Jan. 1, 2022:</p><ul><li>Centre Street S.E., from 6 Avenue S.E. to 9 Avenue S.E., will be closed</li><li>9 Avenue S.W., from 1 Street S.W. to 1 Avenue S.E., will be closed</li><li>9 Avenue S.W. south sidewalk, in front of the Calgary Tower, will be closed</li></ul><h2>Around the house</h2><h3>Blue, Black and Green Cart collection</h3><p>There are no changes to cart collection services this year for single-family homes.</p><p>Regular service will be in effect for Friday, Dec. 24 (Christmas Eve) and Friday, Dec. 31 (New Year&rsquo;s Eve).&nbsp;</p><h3>Landfill hours</h3><p>Landfill hours and locations are available on <a href="calgary.ca/landfill" target="_blank">calgary.ca/landfill</a>. Hours for the holidays are as follows:</p><table><tr><td width="138"><p>&nbsp;</p></td><td width="162"><p>Spyhill</p></td><td width="144">East Calgary</td><td width="144"><p>Shephard</p></td></tr><tr><td width="126"><p>Friday, Dec 24</p></td><td width="138"><p>OPEN</p><p>7:30 a.m. &ndash; 5 p.m.</p></td><td width="162"><p>OPEN</p><p>7:30 a.m. &ndash; 5 p.m.</p></td><td width="144"><p>OPEN</p><p>8:00 a.m. &ndash; 5 p.m.</p></td></tr><tr><td width="126"><p>Saturday, Dec 25</p><p>Christmas Day</p></td><td width="138"><p>CLOSED</p></td><td width="162"><p>CLOSED</p></td><td width="144"><p>CLOSED</p></td></tr><tr><td width="126"><p>Sunday, Dec 26</p><p>Boxing Day</p></td><td width="138"><p>CLOSED</p></td><td width="162"><p>CLOSED</p></td><td width="144"><p>CLOSED</p></td></tr><tr><td width="126"><p>Monday, Dec 27</p></td><td width="138"><p>OPEN</p><p>7:30 a.m. &ndash; 5 p.m.</p></td><td width="162"><p>OPEN</p><p>7:30 a.m. &ndash; 5 p.m.</p></td><td width="144"><p>OPEN</p><p>8:00 a.m. &ndash; 5 p.m.</p></td></tr><tr><td width="126"><p>Friday, Dec 31</p></td><td width="138"><p>OPEN</p><p>7:30 a.m. &ndash; 5 p.m.</p></td><td width="162"><p>OPEN</p><p>7:30 a.m. &ndash; 5 p.m.</p></td><td width="144"><p>OPEN</p><p>8:00 a.m. &ndash; 5 p.m.</p></td></tr><tr><td width="126"><p>Saturday, Jan 1</p><p>New Year&rsquo;s</p></td><td width="138"><p>CLOSED</p></td><td width="162"><p>CLOSED</p></td><td width="144"><p>CLOSED</p></td></tr><tr><td width="126"><p>Sunday, Jan 2</p></td><td width="138"><p>CLOSED</p></td><td width="162"><p>CLOSED</p></td><td width="144"><p>CLOSED</p></td></tr><tr><td width="126"><p>Monday, Jan 3</p></td><td width="138"><p>OPEN</p><p>7:30 a.m. &ndash; 5 p.m.</p></td><td width="162"><p>OPEN</p><p>7:30 a.m. &ndash; 5 p.m.</p></td><td width="144"><p>OPEN</p><p>8:00 a.m. &ndash; 5 p.m.</p></td></tr></table><h2>Facility closures</h2><h3>Planning Services Centre Hours:</h3><p>Monday - Friday<br />8 a.m. - 4:15 p.m. (MT)</p><p>Closed:</p><p>12 p.m. - 4:15 p.m. - Friday, Dec. 24, 2021</p><h3>Recreation Facilities</h3><p>The following facilities will be closed over the holiday season:</p><ul><li><strong>Aquatics and Fitness Centres</strong>: All City-operated aquatic and fitness centres are closed on Dec. 25, Dec. 26 and Jan. 1.<ul><li>Shouldice Aquatic Centre is closed Dec. 10 - Jan. 3.</li><li>Foothills Aquatic Centre is closed Dec. 17, 2021 - Jan 16.</li><li>Inglewood Aquatic Centre is closed Dec. 24 &ndash; Jan. 2.</li><li>Hours of operation vary by facility.</li><li>Info is available at <a href="https://calgary.ca/pools"><strong>ca/pools</strong></a></li></ul></li><li><strong>Leisure Centres</strong>: Both Southland and Village Square Leisure Centres are closed Dec. 25 and 26. Southland is open on Jan. 1 from 11 a.m. to 5 p.m. and Village Square is closed. Hours of operation between Dec. 24 and Jan. 2 vary. Info is available at <a href="https://calgary.ca/pools"><strong>ca/pools</strong></a></li><li><strong>Arenas:</strong> All arenas are closed on Dec. 25, Dec. 26 and Jan. 1. Regular hours apply on other days.</li><li><strong>Art Centres:</strong> North Mount Pleasant Art Centre is closed Dec. 17 &ndash; Jan. 2 and Wildflower Arts Centre is closed Dec. 17 &ndash; Jan. 7.</li><li><strong>Soccer Centre:</strong> Closed Dec. 22 to Jan 2.</li><li><strong>Beltline Community Hub: </strong>Closed Dec. 22 to Jan. 11.</li></ul>]]></description><category><![CDATA[Transportation,city news]]></category>
            <pubDate>Thu, 23 Dec 2021 09:46:42 -0700</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Recreation hosts adaptive golf classes</title>
                        <link>https://newsroom.calgary.ca/recreation-hosts-adaptive-golf-classes/</link>
                        <guid>https://newsroom.calgary.ca/recreation-hosts-adaptive-golf-classes/</guid><pp:caseid>467854</pp:caseid><description><![CDATA[<img src="https://content.presspage.com/uploads/1485/1920_aafs-golf.jpg?10000"><p><span><span><span>With funding from the Canadian Tire Jumpstart Charities, Calgary Recreation has been hosting junior adaptive golf lessons at the Shaganappi Point Golf Course and the McCall Lake Golf Course. Starting in July as a pilot project, these lessons have been free of charge for children with various disabilities and participation is organized through foundations such as Cerebral Palsy Kids and Families, Alberta Sports and Recreation for the Blind, Autism Aspergers Friendship Society of Calgary and Ups & Downs.</span></span></span></p><p><span><span><span>Classes are taught by pros from the National Golf Academy and feature five lessons on the driving range and putting green with the opportunity to play on the McCall Lake Par 3 course. The instructors adapt both equipment and techniques to suit any abilities. The classes are on greens that can accommodate wheelchairs and offer longer class times and brightly-coloured golf balls that are easily visible, ensuring participation for children of all physical and developmental abilities.</span></span></span></p><p><span><span><span>&ldquo;We are constantly learning and adapting every golfer&rsquo;s needs when working with people of all ages, levels and abilities,&rdquo; says Gennie Liu, Recreation Program Specialist with Calgary Recreation,&nbsp;&ldquo;We have worked with each disability group to understand participant abilities, possible adaptations and tips to make it inclusive and accessible for all.&rdquo;</span></span></span></p><p><span><span><span>The junior adapted golf programs have been very successful and are expected to be held again in Summer 2022.</span></span></span></p><p>&nbsp;</p><p><span><span><span>- 30 -</span></span></span></p>]]></description><category><![CDATA[city news,feature,Recreation,Transportation,banner]]></category>
            <pubDate>Thu, 05 Aug 2021 11:05:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_cerebral-palsy.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_cerebral-palsy.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/cerebral-palsy.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[cerebral-palsy]]></pp:imageTitle></item><item>
                        <title>Communauto launches new carsharing service in Calgary</title>
                        <link>https://newsroom.calgary.ca/communauto-launches-new-carsharing-service-in-calgary/</link>
                        <guid>https://newsroom.calgary.ca/communauto-launches-new-carsharing-service-in-calgary/</guid><pp:caseid>412476</pp:caseid><description><![CDATA[<p><span><span><span><span><span><span>The City of Calgary and Communauto, the oldest and largest Canadian carsharing organization announced the launch of a new carsharing service: Communauto FLEX.</span></span></span></span></span></span></p>

<p><span><span><span><span><span><span>&ldquo;I know Calgarians have been looking forward to the return of a car share service,&rdquo; said Mayor Naheed Nenshi. &ldquo;Communauto FLEX will provide an affordable and convenient option, strengthening Calgary&rsquo;s transportation network so individuals and families can get where they need to go.&rdquo;</span></span></span></span></span></span></p>

<p><span><span><span><span><span><span>Starting today, an initial fleet of 150 cars will be deployed in an area covering 26 square kilometres from 50 Avenue S.W. to 21 Avenue N.W., and from 37 Street S.W. to 17 Street S.E. The launch of the service was made possible by City Council&rsquo;s approval of the revised Carshare Parking Policies and Traffic Bylaw earlier this year. &ldquo;A new three-tiered pricing structure was implemented for operators who want to offer one-way carshare trips. This offers predictability and flexibility for carshare companies due to their unique operating model,&rdquo; says Eric MacNaughton, Senior Transportation Engineer.</span></span></span></span></span></span></p>

<p><span><span><span><span><span><span>Tiered pricing for on-street parking</span></span></span></span></span></span></p>

<ul>
<li><span><span><span><span><span><span>Tier 1: The $450 fee per year, per car, for Tier 1 is unchanged from The City&rsquo;s current policy and allows carshare operators to park vehicles in unpaid and residential permit spaces. Tier 1 does not include the downtown core.</span></span></span></span></span></span></li>
<li><span><span><span><span><span><span>Tier 2: costs $840 per year, per car, includes parking in residential, unmetered and metered zones outside of the downtown core.</span></span></span></span></span></span></li>
<li><span><span><span><span><span><span>Tier 3: $1440 per year, per car. Allows operators to use on-street parking in all priced areas, in residential areas and in Calgary&rsquo;s downtown core.</span></span></span></span></span></span></li>
</ul>

<p><span><span><span><span><span><span>The City will also apply a 50 per cent discount to the annual fees for fully-electric carshare vehicles, consistent with the actions in Calgary&rsquo;s Climate Resilience Strategy and Electric & Low-Emission Vehicle Strategy. The policy change also allows carshare vehicles to park beyond posted time limits (for locations with a limit of 1 hour or longer).</span></span></span></span></span></span></p>

<p><span><span><span><span><span><span>Councillor Evan Woolley stated, &ldquo;As a frequent user of car-share services, I am glad that City Council approved the policy updates and am happy to see Communauto help fill the void that exists in Calgary right now. I am hopeful these policy changes will attract more companies to the city.&rdquo;</span></span></span></span></span></span></p>

<p><span><span><span><span><span><span>The service has no monthly fee and its usage costs $0.45/minute, $15/hour or $50 for one day and $35 the following days. For day trips, 100 kms are included in the trip price, and additional kms are billed at $0.20/km. Other plans are offered allowing people to use cars for $2.95/hour, plus $0.29/km, with fuel and insurance included.</span></span></span></span></span></span></p>

<p><span><span><span><span><span><span>&ldquo;Communauto aims to offer a real alternative to car ownership in complement to transit and active mobility. That is why we propose a tariffication adapted as well to small errands, going for grocery as for weekends or vacations. In Calgary we wish to grow a local mobility service, as we did since more than 25 years in many other communities in Canada. Today we start with a limited fleet in a certain area ready to expand the service following the demand of Calgarians,&rdquo; says Benoit Robert, CEO and founder of Communauto.</span></span></span></span></span></span></p>

<p><span><span><span><span><span><span>In the next few weeks, interested people can pre-register or become beta-testers with the exclusive use of a car for free, until the complete fleet is available. The service will start regularly during the month of September. To register people can visit calgary.communauto.com.</span></span></span></span></span></span></p>

<p><span><span><span><span><span><span>This announcement is seen as a positive by other city partners. "Calgary Economic Development is excited to be working with Communauto launching in our city. Shared transportation services like Communauto are an important part of what makes Calgary a great place to live and grow a business. This carshare service will allow Calgarians to explore a new flexible and affordable mobility option to meet their needs and plans for corporate and personal travel," said Mary Moran, President and Chief Executive Officer for Calgary Economic Development.</span></span></span></span></span></span></p>

<p><span><span><span><span><span><span>Once launched, Communauto will have increased sanitization measures in place. This includes the availability of sanitizing gel in the cars, the obligation to wash hands before and after using a car and disinfecting the cars on a weekly basis. Additional time up 15 minutes will be offered for free before each use to allow time to disinfect the interior of the car if desired.</span></span></span></span></span></span></p>

<p style="text-align: center;"><span><span><span><span><span><span>- 30 -</span></span></span></span></span></span></p>

<p><span><span><span><span><span><span>About Communauto</span></span></span></span></span></span></p>

<p>Founded in Qu&eacute;bec City in 1994, Communauto is the largest carsharing service in Canada and the oldest in North America. Present on two continents in 14 cities in addition to Calgary (Edmonton, Toronto, Kitchener/Waterloo, Hamilton, Guelph, London, Kingston, Ottawa, Gatineau, the regions of Montreal and Qu&eacute;bec, Sherbrooke, Halifax and Paris in France). With a fleet of more than 3,000 vehicles, it is one of the few operators in the world offering both free-floating and station-based carsharing. Communauto is a private company whose main mission is to reduce the impact of cars on cities while improving access to mobility. Communauto establishes strong partnerships with public transit authorities and offers the largest electric car-share fleet in Canada, in selected cities.</p>

<p><span><span><span><span><span><span>Contacts:</span></span></span></span></span></span></p>

<p><span><span><span><span><span><span>Communauto</span></span></span></span></span></span></p>

<p><span><span><span><span><span><span>Marco Viviani, VP</span></span></span></span></span></span></p>

<p><span><span><span><span><span><span>mviviani@communauto.ca</span></span></span></span></span></span></p>

<p><span><span><span><span><span><span>403-755-8664</span></span></span></span></span></span></p>]]></description><category><![CDATA[city news,Transportation,banner]]></category>
            <pubDate>Fri, 28 Aug 2020 08:29:17 -0600</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_img-0008.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_img-0008.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/img-0008.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[IMG_0008]]></pp:imageTitle></item><item>
                        <title>Keeping Calgarians on the move: 20 projects in 2020</title>
                        <link>https://newsroom.calgary.ca/keeping-calgarians-on-the-move-20-projects-in-2020/</link>
                        <guid>https://newsroom.calgary.ca/keeping-calgarians-on-the-move-20-projects-in-2020/</guid><pp:caseid>380106</pp:caseid><description><![CDATA[<p>In 2020, The City continues its commitment to planning, building and maintaining safe and efficient transportation options for all Calgarians and investing in our economic recovery to make life better every day for citizens, communities and businesses.</p>

<p>&ldquo;We&rsquo;re excited for the work ahead.&nbsp;We are investing more than $250 million in projects designed to improve&nbsp;mobility, safety and accessibility to the transportation network across the city.&nbsp;A new project highlighting that is the Airport Trail interchanges &ndash; a project delivered in partnership with the Calgary Airport Authority which improves access and business operations in and around the Calgary International Airport,&rdquo; says Director of Transportation Infrastructure Kerensa Swanson Fromherz.</p>

<p>Infrastructure planning and investment continues to be a high priority for Calgarians as shown in the <a href="https://www.calgary.ca/cfod/csc/Pages/Citizen-Satisfaction.aspx">2019 Citizen Satisfaction Survey</a> and is a key driver for economic recovery.&nbsp;The City is using its resources to support the continued recovery and diversification of Calgary&rsquo;s economy and build the foundation of a great future. Our goals are to help create jobs and support new opportunities for investment, expansion, job growth and retention while delivering long-term value and affordability for all Calgarians.</p>

<p>&ldquo;We&rsquo;re building on our work from 2019, improving mobility choices for Calgarians with the continuation of the shared electric scooter pilot and an update of our Carsharing Policy. As Calgary continues to recover and grow, we want to ensure our transportation network is designed to grow with it,&rdquo; says Ryan Vanderputten, Director of Transportation Planning.</p>

<p>Here are 20 projects this year keeping Calgarians on the move:</p>

<p><strong>1. Shared electric scooter pilot</strong> - If you were missing scooting around to travel to your favourite restaurant, expect to see shared electric scooters (e-scooters) back on the streets in the first week of April (weather permitting) with a few changes to the pilot to help increase public safety.</p>

<p>&ldquo;One of the benefits of running a pilot project is that we have some flexibility,&rdquo; says Andrew Sedor, Transportation Planning Strategist. &ldquo;Calgarians provided feedback about e-scooters last year and as a result, we are making some changes to see if we can address some of the most common concerns.&rdquo; More details on what these changes are will be available soon on <a href="https://www.calgary.ca/Transportation/TP/Pages/Cycling/Cycling-Strategy/Shared-electric-scooter-pilot.aspx?redirect=/scootershare">Calgary.ca/scootershare</a>.</p>

<p><strong>2. The Future of 16 Avenue N.W.</strong> - This project combines planning and public engagement for two projects - the 16 Avenue N.W. Corridor Study (Sarcee Trail to Crowchild Trail) and the 16 Avenue N.W. Main Street project addressing current and future challenges to how people and goods move through the corridor. The Main Street Streetscape plan in Montgomery focuses on fostering a vibrant business environment and creating a unique identity that reflects the character of the community.</p>

<p>&ldquo;With Transportation Planning and Main Streets working together, we&rsquo;re able to focus on both mobility and placemaking to better serve the interests of the communities in the study area,&rsquo; says Madhuri Seera, Senior Transportation Engineer. To learn more about the project, visit <a href="http://www.calgary.ca/futureof16AvenueNW">Calgary.ca/futureof16AvenueNW</a>.</p>

<p><strong>3. Banff Trail Area Improvements</strong> - Multiple projects are being consolidated to provide better value for Calgarians. &ldquo;We&rsquo;re combining four adjacent projects that have funding, reducing multiple and consecutive disruptions to Calgarians who would otherwise be inconvenienced by repeated construction projects taking place back-to-back over the next few years&rdquo; says Kyle Hucik, Senior Transportation Engineer.</p>

<p>&ldquo;This work will improve connections and mobility in the area, and we&rsquo;ve coordinated it in such a way that our crews will come in and do everything all at the same time.&rdquo; Construction is set to begin this spring. Learn more at <a href="http://www.calgary.ca/BanffTrailAreaImprovements">Calgary.ca/BanffTrailAreaImprovements</a>.</p>

<p><strong>4. 42 Avenue S.E. Complete Streets</strong> - When thinking of up-and-coming spots in Calgary, 42 Ave. S.E. should be on your list. Located in a primarily industrial area, 42 Ave. is a unique stretch that connects to important destinations such as the Calgary Food Bank and Stanley Park, recently becoming home to a number of local businesses, including 10 craft breweries in a 7 km stretch.</p>

<p>&ldquo;The 42 Avenue area has seen a lot of change in the types of businesses and services it has to offer,&rdquo; says Transportation Engineer Ali Zaidi. &ldquo;These improvements will help to fill a gap and make the area more inclusive, better connected and more accessible for people that take transit, walk or wheel.&rdquo; Construction is set to begin this spring. Learn more at <a href="http://www.calgary.ca/42ave">Calgary.ca/42Ave</a>.</p>

<p><strong>5. 5 Street S.W. Underpass Enhancements</strong> - Located between 9 Avenue and 10 Avenue S.W., the goal of this project is to provide a safe, comfortable and attractive public space while encouraging increased pedestrian and cyclist movement between the Beltline and downtown Calgary.</p>

<p>&ldquo;We&rsquo;re focused on improving the environment for people walking and for cyclists by building a safe, well-lit underpass that connects our downtown neighbourhoods,&rdquo; said Senior Transportation Engineer Colin Chapman. This project is part of the broader Centre City Underpass Enhancement Program, which aims to improve downtown connections and includes enhancing existing underpasses. Learn more at <a href="http://www.calgary.ca/5stunderpass">Calgary.ca/5stunderpass</a>.</p>

<p><strong>6. Airport Trail Interchanges</strong> - This project will see the construction of two interchanges on Airport Trail &ndash; at 19 Street N.E. and Barlow Trail, improving access for movement of goods, services and people to and from YYC Calgary International Airport now and into the future.</p>

<p>&ldquo;During construction, we encourage people who drive to add extra time traveling to and from YYC, and along Airport Trail,&rdquo; said Senior Transportation Engineer Sig Undheim. &ldquo;In association with YYC, we are looking forward to building these interchanges to help keep Calgarians moving as effectively as possible.&rdquo; Learn more at <a href="http://www.calgary.ca/airporttrail">Calgary.ca/airporttrail</a>.</p>

<p><strong>7. Carshare Parking Policy</strong> - With more than 140,000 members registered with our previous car sharing operator, carsharing is a popular service for Calgarians. Council recently approved changes to our Carshare Parking Policies including new parking rules and a <a href="https://newsroom.calgary.ca/a-city-that-moves-the-future-of-carsharing-in-calgary/">revised fee structure</a> for carshare operators. We are actively working with interested carshare companies and expect to see one or more start operating in 2020.</p>

<p>"Overall our policies are well set up to support carsharing in Calgary. Based on discussions with other cities and several carshare companies, we have identified several adjustments that ensure we are keeping up with best practices," says Eric MacNaughton, Senior Transportation Engineer. To learn more, visit <a href="http://www.calgary.ca/carshare">Calgary.ca/carshare</a>.</p>

<p><strong>8. Main Streets</strong> - The City has developed streetscape master plans for <a href="https://www.calgary.ca/PDA/pd/Documents/main-streets/what-weve-learned/bowness-road-streetscape-masterplan.pdf">Bowness (Montgomery) Road NW</a>, <a href="https://www.calgary.ca/PDA/pd/Documents/main-streets/37_Street_SW_Streetscape_Master_Plan.pdf">37 Street SW</a> and <a href="https://www.calgary.ca/PDA/pd/Documents/main-streets/local-area-maps/17_Avenue_SW_Streetscape_Master_Plan.pdf">17 Avenue SW</a> with each plan aimed at creating a vibrant destination, celebrating the character of the community, and encouraging diversity of businesses and buildings. Construction on these projects will start this spring.</p>

<p><strong>&nbsp; &nbsp;Montgomery (Bowness) Main Street</strong> - The Montgomery (Bowness) Main Streets project, between MacKay Road and 52 Street NW, will include a new road surface, multi-use pathway and wider sidewalks on both sides of Bowness Road as well as enhanced pedestrian crossings for safety along Bowness Road NW. There will also be intersection improvements, new street lighting, and better access to transit stops. Learn more at <a href="http://www.calgary.ca/montgomerymainstreet">Calgary.ca/montgomerymainstreet</a>.</p>

<p><strong>&nbsp; &nbsp; 17 Avenue Main Street</strong> - The 17 Avenue Main Streets project, between 37 Street SW and Richmond Road SW, will include upgrading underground utilities on 17 Avenue between 29 and 26 Street SW, and on 26 Street between 17 Avenue and Bow Trail. There will also be a number of intersection improvements, traffic signal relocations and upgrades, and improved pedestrian crossings as well as maintenance work on the 17 Avenue Bridge over Crowchild Trail. Learn more at <a href="http://www.calgary.ca/west17mainstreet">Calgary.ca/west17mainstreet</a>.</p>

<p><strong>&nbsp; &nbsp; 37 Street Main Street</strong> - Construction on 37 Street Main Streets project, between Bow Trail and Richmond Road SW, starts this spring and includes intersection improvements for pedestrian safety, a new road surface, multi-use pathway, wider sidewalks, and a boulevard space with trees and green amenities. Learn more at <a href="http://www.calgary.ca/37streetmainstreet">Calgary.ca/37streetmainstreet</a>.</p>

<p><strong>9. Eau Claire Public Realm</strong> - The City is investing in Eau Claire as part of our Downtown Strategy to create an active and lively cultural destination. Across multiple, connected projects, the goal is to improve connections in and out of Eau Claire; build on Eau Claire&rsquo;s character to create great spaces to live, work, play and shop; and increase the resilience of our downtown through a new flood barrier. Some projects in the area will be constructed over the next two years, while others won&rsquo;t be realized for several years.</p>

<p>&ldquo;It&rsquo;s important that we design and build each project to meet current needs and to lay the foundation for expected future demand as Calgary grows and evolves,&rdquo; said Joyce Tang, Program Manager, Urban Initiatives. &ldquo;Eau Claire&rsquo;s public spaces are important to Calgarians and we want to make sure that we create safe, accessible and beautiful spaces that connect downtown, the river and beyond.&rdquo; Learn more at <a href="http://www.calgary.ca/eauclaire">Calgary.ca/eauclaire</a>.</p>

<p><strong>10. 9 Avenue S.E. Bridge Replacement</strong> - Since 1909, the 9 Ave. S.E. bridge has served as a gateway over the Elbow River between the communities of Inglewood & Ramsay, East Victoria Park, East Village and Calgary&rsquo;s city centre. After 110 years of service, it&rsquo;s time to bring the structure up to modern design and engineering standards, helping to connect people who walk, cycle and drive across its span for the next century.</p>

<p>Construction on the new bridge began in November 2019, following completion of a temporary bridge and removal of the old structure in fall 2019. &ldquo;It&rsquo;s exciting to see the progress that&rsquo;s been made on bringing the new bridge to life,&rdquo; says Manager of Bridges and Structures Evan Fer. &ldquo;You&rsquo;ll notice the structure really starting to take shape over the next few months, and we look forward to opening the bridge for citizens and visitors to enjoy this fall.&rdquo; To learn more, visit <a href="http://www.calgary.ca/9Ave">Calgary.ca/9Ave</a>.</p>

<p><strong>11. Neighbourhood Streets Program</strong> - As communities grow and change, a new Neighbourhood Streets Policy is being launched to replace the 2003 Traffic Calming policy. The updated policy includes many of the current tools to influence on-street travel behaviour but is being updated to create a more inclusive and user-friendly intake process to ensure equitable investment across communities.</p>

<p>Starting with the North Hill Local Area Plan, Transportation will begin work within the new policy and implement quick wins by installing temporary materials to address missing links and traffic issues for people walking and wheeling in the area. &ldquo;The new policy recognizes that The City works with communities in many ways beyond just traffic calming to enhance residential streets for moving, spending time and meeting neighbours. Our full range of toolkits involves residents and partners through block parties, paint the pavement or street murals, and adaptive sidewalks. Together, we can build healthier more liveable neighbourhoods&rdquo; says Jen Malzer, Transportation Engineer. Learn more and provide your input at <a href="http://www.calgary.ca/NeighbourhoodStreets">Calgary.ca/NeighbourhoodStreets</a>.</p>

<p><strong>12. Green Line -</strong> Work to prepare Green Line south of the Elbow River (Segment 1) for LRT construction continues into 2020. Subject to Council&rsquo;s April decision for the entire Stage 1 alignment from 16 Avenue N to 126 Avenue S, the RFP for Segment 1 construction is expected to go to market in 2020, with construction expected to start in 2021. Learn more at <a href="http://www.calgary.ca/greenline">Calgary.ca/greenline</a>.</p>

<p><strong>13. Paving Programs -</strong> The City&rsquo;s Annual Pavement Rehabilitation Program is more than $30 million of annual investment to maintain our road and sidewalk infrastructure in good and safe operating condition, using both City and private contractors to complete the work.</p>

<p>&ldquo;Our life cycle paving program is less costly than full road reconstruction and allows Calgary&rsquo;s roads and sidewalks to be improved, returning them to like-new condition,&rdquo; says Barry Poon, Manager of Roads Construction.</p>

<p>The surface overlay program is completed by City forces Paving crews, who work through the summer months restoring and improving Calgary streets and sidewalks to help citizens move around safely and efficiently. Learn more at <a href="https://www.calgary.ca/paving">Calgary.ca/paving</a>.</p>

<p><strong>14. New Traffic Management Centre (TMC) technologies</strong> - An upgraded Traffic Management Centre (TMC) is set to launch in the summer of 2020 replacing the original system from 1995. As part of this project, staff and industry experts have begun to integrate various new technologies to receive and disseminate traffic data to serve the mobility needs of citizens and businesses.</p>

<p>&ldquo;We have integrated a direct feed from the 911 Computer Aided Dispatch to receive traffic incident information immediately,&rdquo; says Ravi Seera, Manager of Traffic. &ldquo;We have also integrated crowd-sourcing data into our traffic system so real-time information is leveraged to improve system performance.&rdquo; To learn more, visit the <a href="https://www.calgary.ca/Transportation/Roads/Pages/Traffic/Traffic-management/Traffic-management.aspx">project page</a>.</p>

<p><strong>15. 16 Avenue North Connected Vehicle Project</strong> - Beginning in 2020, we will be installing Connected Vehicle equipment at 12 intersections along 16 Avenue North and in several City emergency vehicles allowing the intersections and connected vehicles to &ldquo;digitally talk&rdquo; to each other. Once tested and adopted, these devices will be able to communicate between vehicles, braking technology and smart devices. &ldquo;Messages could include information that a light is turning red or warnings that a vehicle (equipped with the technology) is quickly approaching the intersection at a high-rate of speed,&rdquo; says Jodie Marcyniuk, Traffic Engineer.</p>

<p>As car manufacturers begin installing this type of equipment as a standard feature on vehicles, we hope to offer applications that will be beneficial for all mobility users. To learn more, visit the <a href="https://www.calgary.ca/Transportation/Roads/Pages/Traffic/Traffic-management/Connected-Vehicle-pilot-project.aspx">project page</a>.</p>

<p><strong>16. My Fare: Calgary Transit&rsquo;s new mobile payment app</strong> - Calgary Transit is always looking for ways to provide excellent customer service, meeting customer needs now and into the future. This year we are introducing a mobile app that will provide customers additional convenience in buying and displaying their transit fares, making it easier to get around our city.</p>

<p>&ldquo;We&rsquo;re excited for the launch of My Fare and we&rsquo;ve heard from our customers that they are, too. We know our customers come from many different places and use transit in many different ways, so we are thrilled to offer them different options for making their way through the city,&rdquo; says IT Manager Mashhood Qazi. To learn more, visit <a href="http://www.calgarytransit.com/myfare">Calgarytransit.com/MyFare</a>.</p>

<p><strong>17. Crowchild Trail Upgrades</strong> &ndash; Upgrades to Crowchild Trail kicked off in October 2017 and will wrap up by the end of this summer. This $87 million project is adding lanes for drivers, rearranging off-ramps, and improving surrounding roads and pathways while more than 100,000 vehicles per day continue travelling along this major arterial road.</p>

<p>&ldquo;Keeping Calgarians moving along Crowchild Trail has been a priority because commuters, businesses and emergency services all rely on using this road 24/7,&rdquo; said Jeff Baird, Senior Transportation Engineer. &ldquo;This year, we&rsquo;re in the process of completing the work on the bridge over the river, rehabilitating adjacent bridges, and polishing things off with final landscaping and paving. We&rsquo;re all looking forward to the finished product.&rdquo;</p>

<p>Once completed, Crowchild Trail will manage traffic better and improve connections for both drivers and pathway users in the area. To learn more, visit <a href="http://www.calgary.ca/crowchild">Calgary.ca/crowchild</a>.</p>

<p><strong>18. Calgary Ring Road construction</strong> - In 2020 Alberta Transportation will continue the construction of the <a href="http://www.swcrrproject.com/">Southwest Calgary Ring Road</a> and the <a href="http://www.westringroad.ca/">West Calgary Ring Road</a>. Construction on two Ring Road integration projects will be completed by The City in 2020:</p>

<ul>
<li>Glenmore Trail widening and interchange upgrade &ndash; top-lift paving and landscaping</li>
<li>Bow Trail widening and intersection improvements &ndash; intersection work and landscaping</li>
</ul>

<p>The north side of Calgary has experienced significant population and traffic growth over the last few years. We have allocated funding to construct a number of interchanges along Stoney Trail North. The first to move forward on construction is the new interchange at Stoney Trail and 14 Street N.W. The other interchange projects are in the planning process and include Stoney Trail/Shaganappi Trail N.W., Stoney Trail/Centre Street N., and Stoney Trail/11 Street N.E. Learn more at <a href="http://Calgary.ca/StoneyNInterchanges">Calgary.ca/StoneyNinterchanges</a>.</p>

<p><strong>19. MAX Yellow (Southwest BRT)</strong> - Crews will be back in the spring of 2020 to complete landscaping work, as well as some asphalt and concrete work along the route, resurfacing 14 Street lanes from 75 Avenue to Southland Drive, and overall site clean-up.</p>

<p>To learn more visit <a href="http://www.calgary.ca/swbrt">Calgary.ca/swbrt</a>.</p>

<p><strong>20. Glenmore Trail/68 Street S.E. Intersection Improvements -</strong> In partnership with Point Trotter and Dufferin North Industrial areas south of Glenmore Trail and proposed development north of Glenmore Trail, this project will see the full development of the north leg of the intersection and improve 68 Street S.E. to and from the south.</p>

<p>&ldquo;The reconstruction of this intersection will improve access for existing nearby industrial development and open up new industrial development opportunities on private and municipally-owned lands within the Southeast 68 Street Industrial Area Structure Plan,&rdquo; said Senior Transportation Engineer Nik Danilov. To learn more visit <a href="http://www.calgary.ca/glenmore68st">Calgary.ca/glenmore68st</a>.</p>]]></description><category><![CDATA[Transportation,banner,feature]]></category>
            <pubDate>Thu, 05 Mar 2020 10:14:55 -0700</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_crowchild-trail-upgrades-before-after.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_crowchild-trail-upgrades-before-after.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/crowchild-trail-upgrades-before-after.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[Crowchild-Trail-Upgrades-Before-After]]></pp:imageTitle></item><item>
                        <title>Bow Trail S.W. closures planned for the weekend</title>
                        <link>https://newsroom.calgary.ca/bow-trail-sw-closures-planned-for-the-weekend/</link>
                        <guid>https://newsroom.calgary.ca/bow-trail-sw-closures-planned-for-the-weekend/</guid><pp:caseid>369561</pp:caseid><description><![CDATA[<p>The old (existing) bridge will be permanently closed to pedestrian traffic at 9:00 pm on Friday, December 6<sup>th</sup>. Demolition of the old bridge is scheduled to begin at that time.</p>

<ul>
<li>Starting at 9 p.m. on December 6, Bow Trail S.W. will be closed between 33<sup>rd</sup> and 37<sup>th</sup> Streets S.W. and traffic will be detoured to 17 Avenue S.W. through 12:00 noon on Saturday, December 7<sup>th</sup>. In addition, Balsam Drive will be closed to thru traffic during the demolition work.</li>
<li>Various lane closures will continue on Bow Trail through Saturday, December 7 until 5 p.m. Additional demolition work on the east ramp will require traffic restrictions on Balsam Drive only on Monday, December 9 and Tuesday, December 10.</li>
</ul>

<p>&ldquo;This work will create construction noise and dust in the area and is expected to result in travel delays on local roads &ndash; please plan accordingly,&rdquo; says Dwain Babiak, Senior Structural Engineer with The City of Calgary. &ldquo;Pedestrians using pathways in the area should follow marked detours and be aware of construction activities and the movement of construction equipment and trucks during performance of the work.&rdquo;</p>

<p>The new bridge is expected to open to the public before 7:00 am on Monday, December 9<sup>th</sup>. Some portions of the bridge (east stair) may remain closed until final work is completed and bridge users should heed barricades restricting access to these areas.</p>

<p>We thank residents in the area, and commuters travelling through the area for their patience and understanding during this phase of construction. This work is weather dependent, and may be rescheduled on short notice. Visit Calgary.ca and search &lsquo;Westbrook Pedestrian Bridge&rsquo; for more information on the project.</p>

<p style="text-align: center;">-30-</p>]]></description><category><![CDATA[city news,Transportation]]></category>
            <pubDate>Wed, 04 Dec 2019 11:29:04 -0700</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Bow Trail S.W. closure planned for Wednesday night</title>
                        <link>https://newsroom.calgary.ca/bow-trail-sw-closure-planned-for-wednesday-night/</link>
                        <guid>https://newsroom.calgary.ca/bow-trail-sw-closure-planned-for-wednesday-night/</guid><pp:caseid>364702</pp:caseid><description><![CDATA[<p>Work is nearing completion on the Westbrook Pedestrian Overpass, with a bridge lift scheduled for the evening of Wednesday, October 30. This work will require extensive closures around the construction area (detailed below):</p>

<ul>
<li>There will be a temporary road closure on Bow Trail between 33 Street S.W. and 37 Street S.W. from 9&nbsp;p.m. on Wednesday, October 30 to 5&nbsp;a.m. on Thursday, October 31. Traffic will be detoured on 17 Avenue S.W. Keep in mind this work is weather dependent.</li>
<li>Construction will cause additional noise in the area. Commuters are advised to expect major delays in the area beginning on Wednesday night. Use alternate routes when possible.</li>
<li>Pedestrians looking to use the existing pedestrian bridge to cross Bow Trail during the road closure will be detoured around the site between 33rd Street S.W. and 37th Street S.W.</li>
<li>Bow Trail will have reduced lanes between 33 Street S.W. and 37 Street S.W. from 10 a.m. until 2 p.m. on Friday, November 1.</li>
</ul>

<p>&ldquo;This work marks an important milestone in the construction of the new bridge. The main span will be lifted above the roadway and secured onto the main piers,&rdquo; says Dwain Babiak, Senior Structural Engineer with The City of Calgary. &ldquo;The activities associated with this work will require a full road closure on Bow Trail. We thank citizens for their patience during construction as we continue to work towards opening the new bridge to pedestrian traffic this year.&rdquo;</p>

<p>Following this work, demolition of the old bridge is scheduled for late November. It is expected the new bridge will open to pedestrians at that time, barring weather delays.</p>

<p style="text-align: center;">- 30 -</p>]]></description><category><![CDATA[banner,Transportation,city news]]></category>
            <pubDate>Tue, 29 Oct 2019 09:05:15 -0600</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_bowtrailpedbridge-807470.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/uploads/1485/500_bowtrailpedbridge-807470.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/bowtrailpedbridge-807470.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[bow trail ped bridge]]></pp:imageTitle></item><item>
                        <title>Snow Update - Tuesday, October 8 11 a.m.</title>
                        <link>https://newsroom.calgary.ca/snow-update---tuesday-october-8-11-am/</link>
                        <guid>https://newsroom.calgary.ca/snow-update---tuesday-october-8-11-am/</guid><pp:caseid>361146</pp:caseid><description><![CDATA[<p>With snow falling early Tuesday and continuing throughout the day, Calgarians are reminded to drive, cycle and walk with winter conditions in mind. Icy patches may exist on some roads, sidewalks and pathways.</p>

<p>Crews will continue focusing on salting and plowing high-volume <a href="https://maps.calgary.ca/SNICPriorityRoutes/">Priority 1 routes</a> (such as Crowchild Trail and Glenmore Trail) to keep the highest number of citizens moving safely through The City. It is expected that plowing operations will intensify through the day as snowfall becomes heavier.</p>

<p>Snow is anticipated to slow Tuesday evening. When the snowfall ends, this will activate the&nbsp;<a href="https://www.calgary.ca/Transportation/Roads/Pages/Road-Maintenance/Snow-and-ice-control/SNIC-sanding-plowing-priorities.aspx">seven day snow plan</a>, and crews will begin working down the priority list.</p>

<p>At this time, The City does not anticipate the need to call a&nbsp;<a href="https://www.calgary.ca/Transportation/Roads/Pages/Road-Maintenance/Snow-and-ice-control/Snow-Route-parking-bans.aspx">snow route parking ban</a>.</p>]]></description><category><![CDATA[city news,Transportation]]></category>
            <pubDate>Tue, 08 Oct 2019 11:07:01 -0600</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_snowplow-700356.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_snowplow-700356.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/snowplow-700356.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[snow plow]]></pp:imageTitle></item><item>
                        <title>The City of Calgary is ready for snow</title>
                        <link>https://newsroom.calgary.ca/the-city-of-calgary-is-ready-for-snow/</link>
                        <guid>https://newsroom.calgary.ca/the-city-of-calgary-is-ready-for-snow/</guid><pp:caseid>359540</pp:caseid><description><![CDATA[<p>With the first snowfall of the winter season forecasted this weekend, The City of Calgary is ready to jump into action to help commuters stay safe and keep moving.</p>

<p>&ldquo;In anticipation of snowfall over the next few days, we have been getting our vehicles and crews ready,&rdquo; says Roads Maintenance District Manager Jim Fraser. &ldquo;This first storm of the season will likely result in accumulation of snow on the streets, but the warm road temperatures and mild weather should make this a relatively easy clean-up for us.&rdquo;</p>

<p>The City&rsquo;s Snow and Ice Control (SNIC) program plan is organized months before the winter season to account for a variety of weather conditions. Under the plan, crews sand, salt and plow roads based on a Council-approved priority system - the more traffic there is on a roadway, the higher the priority.</p>

<p>&ldquo;This priority system keeps the greatest number of commuters, moving quickly and safely,&rdquo; says Fraser.</p>

<p>While City crews are prepared, the first snowfall of the season always seems to catch people a little off guard. For this reason, The City is reminding drivers to prepare for potentially slower driving conditions. &ldquo;Give yourself a little bit of extra time, plan for delays, slow down and drive to the conditions,&rdquo; adds Fraser.</p>

<p>Drivers are reminded to leave at least 10 metres distance - about three car lengths - between your vehicle and the working sanders, graders and other snow removal equipment. Do not pass working sanders or equipment.</p>

<p><strong>Stay Informed</strong></p>

<p>There are several ways Calgarians can stay informed on winter road conditions, such as visiting <a href="http://www.calgary.ca/snow">calgary.ca/snow</a>, following us on Twitter <a href="https://twitter.com/yyctransport">@yyctransport</a>, viewing our <a href="http://www.calgary.ca/Transportation/Roads/Pages/Traffic/Advisories-closures-and-detours/Calgary-Traffic-Cameras.aspx">traffic cameras</a> or by contacting 311.</p>

<p>In addition, The City is launching a new Snow Route notification system through the myID system. Citizens, particularly those who live on snow routes, are encouraged to sign up for these text and e-mail notifications.</p>

<p>To sign up, users can go to <a href="https://myid.calgary.ca/idm/">myID.calgary.ca</a>, sign in, select &ldquo;Open a Service&rdquo;, click on &ldquo;Transportation&rdquo; and click on &ldquo;Roads Notifications&rdquo;. Alternatively, they can go to <a href="https://roadsnotifications.calgary.ca/">https://roadsnotifications.calgary.ca</a> and subscribe.</p>

<p>It is important to note that users of the previous email notification system must also register for the new application with a MyID account, and will be contacted to make the switch via email.</p>

<p align="center">- 30 -</p>]]></description><category><![CDATA[Transportation,city news,banner]]></category>
            <pubDate>Thu, 26 Sep 2019 11:05:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_snowtractor-941011.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_snowtractor-941011.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/snowtractor-941011.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[snow tractor]]></pp:imageTitle></item><item>
                        <title>New rules for safer roads</title>
                        <link>https://newsroom.calgary.ca/new-rules-for-safer-roads/</link>
                        <guid>https://newsroom.calgary.ca/new-rules-for-safer-roads/</guid><pp:caseid>355059</pp:caseid><pp:subtitle>Safe passing bylaw comes into effect September 1</pp:subtitle><description><![CDATA[<p>New rules are now in place for all road users with updates to <a href="http://www.calgary.ca/cyclingsafety">The City of Calgary&rsquo;s Transportation Bylaws</a>. Among the changes is a new <a href="http://calgary.ca/safepassing">safe passing bylaw</a>, coming into effect on September 1, requiring at least one metre of space to be given when passing a cyclist (similar distance as an open car door).</p>

<p>&ldquo;These changes are a combination of extensive public engagement, research, industry best practices and align with current user behavior," says Andrew Sedor, Business Development Coordinator with The City of Calgary. &ldquo;The good news is most people are already safely accessing The City&rsquo;s transportation network and whether you&rsquo;re on two wheels or four, these updates ensure roads, sidewalks, pathways and cycle tracks are accessible and inclusive for all.&rdquo;&nbsp;</p>

<p>Changes already in effect include:</p>

<ul>
<li><a href="https://www.calgary.ca/Transportation/TP/PublishingImages/cycling-education/modes-travelling-downtown-cycle-ways.jpg">Allowing skateboards, scooters, inline skates, etc.</a> on cycle tracks and in public spaces in the downtown core, including Olympic Plaza and along Stephen Avenue.</li>
</ul>

<ul>
<li>Allowing electric pedal assist bicycles on Calgary Transit during the same non-peak hours that other bicycles are permitted and all bikes weighing less than 55lbs are now permitted on bike racks on the front of City busses.</li>
</ul>

<ul>
<li>People cycling can now&nbsp;<a href="https://www.calgary.ca/Transportation/TP/Documents/cycling/Cycling%20Education/transportation-bylaw-cycling-hand-signals-postcard.pdf" target="_blank">use either arm to indicate a right turn</a>&nbsp;and can yield instead of coming to a full stop when entering/exiting a roadway or sidewalk from/to a pathway.</li>
</ul>

<p>Additionally, a <a href="http://calgary.ca/safepassing">safe passing distance</a>&nbsp;for drivers and cyclists comes into effect on September 1. The new bylaw requires of a minimum of one metre (or 1.5 m if the speed limit is over 60km/h.) from the outermost edge of the bicycle (i.e. the handlebars). To pass someone riding a bicycle, drivers can now legally cross a solid yellow line (when safe to do so). These changes are in line with the regulations in most Canadian provinces and United States.</p>

<p>Calgarians are encouraged to educate themselves on the new safe passing distance to avoid a potential fine of $203. Cyclists are also required to ride as close to the side of the road as is safe.</p>

<p>For more information on getting around Calgary or traffic laws outlined in the <a href="http://www.qp.alberta.ca/1266.cfm?page=2002_304.cfm&leg_type=Regs&isbncln=0779738624">Alberta Traffic Safety Act</a>, visit <a href="https://www.calgary.ca/Transportation/TP/Pages/Cycling/Cycling-Education-and-Safety/Cycling-Education.aspx?redirect=/cyclingsafety">calgary.ca/cyclingsafety</a>.</p>

<p align="center">-30-</p>]]></description><category><![CDATA[city news,Transportation,banner]]></category>
            <pubDate>Mon, 26 Aug 2019 11:51:58 -0600</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_safepassingbylaw-450848.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_safepassingbylaw-450848.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/safepassingbylaw-450848.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[safe passing bylaw]]></pp:imageTitle></item><item>
                        <title>Green Line Stage 1 update</title>
                        <link>https://newsroom.calgary.ca/green-line-stage-1-update/</link>
                        <guid>https://newsroom.calgary.ca/green-line-stage-1-update/</guid><pp:caseid>342609</pp:caseid><description><![CDATA[<p>June 26, 2019 &ndash; CALGARY -- The City&rsquo;s top priority is to build the Green Line within our budget of $4.9 billion while maintaining our project vision to build a transit service that connects existing communities in north and southeast Calgary connecting people and places.</p>

<p>The Green Line is an important strategic project for The City of Calgary that will help move people across the city to different economic centres like the downtown core and Quarry Park. Stage 1 of the Green Line is an investment in Calgary&rsquo;s future that will provide more options for Calgarians to move around the city.</p>

<p>Over the last year and a half, The City has worked to refine the Green Line design, specifically the tunneled portion of stage 1 between 16 Avenue N and 4 Street S.E. We&rsquo;ve worked closely with industry experts and are thoroughly evaluating all possible risks, including technical, financial and schedule, associated with building the Downtown and Beltline portions of the project.</p>

<p>Based on our analysis and what we&rsquo;ve heard we will be continuing to evaluate how to build the Green Line through the Downtown and Beltline. This means we will be investigating ways to shorten the tunnel and bring as much to surface as possible. Starting this summer, The City will be hosting information sessions to show Calgarians what we have learned through the tunnel constructability reviews and plans to move forward.</p>

<p>We currently have 16 kilometres of the project ready to be built today, and we will be releasing a Request for Qualifications (RFQ) for the portion of the project between 4 Street S.E. and 126 Avenue S.E. Moving forward with this portion of the project now will be an economic stimulant by bringing jobs to Calgary and will allow The City to take advantage of lower construction costs.</p>

<p>On opening day, Stage 1 of the Green Line will connect nearly 200,000 people to over 100,000 jobs and move approximately 60 &ndash; 65,000 riders per day.</p>

<p style="text-align: center;">- 30 -</p>]]></description><category><![CDATA[Transportation]]></category>
            <pubDate>Wed, 26 Jun 2019 17:42:28 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>City announces snow route parking ban in effect as of 12 pm on Monday, February 18</title>
                        <link>https://newsroom.calgary.ca/city-announces-snow-route-parking-ban-in-effect-as-of-12-pm-monday-february-18/</link>
                        <guid>https://newsroom.calgary.ca/city-announces-snow-route-parking-ban-in-effect-as-of-12-pm-monday-february-18/</guid><pp:caseid>322735</pp:caseid><description><![CDATA[<p><em>Saturday, February 16, 2019</em></p>

<p><em>For immediate release</em></p>

<p><strong><em>City announces snow route parking ban</em></strong></p>

<p>The City of Calgary is advising citizens of a snow route parking ban that will go into effect on Monday, February 18 at 12 p.m. Due to significant accumulations of snow and high drifting across Calgary, the Snow Route parking bans are expected to be in effect for 72 hours, or until lifted by The City.</p>

<p><strong>How snow routes work</strong></p>

<p>Calgarians who live on a snow route are asked to move their vehicles during the ban.&nbsp;Vehicles that remain parked on these roads are subject to enforcement, up to and including a parking tag and tow. Snow routes are marked by a blue sign with a white snowflake. To find more information regarding snow route parking bans, visit Calgary.ca/snow.</p>

<p>The snow route parking ban will help crews clear Priority 2 routes (such as Kensington Road, Fairmount Drive, Bus Routes) as efficiently and safely as possible. Snow clearing operations are ongoing. Parked cars must be moved from snow routes when a parking ban is called. Vehicles that remain parked on these roads during the ban are subject to enforcement, up to an including a parking ticket and tow.</p>

<p>Vehicles can continue to park in the ParkPlus system zones during the day (from 6 a.m. to 9 p.m.) Monday to Saturday during a Snow Event. For more information on snow route parking bans, visit Calgary.ca/snow and click <em>more information</em> under the snow route banner.</p>

<p><strong>Roads continues tackling the snow</strong></p>

<p>Roads crews are working around the clock maintaining Calgary&rsquo;s roads to keep Calgarians on the move.</p>

<p>&ldquo;Crews have been working around the clock since before the snow started falling on Friday,&rdquo; says Chris McGeachy, spokesperson for Roads. &ldquo;We&rsquo;ve seen numerous snow events in the past few weeks, coupled with frigid temperatures that continue challenging our snow clearing efforts. The parking ban will help us make good progress on our bus routes and connector roads.&rdquo;</p>

<p>Snow route parking bans&nbsp;support snow plowing operations by removing parked vehicles from the streets, and allowing crews to clear snow from Calgary roads more efficiently. &ldquo;Our goal is always to keep the largest amount of Calgarians moving safely as quickly as possible,&rdquo; adds McGeachy.</p>

<p>For snow route maps and more information, visit Calgary.ca/snow.</p>

<p>The City of Calgary would like to thank Calgarians for their cooperation during snow route parking bans.</p>

<p align="center">- 30 -</p>

<p><strong>Public Contact Information:</strong></p>

<p>The City of Calgary, 3-1-1 Operations Centre</p>

<p>Phone: 3-1-1 or from outside the local calling area phone 403.268.CITY (2489)</p>

<p><strong>Media Contact Information:</strong></p>

<p>Online: calgary.ca/mediainquiry</p>

<p>Email: transportationmedia@calgary.ca</p>

<p>Daytime media line: 403.828.2954, Option #1</p>

<p>After hours SNOW media line: 403.268.1521</p>

<p>Available 6 a.m. &ndash; 10 p.m. Monday &ndash; Friday; 8 a.m. &ndash; 8 p.m. Saturday-Sunday</p>]]></description><category><![CDATA[Transportation]]></category>
            <pubDate>Sat, 16 Feb 2019 15:30:00 -0700</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_snowrouteparkingban.png?99075" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/uploads/1485/500_snowrouteparkingban.png?99075</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/snowrouteparkingban.png?99075</pp:imageOriginal><pp:imageTitle><![CDATA[snowrouteparkingban.png]]></pp:imageTitle></item><item>
                        <title>Winter Cycling Congress showcases Calgary to the world</title>
                        <link>https://newsroom.calgary.ca/winter-cycling-congress-showcases-calgary-to-the-world/</link>
                        <guid>https://newsroom.calgary.ca/winter-cycling-congress-showcases-calgary-to-the-world/</guid><pp:caseid>320385</pp:caseid><description><![CDATA[<p>The City of Calgary is hosting the seventh annual <a href="http://calgary.ca/wcc2019">Winter Cycling Congress</a> to learn and share best practices for how winter cycling contributes to building an accessible, equitable and resilient city. Experts from around the world will be on-hand February 6-8 at the new Central Library to discuss how to support winter policies for transportation, recreation and overall citizen wellbeing in northern cities.</p>

<p>&ldquo;Northern cities have a lot to learn from one another and we look forward to applying what we learn about winter city planning from colleagues visiting from Sweden, Finland, Russia, the United States and other parts of Canada,&rdquo; says Katherine Glowacz, Active Transportation Planner with The City of Calgary.</p>

<p>Calgary was chosen by the <a href="http://www.wintercycling.org/">Winter Cycling Federation</a> to host the congress because of the dedication and commitment in embracing year-round cycling. The cycle track, pathway system and snow clearing are highlighted as noteworthy infrastructure practices that contribute to the Winter Cycling Federation vision; winter cycling is for everyone, where cycling year-round is understood as a normal and practical, where cycling is a safe and viable transportation option for people of all ages and abilities.</p>

<p>&ldquo;Calgary is a great place to give winter cycling a try.&nbsp;We have many nice days during our winter season and even after snow has fallen, The City clears designated portions of our cycling network,&rdquo; says Glowacz.</p>

<p>On average, there are three times as many daily winter bicycle trips along the cycle track routes than before the cycle tracks were installed and about 30 per cent of summer cyclists continue to ride through the colder months.</p>

<p>In conjunction with the congress, Calgarians are encouraged to participate in free events that celebrate our city as a winter city. Visit the Winter Cycling Congress online at <a href="http://calgary.ca/wcc2019">calgary.ca/wcc2019</a> for more information on the events and Congress.</p>

<p align="center">-30-</p>]]></description><category><![CDATA[Transportation,city news,banner]]></category>
            <pubDate>Tue, 05 Feb 2019 09:55:00 -0700</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_cyclinginyyc-peacebridge1-935051.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_cyclinginyyc-peacebridge1-935051.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/cyclinginyyc-peacebridge1-935051.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[Cycling in YYC - Peace Bridge1]]></pp:imageTitle></item><item>
                        <title>Revisions to heavy vehicle restrictions on 9 Avenue S.E. bridge</title>
                        <link>https://newsroom.calgary.ca/revisions-to-heavy-vehicle-restrictions-on-9-avenue-se-bridge/</link>
                        <guid>https://newsroom.calgary.ca/revisions-to-heavy-vehicle-restrictions-on-9-avenue-se-bridge/</guid><pp:caseid>316489</pp:caseid><description><![CDATA[<p>Calgary &ndash; As a precautionary measure, heavy vehicle restrictions on the 9 Avenue S.E. bridge into Inglewood are being revised. The City has also closed one lane of traffic in order to reduce weight on the bridge.</p>

<p>Currently, trucks heavier than 8.5 tonnes are not allowed to cross the bridge between 7 Street and 8 Street S.E. The change means trucks heavier than 5 tonnes (11,000 lbs) will no longer be allowed to use the bridge. The decision was made following a recent inspection of the bridge.</p>

<p>&ldquo;The bridge structure has served Calgary for 110 years. This restriction is being put in place to ensure viability until it is replaced. We are now seeing the impact of heavy traffic and have decided to reduce the weight allowance,&rdquo; says Charmaine Buhler, Manager of Bridge Maintenance at The City.</p>

<p>The new restriction will have the following impacts:</p>

<ul>
<li>Traffic lanes on the bridge will be reduced from three lanes to two lanes.</li>
<li>Heavy trucks over 5 tonnes will be detoured.</li>
</ul>

<p><strong>Detour information</strong></p>

<p>Trucks coming from the east (inbound to downtown) will be asked to detour via two&nbsp;methods:</p>

<ul>
<li>Vehicles inbound from 17 Avenue/Blackfoot Trail S.E. will be asked to detour via 26 Avenue to Dartmouth Road, 25 Avenue, northbound Macleod Trail and into Downtown.</li>
<li>Vehicles already on 9 Avenue S.E. will detour via 8 Street to MacDonald Avenue to 12 Avenue and into downtown.</li>
</ul>

<p>The outbound detour will have vehicles turn right to 4 Street S.E. to 12 Avenue and MacDonald Avenue to 8 Street.</p>

<p><strong>New 9 Ave S.E. Bridge in the works</strong></p>

<p>A construction tender is in market right now to hire a contractor to build the new 9 Avenue S.E. bridge which will be accessible to heavy trucks. Construction is expected to begin on the new bridge in 2019 and open to traffic in late 2020. For more information about the future 9 Avenue S.E. bridge, please go to <a href="http://www.calgary.ca/9avebridge">calgary.ca/9avebridge</a>.</p>]]></description><category><![CDATA[Transportation]]></category>
            <pubDate>Thu, 24 Jan 2019 16:01:24 -0700</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Pedestrian underpass below Glenmore Trail closing due to safety concerns</title>
                        <link>https://newsroom.calgary.ca/pedestrian-underpass-below-glenmore-trail-closing-due-to-safety-concerns/</link>
                        <guid>https://newsroom.calgary.ca/pedestrian-underpass-below-glenmore-trail-closing-due-to-safety-concerns/</guid><pp:caseid>311893</pp:caseid><description><![CDATA[<p>The City of Calgary has made the decision to permanently close the pedestrian underpass that runs beneath Glenmore Trail to the east of Macleod Trail (beside the LRT tracks). The decision was made in cooperation with the Calgary Police Service, who raised safety concerns stemming from reports of regular incidents of drug use and social disorder.</p>

<p>&ldquo;Through routine checks in the area, officers have identified the underpass as a location for consistent criminal activity,&rdquo; explains Constable Jake Tyerman, Community Resource Officer, Calgary Police Service. &ldquo;Working with our partners, we support the decision to close this underpass as it directly addresses the unintended consequences of an under-utilized public space.&rdquo;</p>

<p>The City&rsquo;s Transportation Department investigated the concerns at this location, counted pedestrian usage (averaging 14 people per day) and assessed the feasibility of completing a closure of the underpass. Based on these factors, it was determined a closure of this underpass was the best course of action.</p>

<p>Alternate crossings of Glenmore Trail are located at Macleod Trail and Fairmount Drive.</p>

<p>Work to close the underpass will begin on Dec. 11, 2018 and is expected to take two to three days, weather dependent. Following the closure, the north sidewalk ramps, as well as the south stairway and sidewalk will remain open to maintain the pedestrian connection across the LRT tracks.</p>

<p>To ensure those affected by the closure are informed, signage will be posted at the underpass and nearby businesses have been notified.</p>

<p align="center">-30-</p>

<p align="center"><img alt="" src="//content.presspage.com/uploads/1485/500_glenmoretrailcrossing-327275.png?x=1544462656457" style="width: 361px; height: 279px; margin: 5px; float: left;" /></p>]]></description><category><![CDATA[Transportation,Police,banner]]></category>
            <pubDate>Mon, 10 Dec 2018 10:25:13 -0700</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_glenmoretrailcrossing-327275.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/uploads/1485/500_glenmoretrailcrossing-327275.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/glenmoretrailcrossing-327275.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[glenmore trail crossing]]></pp:imageTitle></item><item>
                        <title>New 194 Avenue roadway opens in South Calgary</title>
                        <link>https://newsroom.calgary.ca/new-194-avenue-roadway-opens-in-south-calgary/</link>
                        <guid>https://newsroom.calgary.ca/new-194-avenue-roadway-opens-in-south-calgary/</guid><pp:caseid>307376</pp:caseid><description><![CDATA[<p>At an event today on the newly constructed bridge over the Priddis Slough wetland, 194 Avenue between Macleod Trail and Sheriff King Street was officially opened.</p>

<p>&ldquo;Communities to the west of Macleod Trail and 194 Avenue are land-locked from Macleod Trail, separated by the CPR tracks and the Priddis Slough, with primary access only by Sheriff King Street to the north,&rdquo; said Ward 13 Councillor Diane Colley-Urquhart. &ldquo;That&rsquo;s why this connection is so needed. Whether you drive, take transit, cycle or walk, this new road improves how people travel between communities now and into the future.&rdquo;</p>

<p>Connecting the west leg of 194 Avenue also provides access to Silverado and future growth areas in the West Macleod region. This new east-west connection supports an already effective transportation network and will add thousands of new residents and employment opportunities.</p>

<p>&ldquo;I am proud of our government&rsquo;s investment in this project that will provide an important connection for south Calgary and opens up new development opportunities,&rdquo; said Calgary-Shaw MLA Graham Sucha. &ldquo;Building strong, sustainable infrastructure like this in Calgary is all part of creating an economy built to last.&rdquo;</p>

<p>This project is one of 29 major transportation construction projects The City has been working on in 2018 that will have a positive impact to Calgary&rsquo;s infrastructure network.</p>

<p>The project includes:</p>

<ul>
<li>A four-lane divided roadway with multi-use pathways on both sides between Macleod Trail and Sheriff King Street</li>
<li>A bridge structure over the CPR tracks and future LRT tracks</li>
<li>A pedestrian underpass for walkers and cyclists</li>
<li>Some modifications to the intersections at Macleod Trail and at Sheriff King Street.</li>
</ul>

<p>Preserving the natural environment was also a key to this project. The City took great strides in sustaining Priddis Slough, a large and bio-diverse wetland, along with consideration of wildlife and wetland habitat in the area. The new bridge structure acts as a wildlife corridor, allowing wildlife to continue their movement through the wetland area.</p>

<p>Final landscaping will take place in the summer of 2019. Budget for this project is $66.7 million.</p>

<p>For more project information, go to <a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/Macleod-Trail-194-Avenue-S.W.-Connection.aspx?redirect=/macleod194ave">calgary.ca/macleod194ave</a>.</p>

<p style="text-align: center;">- 30 -</p>]]></description><category><![CDATA[Transportation,Transportation Planning,South Calgary,banner]]></category>
            <pubDate>Fri, 02 Nov 2018 14:00:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_vidpic-148931.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_vidpic-148931.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/vidpic-148931.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[vidpic]]></pp:imageTitle></item><item>
                        <title>Ready to roll</title>
                        <link>https://newsroom.calgary.ca/ready-to-roll-1/</link>
                        <guid>https://newsroom.calgary.ca/ready-to-roll-1/</guid><pp:caseid>307051</pp:caseid><pp:subtitle>Bike share pilot launches in Calgary</pp:subtitle><description><![CDATA[<h2>CALGARY &ndash; Dockless bikes are set to hit the streets in Calgary, as part of the first pilot project of its kind in Canada.</h2>

<p>On <strong><u>October 29, 2018</u></strong>, The City of Calgary will issue the first of two operating permits for Phase One of the Council approved Dockless Bike Share Pilot to Lime. Calgarians can expect to see shared bike services on streets and pathways starting this week.</p>

<p>Similar to car share technology, the dockless bike share will be GPS-enabled and can be rented using each company&rsquo;s smartphone app. A bicycle can be parked in an acceptable public space, making sure it is not impeding pedestrian traffic. Each operator will have a service area within Calgary, where bicycles will be available&nbsp;to the public.</p>

<p>&ldquo;The City is taking an innovative approach to the traditional bike share model,&rdquo; says Dockless Bike Share Pilot Project Manager Nathan Carswell. &ldquo;We are excited that citizens of Calgary will be given another mobility option that will connect them to the places they live, work and play.&rdquo;</p>

<p>Two applications to operate in Phase One of the pilot were received from Lime and U-bicycle. Both companies meet the operating requirements outlined as part of the permit application. Lime is planning to commence operations in October 2018 while U-bicycle plans to start operations in spring 2019.</p>

<p>For the first phase of the pilot, Lime will have a fleet of 375 electric pedal assist bicycles and will be granted a permit to operate within Calgary&rsquo;s streets and park space. The e-bikes will initially be placed along what are anticipated to be high utilization corridors along Stephen&rsquo;s Avenue, Eau Claire, the river pathway system, along 17<sup>th</sup> avenue south, in Mission, Bridgeland, Kensington and Inglewood. Moving forward, placement will occur as usership dictates.</p>

<p>&ldquo;Lime is very excited to be hitting the pavement in Calgary, the first Canadian city to launch Lime-E dockless electric bikes. We have been energized by working with The City as they move forward on their commitment to reducing barriers for active modes of transportation and are looking forward to helping empower Calgarians with this greener, more efficient, and affordable transportation options,&rdquo; said Scott Harvey, Lime&rsquo;s Operations Manager for Calgary</p>

<p>While The City will provide oversight, the pilot will be fully funded and operated by each bike share company. Costs to The City will be recovered by fees collected from the permitted operators.</p>

<p>&ldquo;Besides being implemented at no cost to the City, bike share will create jobs, promote mobility, and enhance tourism. We&rsquo;ve seen the success of car2go and other &lsquo;disruptive&rsquo; technologies&mdash;bike share is another example of Calgary adopting bold new transportation methods. Our cycling infrastructure is in place and this pilot project will only compliment it,&rdquo;&nbsp;says Councillor Evan Woolley.</p>

<p>Set to run until 2020, the bike share pilot will allow The City to explore new ways of providing flexible, affordable&nbsp;and accessible mobility options. Throughout the process, feedback will be gathered by the operators through customer surveys.</p>

<p>An application process for phase two of the pilot will take place in Spring 2019.</p>

<p>To learn more, visit&nbsp;<a href="http://email.news.calgary.ca/c/eJxNjMkKAyEQRL9mPEqrbXQOHrLNbwSXTpRMFnRA8vfxlkBBwatHJRchGQyMHr6sl5Kc0ShYdjAbndBav0teKlLBUCAz22sUEQJqtrq8be9J7Se5jPTeefTrzdfP6AFCuVPLvhIrToKwAgAFStSKC27VcpBnxBNo0AjHCeFJvf09sOpiploa8ba94n0Yv_ELL9k2_Q">calgary.ca/bikeshare</a>.</p>

<p align="center">-30-</p>

<p>&nbsp;</p>]]></description><category><![CDATA[Transportation]]></category>
            <pubDate>Sun, 28 Oct 2018 13:59:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Collaboration between City and industry sees final section of Metis Trail twinned</title>
                        <link>https://newsroom.calgary.ca/collaboration-between-city-and-industry-sees-final-section-of-metis-trail-twinned/</link>
                        <guid>https://newsroom.calgary.ca/collaboration-between-city-and-industry-sees-final-section-of-metis-trail-twinned/</guid><pp:caseid>306684</pp:caseid><description><![CDATA[<p>CALGARY &mdash; Twinning of the final section of Metis Trail between 80 Avenue N.E. and the future Airport Trail is now complete, thanks to a partnership between The City and developer Genstar.</p>

<p>Several improvements have been implemented as part of this work, including new traffic signals at 88 Avenue N.E., two additional traffic lanes, additional street lighting, expansion of the storm water system and a pathway along Metis Trail.</p>

<p>The twinning of this final 1.6 km stretch of road completes the expansion along the corridor, providing a consistent and streamlined driving experience for users of this busy northeast roadway and provides an additional connection to communities developing adjacent to Metis Trail.</p>

<p>&ldquo;This project was an opportunity to partner with private industry to enhance infrastructure to support existing communities and encourage future development in northeast Calgary,&rdquo; says Councillor George Chahal. &ldquo;These improvements will not only benefit motorists, but also provide safer connections for pedestrians and cyclists.&rdquo;</p>

<p>With separate areas of road work responsibility within the project area, completing the work as one project instead of two allowed for an efficient construction process. This approach also allowed for cost savings, with construction for The City&rsquo;s portion of the project coming in under budget at $3.3M.</p>

<p>&ldquo;Working together allowed us to find cost efficiencies, eliminate potential safety issues with having two separate contractors in a limited area and complete the project more quickly,&rdquo; says Director of Transportation Planning, Ryan Vanderputten. &ldquo;We&rsquo;re very pleased with the results and look forward to future opportunities for this type of collaboration.&rdquo;</p>

<p>To learn more, visit <a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/Metis-Trail-NE-Widening.aspx">calgary.ca</a>.</p>

<p style="text-align: center;">-30-</p>

<p><strong>Media contact:</strong><br />
The City of Calgary<br />
24 hr media line<br />
(403) 828-2954</p>]]></description><category><![CDATA[Transportation,Transportation Planning,banner]]></category>
            <pubDate>Thu, 25 Oct 2018 11:00:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_metistrailgroup.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_metistrailgroup.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/metistrailgroup.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[MetisTrailGroup]]></pp:imageTitle></item><item>
                        <title>Long weekend road closures</title>
                        <link>https://newsroom.calgary.ca/long-weekend-road-closures/</link>
                        <guid>https://newsroom.calgary.ca/long-weekend-road-closures/</guid><pp:caseid>303689</pp:caseid><description><![CDATA[<p><span>Motorists are being advised of the following road/lane closures&nbsp;over the Thanksgiving long weekend, from Friday, Oct. 5 to Tuesday, Oct. 9:</span></p>

<p><strong>Northeast</strong></p>

<p>1 Street N.E. will be closed between 15 Ave. and 13 Ave. N.E. on Friday, Oct. 5 from 7 a.m. to 5 p.m. This closure accommodates saw cutting.</p>

<p>1 Street N.E. and 15 Ave. N.E. will be closed on Tuesday, Oct. 9 at 7 a.m. until Tuesday, Oct. 16 at 7 a.m. This closure accommodates water main replacement.</p>

<p><strong>Northwest</strong></p>

<p>Eastbound Memorial Drive at Crowchild Trail will be closed from 10 p.m. until 5 a.m. on Thursday, Oct. 4 and Friday, Oct. 5.</p>

<p>Memorial Drive N.W. will have reduced lanes in both directions between 9 Street and 10 Street N.W. from Friday, Oct. 5 at 8 p.m. until Tuesday, Oct. 8 at 5 a.m. This closure accommodates construction.</p>

<p>University Drive N.W. will have reduced lanes in both directions between Unwin Road N.W. and 16 Ave N.W. from Friday, Oct. 5 at 8 p.m. until Tuesday, Oct. 8 at 5 a.m. At the same time,&nbsp;the ramp from southbound University Drive NW to Westbound 16 Ave N.W. will be closed.</p>

<p>Northbound Crowchild Trail will have a single lane closure between 5 Avenue N.W. and University Drive N.W. on Saturday, Oct. 6 from 9 a.m. to 5 p.m.</p>

<p>Eastbound Memorial Drive between east of Crowchild Trail and 19 Street N.W. will have a left-hand lane closure on Saturday, Oct. 6 from 7 a.m. to 7 p.m.</p>

<p>Southbound Crowchild Trail will have a mobile lane closure between Kensington Road and Memorial Drive on Saturday Oct. 6 between 10 a.m. and 2 p.m.</p>

<p><strong>Southeast</strong></p>

<p>3 Street S.E. will be closed between 6 Ave. and 9 Ave. S.E. from 6 a.m. to 1 p.m. on Saturday, Oct. 6. This closure accommodates a mobile crane for the Municipal Building.</p>

<p>17 Ave S.E. will have reduced lanes east of 19 Street S.E. starting on Friday, Oct. 5 at 7 p.m. until Tuesday, Oct. 9 at 5 a.m. This closure accommodates construction.</p>

<p>17 Ave S.E. will have reduced lanes between 28 Street and 31 Street S.E. on Saturday, Oct. 6 from 7 a.m. to 9 p.m. This closure accommodates construction.</p>

<p>Confluence Way S.E. will be closed between 6 Ave. and Riverfront Ave. S.W. starting Tuesday, Oct. 9 at 7 a.m. until Monday, Nov. 26 at 5 p.m. This closure accommodates new service tie-in.</p>

<p>9 Ave S.E. will be closed between 8 Street and 11 Street S.E. starting Tuesday, Oct. 9 at 5 a.m. until Friday, Oct. 12 at 5 a.m. This closure accommodates construction.</p>

<p><strong>Southwest</strong></p>

<p>10 Avenue S.W. ramp off of southbound Crowchild Trail will be closed from 10 p.m. to 5 a.m. on Thursday, Oct. 4 and Friday, Oct. 5.</p>

<p>Northbound Crowchild Trail will be reduced to one lane between Bow Trail and Memorial Drive from 5 a.m. to 5 p.m. on Saturday, Oct. 6.</p>

<p>The intersection of 17 Ave. S.W. and 8 Street S.W. will be closed starting at 5 a.m. on Saturday, Oct. 6&nbsp;until Oct. 15. This closure is for work associated to the 17 Avenue S.W. reconstruction project.</p>

<p>The ramp from westbound 6 Ave. S.W. to southbound 14 Street S.W. will be closed nightly between 10 p.m. and 5 a.m. beginning Thursday, Oct.4 until Monday, Oct. 8. This closure accommodates underground utility work.</p>

<p>4 Street S.W. at 7 Ave S.W. will be reduced to a single lane starting Friday, Oct. 5 at 10 p.m. until Sunday, Oct. 6 at 10 p.m. This closure accommodates CTrain rail repair.</p>

<p>12 Street S.W. will be closed between 15 Ave. S.W. and 16 Ave. S.W. beginning at 9 p.m. on Monday, Oct. 8 until 6 a.m. Tuesday, Oct. 9. This closure accommodates underground utility work.</p>

<p>Eastbound Bow Trail will have a single right-hand lane closure on Friday, Oct. 5 from 9 a.m. until 3 p.m.</p>]]></description><category><![CDATA[Transportation,Transportation Infrastructure,banner]]></category>
            <pubDate>Thu, 04 Oct 2018 16:04:03 -0600</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_crowchild.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_crowchild.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/crowchild.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[crowchild]]></pp:imageTitle></item><item>
                        <title>Introducing ELA</title>
                        <link>https://newsroom.calgary.ca/introducing-ela/</link>
                        <guid>https://newsroom.calgary.ca/introducing-ela/</guid><pp:caseid>299764</pp:caseid><pp:subtitle>Autonomous vehicle ready to transport visitors between TELUS Spark and Calgary Zoo</pp:subtitle><description><![CDATA[<p>CALGARY &shy;&mdash; The first autonomous shuttle in Western Canada has arrived in Calgary, providing the public with an opportunity to experience this technology first-hand.</p>

<p>ELA, or &lsquo;Electric Autonomous,&rsquo; is a fully-accessible 12-person vehicle, which will move passengers between the Calgary Zoo and TELUS Spark throughout the month of September.</p>

<p>This initiative is a public-private partnership, sponsored by Alberta-based Pacific Western Transportation (PWT), who will be operating the vehicle. Additional sponsorship&nbsp;has been provided by TELUS and ATCO, as well as a $50,000 grant provided by the Federal Government&rsquo;s Program to Advance Connectivity and Automation in the Transportation System (ACATS).</p>

<p>&ldquo;This is a very exciting initiative for Calgary and all of Canada,&rdquo; says Kent Hehr, MP, Calgary Centre. &ldquo;Autonomous technology is an opportunity to expand accessible transportation options for all Canadians.&rdquo;</p>

<p>Under the Living Lab strategy, The City of Calgary is working with Calgary Economic Development to make public spaces, transportation corridors and land more accessible for the testing of technological innovation. It&rsquo;s an example of how we&rsquo;re working together to make Calgary more business friendly. This pilot will provide an opportunity to test the long-term feasibility of autonomous technology in Calgary, as part of The City&rsquo;s 30-year Transportation Plan.</p>

<p>&ldquo;For the majority of Calgary&rsquo;s existence as a city, vehicles driven by people has been the norm, but we&rsquo;re now potentially on the cusp of a significant change to the way people commute to where they live, work and play,&rdquo; says Michael Thompson, general manager of Transportation. &ldquo;Technologies evolve quickly, and The City of Calgary wants to be in a place where we can understand and take proactive steps to ensure new technology creates a better quality of life for Calgarians. This pilot puts Calgary in that place.&rdquo;</p>

<p>Guided by sensors, including a key piece of high accuracy GPS equipment developed by local firm NovAtel, part of Hexagon&rsquo;s Positioning Intelligence Division, ELA will operate at low speeds of approximately 12 km/hour, on a one-kilometre service road between the two tourist attractions.&ldquo;We are proud to partner with the City of Calgary,&rdquo; says Dan Finley, VP of Business Development at PWT. &ldquo;It&rsquo;s important for governments and industry to work together to learn about this evolving technology.&nbsp;It has the capacity to be a real game changer in the field of transportation.&rdquo;</p>

<p>Throughout the trial, research will be conducted by the faculties of Science and the Schulich School of Engineering at the University of Calgary and passengers will have the opportunity to provide on-site feedback facilitated by the University and Dillon Consulting.</p>

<p>ELA is available to ride free of charge from Sept. 8 - 30. Rides can&nbsp;be booked online via <a href="https://www.ridewithela.ca/">ridewithela.ca</a>. Following the Calgary pilot, ELA moves up to Edmonton for further testing in the Alberta climate.</p>

<p align="center">-30-</p>

<p><strong>Media contacts:</strong><br />
&nbsp;</p>

<p><strong><img alt="" src="//content.presspage.com/uploads/1485/500_canada.jpg?x=1536097400317" style="width: 150px; margin: 5px; float: left; height: 39px;" />Transport Canada, Ottawa</strong><br />
Media Relations<br />
&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; (613) 993-0055<br />
&nbsp;</p>

<p><strong><img alt="" src="//content.presspage.com/uploads/1485/500_calgary.png?x=1536097690984" style="margin: 5px; float: left; height: 75px; width: 150px;" />The City of Calgary</strong><br />
24 hr media line<br />
(403) 828-2954</p>

<p><br />
&nbsp;</p>

<p><strong><img alt="" src="//content.presspage.com/uploads/1485/500_pwt.jpg?x=1536097927853" style="width: 150px; height: 82px; margin: 5px; float: left;" />Pacific Western Transportation</strong><br />
Amaira Hansen<br />
Interim Director, Communications Centre of Excellence<br />
(403) 999-6175<br />
<br />
&nbsp;</p>

<p><strong><img alt="" src="//content.presspage.com/uploads/1485/500_hexagon-pi-cmyk-standard.jpg?x=1536097966890" style="width: 150px; height: 47px; margin: 5px; float: left;" />Hexagon Positioning Intelligence</strong><br />
Jennifer Abrahams<br />
Marketing Manager<br />
&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; (403) 630-0382</p>

<p><br />
<strong><img alt="" src="//content.presspage.com/uploads/1485/500_uofc.jpg?x=1536098229973" style="width: 150px; height: 44px; margin: 5px; float: left;" />University of Calgary</strong><br />
Sean Myers<br />
Media Relations Advisor<br />
&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;(403) 607-7618</p>

<p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;</strong></p>

<p><img alt="" src="//content.presspage.com/uploads/1485/500_telus.jpg?x=1536098256304" style="font-weight: 700; width: 150px; height: 32px; margin: 5px; float: left;" /></p>

<p><strong>&nbsp;&nbsp;TELUS&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;<br />
&nbsp; </strong>Douglas Self<br />
&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Communications Manager, TELUS Social and Media&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;<br />
&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; (403) 616-8741<br />
&nbsp;</p>

<p><strong><img alt="" src="//content.presspage.com/uploads/1485/500_atco.jpg?x=1536098468545" style="width: 150px; height: 50px; margin: 5px; float: left;" />ATCO</strong><br />
Sandra Cuadra<br />
Marketing & Communications Advisor<br />
&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; (780) 385-0019</p>]]></description><category><![CDATA[Transportation,banner]]></category>
            <pubDate>Wed, 05 Sep 2018 09:31:14 -0600</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_img-2672.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_img-2672.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/img-2672.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[IMG_2672]]></pp:imageTitle></item><item>
                        <title>Next phase of 17 Avenue S.W. Reconstruction Project set to begin following the Labour Day weekend</title>
                        <link>https://newsroom.calgary.ca/next-phase-of-17-avenue-sw-reconstruction-project-set-to-begin-following-the-labour-day-weekend/</link>
                        <guid>https://newsroom.calgary.ca/next-phase-of-17-avenue-sw-reconstruction-project-set-to-begin-following-the-labour-day-weekend/</guid><pp:caseid>299278</pp:caseid><description><![CDATA[<p>CALGARY &ndash; After pausing construction during the months of July and August, work on the next phase of the 17 Avenue S.W. Reconstruction Project is set to kick off on Sept. 4.</p>

<p>Starting on Tuesday, there will be a closure in place from College Lane to 8 Street S.W., including the intersection of 7 Street and 17 Avenue S.W. College Lane will remain open throughout this phase.</p>

<p>Following the completion of this work and the re-opening of the intersection near the end of the month, a closure will be in effect at the intersection of 8 Street and 17 Avenue S.W., as well as on 17 Avenue from 8 Street to 9 Street S.W., to facilitate replacing underground utilities and rebuilding the road. The closure of 8 Street S.W. is anticipated to take roughly seven to 10 days.</p>

<p>Weather permitting, construction on 17 Ave. S.W. will continue until mid-November, with the goal of completing all work up to 9 Street S.W. before pausing for the winter season.</p>

<p>For project updates, visit <a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-ave-construction/17th-ave-construction.aspx?redirect=/17ave">calgary.ca/17ave</a>.<br />
&nbsp;</p>

<p><strong>Long weekend road closures: What you need to know</strong></p>

<p>Motorists are being advised of the following road/lane closures for Friday, Aug. 31 - Monday, Sept. 3, 2018:</p>

<p><strong>Southwest closures</strong></p>

<ul>
<li>11 Street S.W. will be closed between 6 Ave. S.W. and 9 Ave. S.W. beginning at 7 p.m. on Friday Aug. 31 until 5 a.m. on Tuesday, Sept. 4. This closure accommodates underground utility work.</li>
<li>11 Street S.W. will have reduced lanes between 8 Ave. S.W. and 9 Ave. S.W. as well as a single left lane closure on 9 Ave. S.W. at 11 Street S.W. beginning at 5 a.m. on Tuesday, Sept. 4 until 8 p.m. on Monday, Sept. 17. These closures accommodate underground utility work.</li>
<li>Heritage Drive will have lanes closed between Macleod Trail and 4A Street S.W. on Saturday, Sept. 1 from 11 a.m. to 6 p.m. and Sunday, Sept. 2 from 7 a.m. to 3 p.m. Two-way traffic set up on opposite side of construction both days. This closure accommodates paving.</li>
<li>Richmond Road S.W. will have lanes closed between 30 Street and 37 Street as well as 37 Street and 51 Street S.W. beginning on Saturday, Sept. 1 until Sunday, Sept. 2 daily from 4 a.m. to 4 p.m. There will be a two-way traffic set up on opposite side of construction. Detour routes to 26 Ave. S.W. to the north and Sarcee Road to the south will be posted via signage. This closure accommodates paving.</li>
<li>Eastbound 8 Avenue S.W. will be closed between 8 Street S.W. and 9 Street S.W. nightly from 9 p.m. to 5 a.m. until Wednesday, Sept. 5. This closure accommodates underground utility work.</li>
</ul>

<ul>
<li>Anderson Road will be reduced by one lane in both directions, west of 24 Street S.W. from 8 a.m. to 3:30 p.m. (daily) until Saturday, Sept. 1 for road construction related to Anderson Road widening and upgrades.</li>
</ul>

<p><strong>14 Street S.W. Transitway Project closures</strong></p>

<ul>
<li>The right lane on eastbound Southland Drive will be closed at 14 Street S.W. from 9 a.m. to 3 p.m. on Friday, Aug. 31, plus 7 a.m. to 7 p.m. on Saturday, Sept. 1 and Sunday, Sept. 2</li>
<li>The right lane on westbound Southland Drive will be closed east of 14 Street S.W. from 9 a.m. to 3 p.m. on Friday, Aug. 31, plus 7 a.m. to 7 p.m. on Saturday, Sept. 1 and Sunday, Sept. 2</li>
<li>The left lane on eastbound Southland Drive will be closed west of Bradbury Drive S.W. from 9 a.m. to 3 p.m. on Friday, Aug. 31, plus 7 a.m. to 7 p.m. on Saturday, Sept. 1 and Sunday, Sept. 2</li>
<li>The left lane on westbound Southland Drive will be closed west of Bradbury Drive S.W. from 9 a.m. to 3 p.m. on Friday, Aug. 31, plus 7 a.m. to 7 p.m. on Saturday, Sept. 1 and Sunday, Sept. 2</li>
<li>The right lane on southbound 14 Street S.W. will be closed between 90 Avenue S.W. and Southland Drive from 8:30 a.m. to 3 p.m. on Friday, Aug. 31, plus 7 a.m. to 7 p.m. on Saturday, Sept. 1 and Sunday, Sept. 2</li>
<li>The right lane on northbound 14 Street S.W. will be closed at Southland Drive from 9:15 a.m. to 4 p.m. on Friday, Aug. 31, plus 7 a.m. to 7 p.m. on Saturday, Sept. 1 and Sunday, Sept. 2</li>
</ul>

<p><strong>Southeast closures</strong></p>

<ul>
<li>Barlow Trail S.E. will be closed between 26 Street and 27 Street S.E. starting Friday, Aug. 31 at 7 p.m. until Tuesday, Sept. 4 at 5 a.m. This closure accommodates construction.</li>
</ul>

<ul>
<li>17 Ave. S.E. and 19 Street S.E. will be closed beginning Friday, Aug. 31 at 7 p.m. until Tuesday, Sept. 4 at 5 a.m. This closure accommodates construction.</li>
</ul>

<ul>
<li>17 Ave. S.E. will be closed between 47 Street and 48 Street S.E. starting Friday, Aug. 31 at 7 p.m. until Sunday, Sept. 2 at noon. This closure accommodates construction.</li>
</ul>

<ul>
<li>90 Ave. S.E. will have reduced lanes between 40 Street and 44 Street S.E. starting Saturday, Sept. 1 at 7 a.m. until Sunday, Sept. 2 at 7 p.m. This closure accommodates construction.</li>
</ul>

<ul>
<li>Confluence Way S.E. will be closed between 6 Ave. S.E. and 5 Street S.E. from 7 a.m. to 4 p.m. on Friday, Aug. 31. This closure accommodates construction.</li>
<li>The lower deck of the Centre Street Bridge will be closed between Riverfront Avenue S.E. and Memorial Drive N.E. beginning at 9 a.m. Friday, Aug. 24 until 7 p.m. Tuesday, Sept. 11. This closure accommodates bridge work. Please use an alternate route.</li>
</ul>

<p><strong>Special Event Road Closures</strong></p>

<p><strong>Shaw Charity Classic Golf Tournament &ndash; Friday, Aug. 31 to Sunday, Sept. 2</strong></p>

<p>The following roads will be closed from 5 a.m. to 8 p.m. daily:</p>

<ul>
<li>14 Street S.W. from Anderson Road to the intersection of Canyon Meadows Drive and Elbow Drive.</li>
<li>Residential access will be maintained but parking will be restricted in residential areas.</li>
</ul>

<p>Please note: There is no public parking on the event site and visitors are advised to use public transit.</p>

<p><strong>Calgary Pride Festival &ndash; Sunday, Sept. 2</strong></p>

<ul>
<li>The following roads will be closed between 6 a.m. and 3 p.m.:
<ul>
<li>Riverfront Avenue S.E. from Centre Street S to Confluence Way S.E.</li>
<li>Macleod Trail S.E. from 4 Avenue S.E. to Riverfront Avenue S.E.</li>
<li>1 Street S.E. from 3 Avenue S.E. to Riverfront Avenue S.E.</li>
<li>3 Street S.E. from 4 Avenue S.E. to Riverfront Avenue S.E.</li>
<li>4 Street S.E. from 7 Avenue S.E. to Riverfront Avenue S.E.</li>
<li>6 Avenue S.E. from 5 Street S.E. to 3 Street S.E.</li>
<li>The Reconciliation Bridge from Memorial Drive N.E. to Riverfront Avenue S.E.</li>
</ul>
</li>
<li>The following roads will be closed between 10:30 a.m. and 3 p.m.:
<ul>
<li>Macleod Trail S.E. from 9 Avenue S.E. to 6 Avenue S.E</li>
<li>1 Street S.E. from 5 Avenue S.E. to 6 Avenue S.E.</li>
<li>Centre Street S from 4 Avenue S to 9 Avenue S</li>
<li>1 Street S.W. from 5 Avenue S.W. to 9 Avenue S.W.</li>
<li>2 Street S.W. from 5 Avenue S.W. to 9 Avenue S.W.</li>
<li>3 Street S.W. from 5 Avenue S.W. to 8 Avenue S.W.</li>
<li>4 Street S.W. from 6 Avenue S.W. to 8 Avenue S.W.</li>
<li>5 Street S.W. from 5 Avenue S.W. to 8 Avenue S.W.</li>
<li>6 Street S.W. from 8 Avenue S.W. to Eau Claire Avenue S.W.</li>
<li>6 Avenue S.E. / S.W. from 3 Street S.E. to 6 Street S.W.</li>
</ul>
</li>
<li>The following roads will be closed between 11:30 a.m. and 3 p.m.:
<ul>
<li>5 Street S.W. from Eau Claire Avenue S.W. to 2 Avenue S.W.</li>
<li>Eau Claire Avenue S.W. from 5 Street S.W. to 6 Street S.W.</li>
<li>2 Avenue S.W. from 4 Street S.W. to 7 Street S.W.</li>
<li>3 Avenue S.W. from 4 Street S.W. to 7 Street S.W.</li>
<li>4 Avenue S.W. from 5 Street S.W. to 6 Street S.W.</li>
<li>5 Avenue S.W. from 7 Street S.W. to 5 Street S.W.</li>
</ul>
</li>
</ul>

<p>Please note: Police will be in the area directing traffic and motorists are advised to watch for pedestrians.</p>

<p><strong>Additional Road closure information</strong></p>

<p>Follow The City of Calgary&rsquo;s Transportation Department on Twitter for up to date information on road closures, projects and all of Transportation's&nbsp;services at <a href="http://email.news.calgary.ca/c/eJxFissKwyAUBb8mLuX61oWLUOhvFHujjTQvVJD8fd0VDgzMnMUjLEa-SdxD3l558Vo5RVbvQlRJagtSsyRViimCw8CRC64QBNn82to1iXniz7HeO209txYLxXMf5r6xlXDU6yyNZM-BWbDAmeZaCMqoMVpoNzPDmJ3hAZOEI_ZKMWyfUO5BUjyuseQaaW0nfsfjH39XdTj2">@yyctransport</a>.</p>

<p>Visit <a href="http://email.news.calgary.ca/c/eJxFjMsKwyAQRb8mLmXGia-Fi1DobxQdTSNNk2KE0r9vdoG7OZzDzYEh2zGJ8o51fdQcjPZaLCGzAV90KkpTxEKUEuBIDjwnT6TFGpbePwNNg7qf47g-Y_tJjif0Fue5ct3mXdSgAB04UGiUIZIorTVk_IQW0U1wg2GErXwPeX2IFngprR5FHn3n11lc8g-AQzXF">calgary.ca/trafficinfo</a> for up-to-date road closure and incident information. Details on active and planned southwest construction projects are available at <a href="http://www.calgary.ca/Transportation/TI/Pages/Transit-projects/SWBRT/Southwest-projects.aspx">calgary.ca/transportation</a>.</p>

<p align="center">-30-</p>

<p><strong>Media Contact:</strong></p>

<p>24 hr media line</p>

<p>The City of Calgary</p>

<p>(403) 828-2954</p>]]></description><category><![CDATA[Transportation]]></category>
            <pubDate>Fri, 31 Aug 2018 09:45:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Motorists advised of significant traffic impacts this long-weekend on Calgary roads</title>
                        <link>https://newsroom.calgary.ca/motorists-advised-of-significant-traffic-impacts-this-long-weekend/</link>
                        <guid>https://newsroom.calgary.ca/motorists-advised-of-significant-traffic-impacts-this-long-weekend/</guid><pp:caseid>296828</pp:caseid><description><![CDATA[<p>Motorists are being advised of the following road/lane closures for Friday, Aug. 3 - Monday, Aug. 6, 2018:</p>

<p><strong>Southwest closures</strong></p>

<p>Westbound 8 Avenue S.W. will be closed at 5 Street S.W. beginning on Friday, August 3 at 7 p.m. until Saturday, August 4 at 5 a.m. This closure accommodates underground utility work.</p>

<p>8 Street S.W. will be closed between 8 Avenue and 10 Avenue S.W. starting Friday, August 3 at 7 p.m. until Tuesday, August 7 at 5 a.m. This closure accommodates underground utility work.</p>

<p>14 Street S.W. at Anderson Road will be closed to north / south through-traffic and all left turns will be restricted from 8 p.m. Friday, August 3 until 5 a.m. Tuesday, August 7.&nbsp;In addition, all eastbound through-traffic on Anderson Road will be put into the left turn bay to continue east.&nbsp;A flagger will be on site in an effort to keep traffic moving eastbound through the intersection.&nbsp;Traffic will be directed to Elbow Drive to bypass the closure.&nbsp;This work is required for the upgrade and development of the Anderson Road project.</p>

<p>Eastbound Glenmore Trail will have lanes closed west of Crowchild Trail S.W. and on the ramp from southbound Crowchild Trail to eastbound Glenmore Trail S.W. on Saturday, August 4 from 4 a.m. to 9 a.m. This closure accommodates construction.</p>

<p>Eastbound and Westbound Glenmore Trail between 37 Street S.W. and Crowchild Trail will have single lane closures between 9 a.m. to 3 p.m. from Thursday, August 2 until Friday, August 3; and from 7 a.m. to 7 p.m. on Saturday, August 4 and Monday, August 6. This closure accommodates construction.</p>

<p>Northbound Centre Street S will be closed from Saturday, August 4 at 5 a.m. until Sunday, August 5 at 7 p.m. Two-way traffic will be set up in the southbound lanes. This closure accommodates paving.</p>

<p>Westbound Southland Drive will have a single lane closure between 19 Street S.W. & Palliser Drive S.W. on both Thursday, August 2 and Friday, August 3, all day and all night. This closure accommodates paving.</p>

<p>Westbound Southland Drive will be reduced to one lane just east and just west of 14 Street S.W. to Bradbury Drive. Eastbound Southland Drive will also be reduced to one lane from Bradbury Drive to 14 Street S.W. This will be in effect from 9 a.m. to 3 p.m. on Thursday, August 2, Friday and&nbsp;August 3 and between 7 a.m. and 7 p.m. on Saturday, August 4. This closure accommodates construction.</p>

<p>Southbound 14 Street S.W. will be reduced to one lane, north and south of Southland Drive, between 9 a.m. and 3 p.m. on Thursday, August 2 and Friday, August 3. This closure accommodates construction.</p>

<p>Northbound 14 Street S.W. will be reduced to one lane, north and south of Southland Drive, between 7 a.m. and 7 p.m. on Saturday, August 4. This closure accommodates construction.</p>

<p>Northbound 14 Street S.W. between 90 Avenue and Southland Drive will be reduced to one lane between 9 a.m. and 3 p.m. on Thursday, August 2 and Friday, August 3 and between 7 a.m. and 7 p.m. on Saturday, August 4. This closure accommodates construction.</p>

<p><strong>Southeast closures</strong></p>

<p>1 Street S.E. will have lanes closed at 6 Avenue S.E. starting Friday, August 3 at 8 p.m. until Tuesday, August 7 at 5 a.m. This closure accommodates construction.17 Avenue and 28 Street S.E. will experience full road closures and lanes closures starting Friday, August 3 at 7 p.m. until Tuesday, August 7 at 5 a.m. These closures accommodate construction.</p>

<p><strong>Northwest closures</strong></p>

<p>Southbound Crowchild Trail N.W. will have lanes closed at the Brentwood Station beginning Friday, August 3 at 8 p.m. until Tuesday, August 7 at 5 a.m. This closure accommodates maintenance work by Calgary Transit.</p>

<p><strong>Northeast closures</strong></p>

<p>26 Avenue N.E. will have lanes closed with a two-way traffic set-up between 32 and 36 Street N.E. on Saturday, August 4 from 5 a.m. to 6 p.m. These lane closures accommodate paving.</p>

<p>Traffic pattern change on Metis Trail at 80 Avenue N.E. starting Sunday, August 5 until early fall of 2018. This closure accommodates construction.</p>

<p><strong>Special Event Road Closures</strong></p>

<p><strong>Chasing Summer - Saturday, Aug. 4 to Monday, Aug. 6 daily from 11 a.m. to 1 a.m.</strong></p>

<ul>
<li>Barlow Trail will be closed between Memorial Drive S.E. and 17 Avenue S.E. between 11 a.m. and 1 a.m. daily</li>
<li>The right lane of the exit ramp from eastbound Memorial Drive S.E. to Barlow Trail S.E. will be closed between 11 a.m. and 8 p.m. daily to accommodate a taxi zone.</li>
<li>The exit ramp will be completely closed to all traffic except taxis between 8 p.m. and 1 a.m. daily</li>
<li>Speeds on westbound Memorial Drive S.E. will be restricted to 60 km/h during the event</li>
</ul>

<p>Motorists are advised to watch for Police directing traffic in the area</p>

<p><strong>Inglewood Sunfest &ndash; Saturday, August 4 from 6 a.m. to 8 p.m.</strong></p>

<ul>
<li>9 Avenue S.E. will be closed from 11 Street S.E. to 14 Street S.E.</li>
<li>12 Street S.E. and 13 Street S.E. will be closed north and south of 9 Avenue S.E. with local traffic only</li>
<li>There will be restricted parking on 8 Avenue S.E. between 11 Street S.E. and 14 Street S.E.</li>
<li>11 Street S.E., 12 Street S.E., 13 Street S.E. and 14 Street S.E. will have restricted parking between 8 Avenue S.E. and 10 Avenue S.E.</li>
</ul>

<p>Marshals and Police will be directing traffic in the area. Motorists are advised to drive with caution, watch for cyclists and pedestrians and avoid the area by use alternate routes.</p>

<p><strong>Tour De Bowness Hill Climb &ndash; Sunday, August 5 from 8 a.m. to 2 p.m.</strong></p>

<ul>
<li>Parking restrictions will be in place on Mackay Road N.W. from Montalban Crescent N.W. to 42 Street N.W.</li>
<li>Mackay Road N.W. will be reduced to single lanes northbound and southbound to accommodate climbers.</li>
</ul>

<p>Motorists are advised to drive with caution, watch for pedestrians and avoid the area by use alternate routes.</p>

<p><strong>Bow Cycle Tour de Bowness and Street Festival &ndash; Monday, August 6 from 5 a.m. to 5 p.m.</strong></p>

<ul>
<li>Bowness Road N.W. will be closed between 62 Street N.W. and 66 Avenue N.W.</li>
<li>Bowwood Drive N.W. will be closed between 63 Street N.W. and 66 Avenue N.W.</li>
<li>36 Avenue N.W. will be closed at Bow Anne Road N.W.</li>
<li>63 Avenue N.W. will be closed between Bowness Road N.W. and Bow Crescent N.W.</li>
<li>64 Street N.W. will be closed between Bowness Road N.W. and Bow Crescent N.W.</li>
<li>65 Street N.W. will be closed between Bowness Road N.W. and Bow Crescent N.W.</li>
<li>A vehicle detour will be indicated via signage along Bow Crescent N.W.</li>
<li>Restricted parking will be in place along Bowwood Drive N.W., Bowness Road N.W. and Bow Crescent N.W. and the corresponding Streets.</li>
</ul>

<p>There will be marshals and police present to direct traffic. Motorists are advised to drive with caution, watch for cyclists and pedestrians and avoid the area by using&nbsp;alternate routes.</p>

<p><strong>Additional Road closure information</strong></p>

<p>Follow The City of Calgary&rsquo;s Transportation Department on Twitter for up to date information on road closures, projects and all of Transportation's&nbsp;services at&nbsp;<a href="http://www.twitter.com/yyctransport">@yyctransport</a>.</p>

<p>Visit&nbsp;<a href="http://calgary.ca/trafficinfo">Calgary.ca/trafficinfo</a>&nbsp;for up-to-date road closure and incident information.</p>]]></description><category><![CDATA[Transportation]]></category>
            <pubDate>Thu, 02 Aug 2018 15:00:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Construction set to begin on the widening of Glenmore Trail S.W.</title>
                        <link>https://newsroom.calgary.ca/construction-set-to-begin-on-the-widening-of-glenmore-trail-sw/</link>
                        <guid>https://newsroom.calgary.ca/construction-set-to-begin-on-the-widening-of-glenmore-trail-sw/</guid><pp:caseid>295577</pp:caseid><description><![CDATA[<p>Construction is set to begin on the widening of Glenmore Trail S.W. between 37 Street and Crowchild Trail S.W. This section of Glenmore Trail will be widened from four to six lanes, as well as rebuilding the roadway.</p>

<p>Also included in this project are upgrades to the Glenmore Trail/Crowchild Trail interchange and a new pedestrian bridge over Crowchild Trail at 54 Avenue S.W.</p>

<p>&ldquo;This project is one of several City-led projects to connect Calgary's road network to the ring road and will accommodate changes to traffic volume and patterns that are expected after the opening of the Southwest Ring Road,&rdquo; said Julie Radke, Manager of the City&rsquo;s Ring Road Integration program. &ldquo;Because these projects are located within the city right of way, the City of Calgary is responsible for the design and construction of connecting Calgary's road network to the ring road.&rdquo;</p>

<p><img alt="" src="//content.presspage.com/uploads/1485/500_glenmorewidening.jpg?x=1532029245537" style="width: 700px; height: 354px; margin: 5px; float: left;" /></p>

<p>&ldquo;We are putting into place some measures to ensure citizens can still get to where they want to go,&rdquo; said Project Manager Syed Ali. &ldquo;As the project moves forward, we are coordinating detours and lane closures with other projects in the area, staging as much work as we can during off-peak commute times to minimize impacts over the rush hour, and will make a temporary roadway alignment on Glenmore Trail in order to keep two traffic lanes open in each direction.&rdquo;</p>

<p>Crews will remove and pave over the existing median before detouring the traffic to the south side of the road. This will allow for construction on the north side before traffic can be switched over to allow for construction on the remaining section.</p>

<p>The project team is working closely with Alberta Transportation who are responsible for building the Southwest Ring Road, including the reconstruction of Glenmore Trail from Sarcee Trail and connecting with the work the City is doing.</p>

<p>The upgrades to the Glenmore Trail/Crowchild Trail S.W. interchange will modify the current interchange to accommodate changes to traffic volume and patterns that are expected after the opening of the ring road.</p>

<p>The new pedestrian bridge over Crowchild Trail at 54 Avenue S.W. is designed to be more accessible and convenient, and will result in a better experience for the user. The existing bridge near 55 Avenue will remain open and will be removed once the new bridge is complete and opened.</p>

<p>Access to nearby businesses will be maintained throughout the construction period.</p>

<p>This project is one of 29 major transportation construction projects the City is working on in 2018 that will have a positive impact to Calgary&rsquo;s infrastructure network. Construction is expected to last until the fall of 2019.</p>

<p>The budget for this project is $35 million.</p>

<p>For more details, go to <a href="http://www.calgary.ca/glenmore-swrr">calgary.ca/glenmore-swrr.</a></p>

<p style="text-align: center;">- 30 -</p>]]></description><category><![CDATA[city news,Transportation]]></category>
            <pubDate>Thu, 19 Jul 2018 15:30:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>One-way traffic extended on 14th and 15th Avenue S.W. </title>
                        <link>https://newsroom.calgary.ca/one-way-traffic-extended-on-14th-and-15th-avenue-sw/</link>
                        <guid>https://newsroom.calgary.ca/one-way-traffic-extended-on-14th-and-15th-avenue-sw/</guid><pp:caseid>295146</pp:caseid><description><![CDATA[<p>CALGARY &shy;&mdash; To prepare for the next phase of construction as part of The City&rsquo;s 17<sup>th</sup> Avenue S.W. Reconstruction Project, temporary traffic pattern changes are being introduced to a new portion of both 14<sup>th</sup> and 15<sup>th</sup> Avenue.</p>

<p>Starting on Wednesday, July 18, 14<sup>th</sup> & 15<sup>th</sup> Avenue between 8<sup>th</sup> and 11<sup>th</sup> Street SW will become one-way streets, with 14<sup>th</sup> Avenue accommodating westbound traffic and 15<sup>th</sup> Avenue eastbound.</p>

<p>&ldquo;Although construction on 17<sup>th</sup> Avenue has been paused until September, introducing these changes now will allow Calgarians to become accustomed to the new flow of traffic in the area,&rdquo; says Duane Delaney, Manager of Major Road Projects with The City. &ldquo;These changes will not only increase traffic calming with the addition of new signalized intersections and stop signs, but will also help to maintain the east-west connection and allow traffic to continue operating during construction.&rdquo;</p>

<p>To facilitate the setup of the one-way traffic pattern, temporary no-parking signs will be set up on July 17, 24 hours before work begins, and will remain in place until the one-ways have been completed. Vehicles remaining on the roadways when work begins will be ticketed and towed at the owner&rsquo;s expense. Once the set-up work is complete, both 14<sup>th</sup> and 15<sup>th</sup> Avenues will offer parking on both sides of the street, in addition to an on-street bike lane.</p>

<p>View the <a href="https://newsroom.calgary.ca/download/568773/onewayextensionmap.pdf">attached map</a> for one-way extension&nbsp;details. To learn more about the 17<sup>th</sup> Avenue S.W. Reconstruction Project, visit <a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-ave-construction/17th-ave-construction.aspx?redirect=/17ave">calgary.ca/17Ave.</a></p>

<p style="text-align: center;"><br />
-30-</p>

<p><strong>Media Contact:</strong><br />
24 hr media line - The City of Calgary<br />
(403) 828-2954</p>]]></description><category><![CDATA[Transportation,Transportation Infrastructure]]></category>
            <pubDate>Mon, 16 Jul 2018 03:00:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Construction set to begin on Bow Trail S.W. widening and intersection improvements</title>
                        <link>https://newsroom.calgary.ca/construction-set-to-begin-on-bow-trail-sw-widening-and-intersection-improvements/</link>
                        <guid>https://newsroom.calgary.ca/construction-set-to-begin-on-bow-trail-sw-widening-and-intersection-improvements/</guid><pp:caseid>288879</pp:caseid><description><![CDATA[<p>Construction is set to begin on the widening of Bow Trail S.W. and intersection improvements at Old Banff Coach Road and 85 Street S.W.</p>

<p>&ldquo;These upgrades improve how people travel in the area and between communities now and into the future, whether you drive, take transit, cycle or walk,&rdquo; said Ward 6 Councillor Jeff Davison. &ldquo;I believe travel in this area will be safer because of these improvements which include crosswalks in all directions connecting to sidewalks at the Bow Trail and 85 Street S.W. intersection, and a signalized pedestrian crossing on Bow Trail, east of 85 Street.&rdquo;</p>

<p>&ldquo;The Government of Alberta is proud to provide funding for this project because it will improve safety, provide development opportunities and continue to demonstrate our commitment to purposefully invest in the Calgary region,&rdquo; said Calgary-Bow MLA Debra Drever. &ldquo;Working closely with The City of Calgary, we have established priorities that will ensure a transportation network that is prepared to service Albertans for generations to come.&rdquo;</p>

<p>This project is one of 29 major transportation construction projects The City is working on in 2018 that will have a positive impact to Calgary&rsquo;s infrastructure network.</p>

<p>The project includes:</p>

<ul>
<li>Adding an eastbound and westbound lane between Old Banff Coach Road (OBCR) and 85th Street S.W., for now and future vehicle volumes</li>
<li>Extending pathways on the north and south side of Bow Trail to OBCR and Strathcona Blvd. for better walking and cycling connections between communities and existing pathways</li>
<li>Reducing speed limit to 60km/hr on Bow Trail, providing a safer space to travel in the area</li>
<li>Installation of a pedestrian signal crossing at 77 Street S.W. (approx. 800m, east of 85 Street), to improve community connections.</li>
</ul>

<p>At the Bow Trail and 85 Street S.W. intersection, dual left-turn lanes in all four&nbsp;directions will be added, as well as two through lanes in all directions. At the intersection of Bow Trail, OBCR and Strathcona Blvd., a third left-turn lane will be added from southbound OBCR to eastbound Bow Trail and the two left turn lanes from westbound Bow Trail to southbound Strathcona Blvd. will be lengthened.</p>

<p>Construction will begin in early July and is expected to last until the fall of 2019.</p>

<p>The City has put measures into place to ensure citizens can still get where they need to go, including the coordination of projects and detours, staged work during off-peak commute times to minimize impacts over the rush hour, and where possible, geometric changes to the roadway and temporary alignment changes in order to keep traffic lanes open. For this project, it&rsquo;s anticipated that there will be minimal impact to traffic as the new lanes are being constructed north of the existing Bow Trail.</p>

<p>The budget for this project is $20 million.</p>

<p>For more details, visit <a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/Bow-Trail-Widening-and-Intersection-Improvements.aspx?redirect=/bowtrail-swrr">calgary.ca/bowtrail-swrr</a>.</p>

<p style="text-align: center;">&nbsp;- 30 -</p>]]></description><category><![CDATA[Transportation,Transportation Infrastructure]]></category>
            <pubDate>Wed, 27 Jun 2018 11:00:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Motorists advised of significant traffic impacts this weekend on Calgary roads</title>
                        <link>https://newsroom.calgary.ca/motorists-advised-of-significant-traffic-impacts-this-weekend-on-calgary-roads/</link>
                        <guid>https://newsroom.calgary.ca/motorists-advised-of-significant-traffic-impacts-this-weekend-on-calgary-roads/</guid><pp:caseid>288386</pp:caseid><description><![CDATA[Motorists are being advised of the following road/lane closures for Friday, June 22- Monday, June 25, 2018:

<p><span style="color:#FF0000;"><strong>Crowchild Trail /Memorial Drive</strong></span></p>

<p>As part of the <a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/crowchild-trail-upgrades/Crowchild-Trail-Upgrade.aspx">Crowchild Trail Upgrades</a> project, The City will be doing a concrete pour starting at 9 p.m. on Friday, June 22. The following closures and lane restrictions are required over the weekend and into next week:</p>

<ul>
<li>Double right-hand lane closures in each direction along Crowchild Trail between Bow Trail and Memorial Drive (Fri. at 9 p.m. &ndash; Sat. at 9 a.m.)</li>
<li>Single right-hand lane closure on both northbound and southbound Crowchild Trail between Bow Trail and Memorial Drive (Sat. at 9 a.m. &ndash; Tues. at 5 a.m.)</li>
<li>Closure of the following ramps:</li>
</ul>

<ul>
<li>Southbound Crowchild Trail to eastbound Memorial Drive (Fri. at 9 p.m. &ndash; Sat. at 5 a.m.)</li>
<li>Eastbound Memorial Drive (Parkdale Blvd) to southbound Crowchild Trail (Fri. at 9 p.m. &ndash; Tues. at 5 a.m.)</li>
<li>Northbound Crowchild Trail to eastbound Memorial Drive (Fri. at 9 p.m. &ndash; Tues. at 5 a.m.)</li>
</ul>

<p>Please note: Because some of these closures are expected to remain in place until 5 a.m. on Tuesday, June 26, motorists are advised to avoid the area if possible and plan alternate routes &ndash; especially during Monday&rsquo;s morning and evening commutes.</p>

<p><span style="color:#FF0000;"><strong>Southwest closures</strong></span></p>

<p><strong>Glenmore Trail S.W. & Crowchild Trail S.W. flyover</strong></p>

<p>The flyover from southbound Crowchild Trail S.W. to eastbound Glenmore Trail will be closed overnight Friday and Saturday, 11 p.m. to 7 a.m. nightly, so crews can complete a s​tormwater connection and concrete work within the median.</p>

<p>Vehicle traffic will continue on southbound Crowchild Trail S.W. and perform a U-turn between two medians. The U-turn detour will be signed, and a flagger will be present to direct traffic onto the northbound Crowchild Trail exit ramp for access onto eastbound Glenmore Trail S.W.</p>

<p>Truck and bus traffic will be detoured onto westbound Glenmore Trail and utilize the 37 Street S.W. roundabout to access eastbound Glenmore Trail S.W.</p>

<p><strong>90 Avenue S.W.</strong></p>

<p>The left-hand lane on westbound 90 Avenue will be closed at 14 Street S.W. from June 22 to July 4 for ATCO to decommission some existing pipes. Because this work involves excavation in the closed lane, 90 Avenue will be reduced to one lane for westbound traffic for the duration of the construction. Signage will be placed to encourage drivers to use Southland Drive and 24 Street S.W. as an alternate route.</p>

<p><strong>14 Street S.W.</strong></p>

<p>Southbound 14 Street S.W. will have lane reductions between 90 Avenue and Southland Drive S.W. on Friday, June 22 from 8:30 a.m. to 3 p.m. This closure accommodates construction and pump truck.</p>

<p><strong>9 Avenue S.W.</strong></p>

<p>9 Avenue S.W. over top of 14 Street S.W. will be reduced to a single lane beginning on Friday, June 22 at 6 p.m. until Sunday, June 24 at 9 p.m. This closure accommodates underground utility work.</p>

<p><span style="color:#FF0000;"><strong>Southeast closures</strong></span></p>

<p><strong>5 Avenue S.E.</strong></p>

<p>5 Avenue S.E. will be closed between 3 Street and 4 Street S.E. starting at 7 a.m. Monday, June 25 until 7 p.m. Monday, August 24. This closure accommodates Enmax service tie-in for BOSA development. Access will be maintained during Calgary Stampede July 5-15.</p>

<p><strong>3 Street S.E.</strong></p>

<p>3 Street S.E. will be closed between 9 Avenue and 6 Avenue on Friday, June 22, between 5 a.m. and 6 a.m. to accommodate the New Central Library construction. Access to Lot 47 will be available at all times from 9 Avenue SE.</p>

<p><strong>11 Street S.E.</strong></p>

<p>11 Street S.E. will be closed between 34 Avenue and 42 Avenue S.E. on Saturday, June 23 from 6 a.m. to 8 p.m. This closure accommodates the 17 Avenue S.E. BRT.</p>

<p><strong>52 Street S.E. & 17 Avenue S.E.</strong></p>

<p>52 Street S.E. will be closed between 16 Avenue and 17 Avenue S.E. starting at 7 p.m. Friday until Tuesday at 5 a.m. for the 17 Avenue BRT construction. During this time, 17 Avenue S.E. will be reduced to one lane in each direction at 52 Street. No turns will be permitted and major delays are expected. Motorists are advised to plan alternate routes.Northwest closures</p>

<p><strong>37 Street N.W.</strong></p>

<p>37 Street N.W. will be closed between 32 Avenue N.W. and 40 Avenue N.W. for deep utilities work on Saturday, Jun 23 from 7 a.m. to 11 p.m. Detour routes will be indicated with signs.</p>

<p><strong>Bowness Road N.W.</strong></p>

<p>Bowness Road will be closed between 47 Street and 48 Street N.W. starting Friday, June 22 at 7 p.m. until Monday, June 25 at 5 a.m. This closure accommodates utility work.</p>

<p><strong>14 Street N.W.</strong></p>

<p>Reduced lanes on 14 Street and Memorial Drive N.W. starting Friday, June 22 at 9 p.m. until Monday, June 25 at 5 a.m. This closure accommodates construction.</p>

<p><span style="color:#FF0000;"><strong>Northeast closures</strong></span></p>

<p><strong>Barlow Trail N.E.</strong></p>

<p>Northbound Barlow Trail will be closed at 100 Avenue N.E. on Saturday, June 23 from 8 a.m. to 6 p.m. This closure accommodates asphalt rehab.</p>

<p><span style="color:#FF0000;"><strong>Special Event Road Closures</strong></span></p>

<p>Please be advised of the following special event road and lane closures:</p>

<p><strong>Calgary Track Takeover</strong></p>

<p>The following closures will be in place from 7 p.m. on Friday to 11:59 p.m. on Saturday:</p>

<ul>
<li>Macleod Trail S.E. will be closed between 9 Avenue S.E. and 7 Avenue S.E.</li>
<li>8 Avenue S.E. will be closed between Macleod Trail S.E. and 1 Street S.E.</li>
<li>Watch for police directing traffic in the area</li>
</ul>

<p><strong>Color Me Rad</strong></p>

<p>The following road closures will be in place on Saturday from 8 a.m. to 1 p.m.:</p>

<ul>
<li>10 Street N.W. will be closed between 5 Avenue N.W. and 16 Avenue N.W.</li>
<li>13 Avenue N.W. will be closed between Crescent Road N.W. and 10 Street N.W.</li>
</ul>

<p>Watch for police directing traffic in the area</p>

<p><strong>Sled Island Block Party</strong></p>

<p>The following road closures will be in place on Saturday from noon to midnight:</p>

<ul>
<li>10 Street S.E. will be closed between 9 Avenue S.E. and 10 Avenue S.E.</li>
<li>10 Avenue S.E. will be closed between 10 Street S.E. and 11 Street S.E.</li>
</ul>

<p><strong>Wild Rose Women&rsquo;s Triathlon</strong></p>

<p>The following road closures will be in place on Sunday from 8 a.m. to noon:</p>

<ul>
<li>The right lane westbound on 24 Avenue N.W. will be closed between Campus Gate N.W. and Collegiate Road N.W.</li>
<li>The right lane eastbound on 32 Avenue N.W. will be closed between Collegiate Boulevard N.W. and Campus Gate N.W.</li>
<li>Watch for cyclists and runners in the area</li>
<li>Watch for police directing traffic in the area</li>
</ul>

<p><strong>Additional Road closure information</strong></p>

<p>Follow The City of Calgary&rsquo;s Transportation Department on Twitter for up to date information on road closures, projects and all of Transportations&rsquo; services at <a href="http://www.twitter.com/yyctransport">@yyctransport</a>.</p>

<p>Visit <a href="http://calgary.ca/trafficinfo">Calgary.ca/trafficinfo</a> for up-to-date road closure and incident information.</p>

<p style="text-align: center;">-30-</p>]]></description><category><![CDATA[Transportation,road closures]]></category>
            <pubDate>Thu, 21 Jun 2018 16:07:35 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>City gears up for summer construction season</title>
                        <link>https://newsroom.calgary.ca/city-gears-up-for-summer-construction-season/</link>
                        <guid>https://newsroom.calgary.ca/city-gears-up-for-summer-construction-season/</guid><pp:caseid>286751</pp:caseid><description><![CDATA[<p>The City&rsquo;s Transportation department announced summer construction season is upon us&nbsp;and this year it includes close to 30 major infrastructure projects and more than 40 road repaving jobs.</p>

<p>Mayor Naheed Nenshi said a total investment of $441 million dollars ($408M: 29 major transportation construction projects and additional infrastructure work, $33M: 40+ pavement rehabilitation projects) is going into Calgary&rsquo;s infrastructure network this year alone.</p>

<p>&ldquo;With this investment, we are keeping Calgarians moving while also supporting our economy by creating over 3,500 jobs,&rdquo; said&nbsp;Mayor Nenshi. &ldquo;Once completed, this work will lead to improvements in travel, mobility and safety for people who walk, drive and cycle, also enabling continued development and growth in our city. Construction is never convenient while it&rsquo;s happening, but the results of all this work will be worth it.&rdquo;</p>

<p>Kerensa Fromherz, director of Transportation Infrastructure, added that part of enabling continued development and growth in our city means working hand-in-hand with communities and businesses. &ldquo;We recognize that construction affects&nbsp;everyone and we&rsquo;re working with communities and businesses to manage&nbsp;impacts as much as possible,&rdquo; said&nbsp;Fromherz. &ldquo;This includes staging our work around community events -&nbsp;such as last week&rsquo;s marathon -&nbsp;and considering business needs such as ceasing construction on 17 Avenue between Macleod Trail S. and 14 Street S.W. in July and August based on the peak summer season for the businesses there.&rdquo;</p>

<p>With construction work taking place in every quadrant of Calgary, The City has put measures into place to ensure citizens can still get where they need to go. Such measures include the coordination of projects and detours around the city, staged work during off-peak commute times to minimize impacts over rush hour, and where possible, geometric changes to the roadway and temporary alignment changes in order to keep the same number of lanes open.</p>

<p>Troy McLeod, director of Roads,&nbsp;said his crews and contracted staff are preparing for a busy season which includes paving work at more than 40 locations, covering about 212 lane-kilometers of road. Some of the major projects include the repaving of 14 Street, Barlow Trail, Memorial Drive and Heritage Drive. (A full list can be found online at <a href="http://www.calgary.ca/Transportation/Roads/Pages/Roads-Construction/Paving.aspx?redirect=/paving">Calgary.ca/paving</a>)</p>

<p>&ldquo;In addition, there will be various concrete repairs, traffic signal construction, streetlight repairs, bridge repairs and traffic safety improvements to help make life better for Calgarians,&rdquo; he said. &ldquo;All of this work will ensure safe and smooth roads for all modes of transportation.&rdquo;</p>

<p>McLeod said his crews and contracted services will be paying extra attention to making all construction sites pedestrian-friendly. &ldquo;It is our responsibility to ensure all our construction jobs include plans to maintain safe pedestrian infrastructure in order to disrupt Calgarians as little as possible while keeping their safety in mind.&rdquo;</p>

<p>McLeod also reminds drivers to please slow down&nbsp;and watch out for crews on-site. &ldquo;We would like to take this opportunity to remind Calgarians that the road is our crew&rsquo;s office and we want to make sure they go home safe. We ask that you please adhere to all signage posted and help our workers get their jobs done safely and effectively.&rdquo;</p>

<p>Some&nbsp;additional tips&nbsp;to help avoid delays during this year&rsquo;s construction season include:</p>

<ol>
<li>Check @yyctransport on Twitter for up to the minute closure information.</li>
<li>Check google maps for up to the minute traffic congestion and accident notifications</li>
<li>Tune in to your local TV and/or radio stations</li>
</ol>

<p>Please see the attached&nbsp;<a href="https://newsroom.calgary.ca/download/552861/2018constructionprojectsinfograph.pdf">infographic</a>&nbsp;and <a href="https://newsroom.calgary.ca/download/552915/2018transportationconstructionmap.pdf">map</a> for more information.</p>

<p style="text-align: center;">-30-</p>]]></description><category><![CDATA[banner,Transportation]]></category>
            <pubDate>Wed, 06 Jun 2018 14:00:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_constructionseason.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_constructionseason.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/constructionseason.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[ConstructionSeason]]></pp:imageTitle></item><item>
                        <title>City roads seeing less potholes as crews fix 3,500 in two months</title>
                        <link>https://newsroom.calgary.ca/city-roads-seeing-less-potholes-as-crews-fix-3500-in-two-months/</link>
                        <guid>https://newsroom.calgary.ca/city-roads-seeing-less-potholes-as-crews-fix-3500-in-two-months/</guid><pp:caseid>281831</pp:caseid><description><![CDATA[<p>Calgary - Mayor Naheed Nenshi today visited Calgary road crews who are working across the city, filling potholes. Crews have been out repairing potholes since early April and have filled more than 3,500 in the past two months.</p>

<p>&ldquo;Every year, we get potholes thanks to the freeze-thaw cycle conditions that cause additional stress on our roadways,&rdquo; said Mayor Nenshi, adding potholes are a problem in all winter cities across Canada. &ldquo;But, in Calgary, with the harsh winter we had, this year has been particularly difficult here. I am happy to say our crews are making great progress in getting them filled.&rdquo;</p>

<p>Potholes form when snow melts into cracks in the asphalt and then freezes, expanding in the cracks. The number of 311 reports of potholes this year is approximately 5,000 (including duplicate reports of the same pothole) which is slightly higher than what has been seen in previous years.</p>

<p>&ldquo;As crews were not able to fix potholes throughout the winter this year due to extreme cold temperatures, they have been playing catch-up to get the work done,&rdquo; said Mayor Nenshi, adding crews are currently filling about 700 potholes a week. &ldquo;They are making great progress but we still have some work to do.&rdquo;</p>

<p>Crews address potholes on a priority basis with major roads being completed first. To identify pavement in need of repair, The City inspects major roads twice a month and collector roads once a month. In residential areas, however, The City relies on citizens to report concerns.</p>

<p>The City encourages residents and motorists to help ensure that potholes are identified and repaired by reporting them by calling 311 or using the road repair form on the <a href="https://calgary-csrprodcwi.motorolasolutions.com/Public/Home.mvc/Index">311-online system</a> at Calgary.ca.</p>

<p>Being responsive to neighborhood complaints, including filling potholes, is critical to improving residents&rsquo; quality of life, said Mayor Nenshi. &ldquo;We appreciate the patience and understanding from Calgarians as our crews continue to work hard to improve the roads for them.&rdquo;</p>

<p>The City has budgeted $6.2 million this year for minor asphalt repairs which includes potholes.</p>

<p>Roads Director Troy McLeod&nbsp;is&nbsp;reminding drivers to&nbsp;slow down&nbsp;and watch out for crews working to repair potholes on city streets. &ldquo;When driving, remember to always look ahead. If you can spot a pothole in advance, then&nbsp;you have time&nbsp;to steer clear of it safely, without leaving your lane, or&nbsp;by safely changing lanes,&rdquo; he added.</p>

<p>Some&nbsp;additional&nbsp;driving safety&nbsp;tips&nbsp;to remember during pothole season include:&nbsp;</p>

<p>&bull;&nbsp;Don&rsquo;t tailgate:&nbsp;Leaving plenty of space between your vehicle and the one in front of you increases your odds of identifying a pothole with enough distance to avoid it.</p>

<p>&bull;&nbsp;Avoid puddles:&nbsp;Be&nbsp;cautious&nbsp;when&nbsp;driving through water as there&nbsp;may be potholes&nbsp;hiding&nbsp;in&nbsp;it.</p>

<p>&bull;&nbsp;Slow down:&nbsp;If you&nbsp;can&rsquo;t&nbsp;safely avoid a pothole, slow down to help mitigate damage.</p>

<p>&bull;&nbsp;Check tire pressure:&nbsp;Ensure your tires are inflated to the manufacturer&rsquo;s recommended pressure. Under- or over-inflated tires can make pothole damage worse.</p>

<p style="text-align: center;">-30-</p>]]></description><category><![CDATA[Transportation]]></category>
            <pubDate>Tue, 29 May 2018 12:30:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Motorists to be advised of significant traffic impacts this weekend on Calgary roads</title>
                        <link>https://newsroom.calgary.ca/motorists-to-be-advised-of-significant-traffic-impacts-this-weekend-on-calgary-roads/</link>
                        <guid>https://newsroom.calgary.ca/motorists-to-be-advised-of-significant-traffic-impacts-this-weekend-on-calgary-roads/</guid><pp:caseid>278189</pp:caseid><pp:subtitle>Glenmore Trail bridge removal to impact traffic this weekend</pp:subtitle><description><![CDATA[<p>For the second weekend in a row, motorists are being advised to avoid sections of Glenmore Trail or expect significant delays.</p>

<p>Starting at 9 p.m. on Friday, May 25, eastbound Glenmore Trail will be reduced to one lane and westbound Glenmore Trail will be reduced to two lanes between Deerfoot Trail and Blackfoot Trail S.E.</p>

<p>Motorists travelling on Glenmore between Deerfoot Trail and Blackfoot Trail are advised to expect delays with lane and speed reductions in place.</p>

<p>This closure will remain in place until 5 a.m. on Monday, May 28 and accommodates the removal of an abandoned rail bridge.</p>

<p>More information on this project can be found on <a href="http://email.news.calgary.ca/c/eJxNUMFqwzAM_Zrk5mDXSZwefFhG1lOhjN2HYiuxmWsH25D27-dtZRQEDz29J4mnpaJatHONV7Du02rZ9QOtjRwUX7QS3dIK4FwBCj2Io571PCsxFIOTJuet4i_V4a3Uvu-NArdCvBcsxEcEn7YQM2QbfCHeA-hU8AIrpkdPzmB9Rg9eYaHGaPWKJKKB2Tr7bz059NcQkZSl1pGHDCFlEhYyOlBfSwj5b9xA2m61lQfKBtoxwUTLGG9Yw9uxn2g_HcuhfhpF1VKPe3p6u47y1USbctgMxuasTgjK3IvwSZPlb1bkJ6hvMihofg">Calgary.ca</a>.</p>

<p><strong>Significant traffic impacts expected during Scotiabank Calgary Marathon Sunday</strong></p>

<p>Several roads in-and-around the downtown and surrounding areas will be impacted by the Scotiabank Marathon on Sunday. Motorists are advised to plan to take alternate routes to avoid traffic congestion.</p>

<p>The following road closures will be in place from 6 a.m. until 3 p.m. on Sunday, May 27:</p>

<ul>
<li>Olympic Way S.E. / 4 Street S.E. will be closed between 9 Avenue S.E. and Stampede Trail S.E.</li>
<li>9 Avenue S.E. will be closed between 3 Street S.E. and 12 Street S.E.</li>
<li>11 Avenue will be reduced to two westbound lanes from Olympic Way S.E. to 14 Street S.W.</li>
<li>12 Street will be closed between 9 Avenue S.E. and 1 Avenue N.E.</li>
<li>1 Avenue N.E. will be closed between 12 Street N.E. and 4 Street N.E.</li>
<li>4 Street N.E. will be reduced to one lane on east side from 1 Avenue N.E. to Riverfront Avenue N.E.</li>
<li>Memorial Drive will be reduced to one lane in each direction between 10 Street N.W. and the Reconciliation Bridge (4 Street N.E.)</li>
<li>Memorial Drive will be completely closed between 10 Street N.W. and Crowchild Trail N.W.</li>
<li>Riverfront Avenue will be closed from 1 Street S.W. to 6 Street S.E.</li>
<li>5 Street S.W. will be restricted to northbound traffic only between 18 Avenue S.W. and Elbow Drive S.W.</li>
<li>Southbound Elbow Drive will be reduced to one right lane from 5 Street S.W. to 30 Avenue S.W.</li>
<li>At Flanders Avenue S.W. ramps both directions on Crowchild Trail S.W. will be closed.</li>
<li>Eastbound 50 Avenue S.W. (Mount Royal Gate) will have a right lane closure from Crowchild Trail to 21 Street S.W.</li>
</ul>

<p>For more information on road and lanes closures in Calgary, please visit <a href="https://maps.calgary.ca/TrafficInformation/">the Calgary traffic Information map</a> on Calgary.ca, follow us <a href="https://twitter.com/cityofcalgary">@yyctransport</a> on Twitter and search the <a href="http://www.calgary.ca/Transportation/Roads/Pages/Traffic/Advisories-closures-and-detours/Special-event-advisories.aspx">Special Event Road Closures</a>.</p>

<p>&nbsp;</p>

<p style="text-align: center;">-30-</p>]]></description><category><![CDATA[Transportation]]></category>
            <pubDate>Thu, 24 May 2018 15:42:42 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Glenmore Trail bridge removal to impact traffic this May long weekend</title>
                        <link>https://newsroom.calgary.ca/glenmore-trail-bridge-removal-to-impact-traffic-this-may-long-weekend/</link>
                        <guid>https://newsroom.calgary.ca/glenmore-trail-bridge-removal-to-impact-traffic-this-may-long-weekend/</guid><pp:caseid>277458</pp:caseid><description><![CDATA[<p><span>Planning to head out of town this weekend? You may want to double check your route. Starting at 9 p.m. on Friday, May 18, westbound Glenmore Trail will be reduced to a single lane between Deerfoot Trail and Blackfoot Trail S.E. The ramp from southbound Deerfoot to westbound Glenmore will also be closed for this construction project. Motorists travelling westbound on Glenmore through this stretch are advised to expect delays.</span></p>

<p><span>The City is encouraging motorists to use either Southland Drive, or Memorial Drive as alternate westbound routes.</span></p>

<p><span>This closure remains in place through 5 a.m. on Tuesday, May 22 and accommodates the removal of an abandoned rail bridge. Information on this project can be found on <a href="http://www.calgary.ca/Transportation/Roads/Pages/Road-Maintenance/Bridge-rehabilitation/Glenmore-Trail-Bridge-east-of-Blackfoot-Trail.aspx">Calgary.ca</a>.</span></p>]]></description><category><![CDATA[Transportation]]></category>
            <pubDate>Thu, 17 May 2018 11:38:28 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Citizens asked to remove vehicles and carts during annual street sweeping program </title>
                        <link>https://newsroom.calgary.ca/citizens-asked-to-remove-vehicles-and-carts-during-annual-street-sweeping-program/</link>
                        <guid>https://newsroom.calgary.ca/citizens-asked-to-remove-vehicles-and-carts-during-annual-street-sweeping-program/</guid><pp:caseid>273539</pp:caseid><description><![CDATA[<p>Calgary - Spring is finally here, and that means The City&rsquo;s annual Street Sweeping program is kicking off.</p>

<p>Street sweeping gives City crews the opportunity to remove sanding materials and other debris that has accumulated on streets, sidewalks and boulevards from winter operations. Removing this material helps make the roads safer, protect the environment and keeps Calgary looking beautiful.</p>

<p>&ldquo;The unprecedented duration of this year&rsquo;s winter means it is vital for crews to sweep neighbourhoods in a timely fashion,&rdquo; says Bill Biensch, Maintenance Manager at Roads. &ldquo;We ask that citizens keep an eye out for our new street sweeping signs, which will indicate when our crews are coming, and when cars must be moved off the roadway. Failure to move your vehicle may result in a ticket.&rdquo;</p>

<p>Citizens whose street sweeping occurs on garbage collection days are reminded to leave their bins on their property&rsquo;s adjacent boulevard or on the sidewalk. This will allow both the garbage to be picked up and the streets to be swept.</p>

<p>Residential street sweeping this year will run 7 days a week which means many areas will be swept on the weekend. Please ensure vehicles are moved before 7 am and that visitors to your home are also aware of the parking restrictions.</p>

<p><strong>Calgary Parking Authority reminds Calgarians to move their vehicles or face the consequences</strong></p>

<p>Vehicles that have not been moved from an road with a parking ban in place are subject to a ticket and tow, to a nearby street if space is available, or to The City of Calgary&rsquo;s Impound Lot.</p>

<p>The Calgary Parking Authority is using a combination of enforcement officers and photo enforcement during street sweeping this year, so tickets will be placed on the vehicle&rsquo;s windshield or mailed to the registered owner. The ticket fine amount associated with street sweeping is $120; however, if paid within 10 days it is reduced to $80, or is $90 if paid within 30 days.</p>

<p>&ldquo;The Calgary Parking Authority supports this important work by providing enforcement services. We appreciate Calgarian&rsquo;s cooperation in removing their vehicles so that our streets can be cleaned as effectively as possible&rdquo; says Joan Hay, Calgary Parking Authority&rsquo;s Manager of Enforcement.</p>

<p><strong>How can I find out when my street is being swept?</strong></p>

<p>Citizens are encouraged to stay informed on when street sweeping in happening by visiting <a href="http://calgary.ca/sweep">Calgary.ca/sweep</a>.&nbsp;</p>

<p>As the weather in Calgary is often unpredictable and our street sweeping operations can be impacted by rain and snow, The City reminds Calgarians to keep checking the website regularly, as the schedule will be updated daily. A live map is available at <a href="https://maps.calgary.ca/streetsweeping">https://maps.calgary.ca/streetsweeping</a>.</p>

<p>Please note: Deerfoot Trail and Stoney Trail are maintained by the Province. However, The City will provide information about road closures for this work on Calgary.ca and on the @yyctransport Twitter account.</p>

<p style="text-align: center;">-30-</p>]]></description><category><![CDATA[banner,Transportation]]></category>
            <pubDate>Mon, 23 Apr 2018 10:30:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_img-3888.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_img-3888.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/img-3888.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[IMG_3888]]></pp:imageTitle></item><item>
                        <title>City’s Spring Clean-up Program postponed until weather improves </title>
                        <link>https://newsroom.calgary.ca/citys-spring-clean-up-program-postponed-until-weather-improves/</link>
                        <guid>https://newsroom.calgary.ca/citys-spring-clean-up-program-postponed-until-weather-improves/</guid><pp:caseid>272222</pp:caseid><description><![CDATA[<p>Due to continued low temperatures in Calgary, the start of the annual residential Spring Clean-up program, which normally begins in early April, is being delayed.</p>

<p>Bill Biensch, Roads Maintenance Manager, says street sweeping can not start until the snow and ice melts.</p>

<p>&ldquo;Due to the unprecedented nature of this year&rsquo;s winter we adjusted our sweeping schedules to ensure our operation can complete this work efficiently and effectively. Once gutters are free of ice we will be able to begin sweeping in residential areas.&rdquo;</p>

<p>Citizens are advised the online schedule of residential street sweeping dates will not be posted until the weather patterns trend upward. Street sweeping on major roads that are free of snow may also be postponed as crews are currently unable to use water, needed for street sweeping, without it freezing.</p>

<p>&ldquo;Crews will be doing some pre-sweeping in areas where they are able. But, unfortunately, the lower temperatures right now limit our ability to wet the roadway for sweeping,&rdquo; says Biensch. &ldquo;When the temperature stabilizes, we are prepared to start our sweeping program as normal.&rdquo;</p>

<p>An announcement will be made once the street sweeping schedule is available online at Calgary.ca/sweep. Updates will also be made on the @yyctransport on Twitter in the coming weeks.</p>

<p align="center">-30-</p>]]></description><category><![CDATA[Transportation]]></category>
            <pubDate>Mon, 09 Apr 2018 10:00:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_img-3888.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_img-3888.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/img-3888.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[IMG_3888]]></pp:imageTitle></item><item>
                        <title>Snow route parking ban to go into effect Sunday at 10 a.m.</title>
                        <link>https://newsroom.calgary.ca/snow-route-parking-ban-to-go-into-effect-sunday-at-10-am/</link>
                        <guid>https://newsroom.calgary.ca/snow-route-parking-ban-to-go-into-effect-sunday-at-10-am/</guid><pp:caseid>268530</pp:caseid><description><![CDATA[<p>The City of Calgary is advising citizens of a snow route parking ban that will go into effect on <strong>Sunday, March 4 at 10 a.m.</strong> Due to significant accumulations of snow, the snow route parking bans are expected to be in effect for 72 hours, or until lifted by The City.</p>

<p>&ldquo;Crews have been working around the clock since the snow started falling on Thursday night,&rdquo; says Bill Biensch, Roads Maintenance Manager. &ldquo;With significant accumulations of snow, the parking ban will help us get a head start on bus routes and connector roads.&rdquo;</p>

<p>Snow route parking bans support snow plowing operations by removing parked vehicles from the streets, and allowing crews to clear snow from Calgary roads more efficiently. &ldquo;Our goal is always to keep the largest amount of Calgarians moving safely as quickly as possible,&rdquo; added Biensch.</p>

<p><strong>How snow routes work</strong></p>

<p>Calgarians who park on a snow route are asked to move their vehicles during the ban. Vehicles that remain parked on these roads are subject to enforcement, up to and including a parking tag and tow.</p>

<p>Snow routes are marked by a blue sign with a white snowflake. To seen a map of where the snow routes are, visit <a href="http://calgary.ca/snow">Calgary.ca/snow</a>.</p>

<p><strong>Business areas and downtown bans</strong></p>

<p>Vehicles can continue to park in the ParkPlus system zones during the day (from 6 a.m. to 9 p.m.) during a parking ban.</p>

<p>For more information on the parking bans or to view the snow route maps, visit <a href="http://calgary.ca/snow">Calgary.ca/snow</a>.</p>

<p>The City of Calgary would like to thank Calgarians for their cooperation during snow route parking bans.</p>

<p style="text-align: center;">- 30 -</p>

<p><strong>Public Contact Information:</strong><br />
The City of Calgary, 3-1-1 Operations Centre<br />
Phone: 3-1-1 or from outside the local calling area phone 403.268.CITY (2489)</p>]]></description><category><![CDATA[Traffic,snow,snow route,Transportation]]></category>
            <pubDate>Sat, 03 Mar 2018 13:00:13 -0700</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_snowrouteparkingban.png?99075" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/uploads/1485/500_snowrouteparkingban.png?99075</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/snowrouteparkingban.png?99075</pp:imageOriginal><pp:imageTitle><![CDATA[snowrouteparkingban.png]]></pp:imageTitle></item><item>
                        <title>Snow Route Parking Ban to be lifted tonight</title>
                        <link>https://newsroom.calgary.ca/snow-route-parking-ban-to-be-lifted-tonight/</link>
                        <guid>https://newsroom.calgary.ca/snow-route-parking-ban-to-be-lifted-tonight/</guid><pp:caseid>257284</pp:caseid><description><![CDATA[<p>Calgary - The Snow Route Parking Ban that went into effect at 10 a.m. on Saturday will be lifted at 6 p.m. tonight, 16 hours ahead of schedule.</p>

<p>&ldquo;We want to thank everyone who moved their vehicle off the snow routes during this ban. It really helps our crews clear snow from curb-to-curb which makes the roads safer for everyone,&rdquo; says Roads Maintenance Manager Bill Biensch. &ldquo;Crews can now start operations on residential routes sooner.&rdquo;</p>

<p>Crews are currently finishing Day 2 of the 7 Day Snow Clearing Plan. Currently, there are 49 sanders and 24 graders working on roadways and 48 dedicated staff with 24 pieces of small equipment working on pedestrian facilities such as steps, walks, and pedestrian overpasses.</p>

<p>Once crews are finished their work on the main routes tomorrow, they will move into the residential areas where they will knock-down ruts and lay down material to ensure all roads are passable.</p>

<p>Biensch is asking citizens to be patient as crews are working on a priority system which is reset every time it snows.</p>

<p>&ldquo;We have had more snow this month than any February in past five years and we are only 12 days in,&rdquo; says Biensch. &ldquo;Our snow clearing plan, which normally lasts seven days, has been active for 15 consecutive days due to multiple snows events. I would like to recognize City crews for their dedicated efforts during this time and all Calgarians for their support and patience as we work to get the job done.&rdquo;</p>

<p>As of noon today, 50 hours into the ban, The Calgary Parking Authority had issued 1,920 tickets for non-compliance with the parking ban. The final numbers are expected to be slightly lower than the Feb. 5th&nbsp;parking ban which saw 2,945 <em>tickets issued in just 46 hours.</em></p>

<p>&ldquo;We had every available officer dedicated to snow route enforcement during this ban. It is our hope that every car would move off the snow route,&rdquo; said Kevin Bulmer, Enforcement Coordinator with the Calgary Parking Authority. &ldquo;Thousands of vehicles did comply and that made the snow clearing efforts more effective.&rdquo;</p>]]></description><category><![CDATA[Traffic,snow,Transportation,banner]]></category>
            <pubDate>Mon, 12 Feb 2018 13:50:04 -0700</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_2016-0018-img-0655-58111.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_2016-0018-img-0655-58111.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/2016-0018-img-0655-58111.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[2016-0018_IMG_0655_58111]]></pp:imageTitle></item><item>
                        <title>City announces snow route parking ban to begin Saturday</title>
                        <link>https://newsroom.calgary.ca/city-announces-snow-route-parking-ban-to-begin-satur/</link>
                        <guid>https://newsroom.calgary.ca/city-announces-snow-route-parking-ban-to-begin-satur/</guid><pp:caseid>256979</pp:caseid><description><![CDATA[<p>The City of Calgary is advising citizens of a snow route parking ban that will go into effect on <strong>Saturday, Feb. 10 at 10 a.m.</strong> Due to significant accumulations of snow and high drifting across Calgary, the Snow Route parking bans are expected to be in effect for 72 hours, or until lifted by The City.</p>

<p><strong>How snow routes work</strong></p>

<p>Calgarians who park on a snow route are asked to move their vehicles during the ban. Vehicles that remain parked on these roads are subject to enforcement, up to and including a parking tag and tow. Snow routes are marked by a blue sign with a white snowflake. To find more information regarding snow route parking bans, visit Calgary.ca/roadconditions.</p>

<p>The snow route parking ban will help crews clear Priority 2 routes from curb to curb as efficiently and safely as possible. Snow clearing operations are ongoing.</p>

<p><strong>Business areas and downtown bans</strong></p>

<p>Vehicles can continue to park in the ParkPlus system zones during the day (from 6 a.m. to 9 p.m.) during a Snow Event. For more information on snow route parking bans, visit Calgary.ca/snow and click more information under the snow route banner.</p>

<p>For snow route maps and more information, <a href="http://calgary.ca/snow">visit calgary.ca/snow</a>.</p>

<p>The City of Calgary would like to thank Calgarians for their cooperation during snow route parking bans.</p>

<p style="text-align: center;">- 30 -</p>

<p>Public Contact Information:<br />
The City of Calgary, 3-1-1 Operations Centre<br />
Phone: 3-1-1 or from outside the local calling area phone 403.268.CITY (2489)</p>]]></description><category><![CDATA[banner,Transportation,Traffic,parking,snow]]></category>
            <pubDate>Thu, 08 Feb 2018 11:43:36 -0700</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_2016-0018-img-0655-58111.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_2016-0018-img-0655-58111.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/2016-0018-img-0655-58111.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[2016-0018_IMG_0655_58111]]></pp:imageTitle></item><item>
                        <title>Snow Route Parking Ban to be lifted tomorrow at 7 a.m.</title>
                        <link>https://newsroom.calgary.ca/snow-route-parking-ban-to-be-lifted-tomorrow-at-7-am/</link>
                        <guid>https://newsroom.calgary.ca/snow-route-parking-ban-to-be-lifted-tomorrow-at-7-am/</guid><pp:caseid>256567</pp:caseid><description><![CDATA[<p><span>Calgary - Roads is working on Day 2 of the 7 Day Snow Plan and is nearly complete Calgary roads affected by the snow route parking ban. As a result, the parking ban will be lifted at 7 a.m. on Wednesday, February 7.</span></p>

<p><span>The City would like to thank motorists for their cooperation in keeping Calgary&rsquo;s roads safe this winter.</span></p>

<p><span>&ldquo;These parking restrictions have helped us remove the snow from major traffic routes more effectively,&rdquo; says Roads Maintenance Manager Bill Biensch. &ldquo;Crews can now start snow operations on residential routes sooner. This benefits all Calgarians and helps make travel safer for everyone during the winter months,&rdquo;</span></p>

<p><span>The ban will be lifted a full day earlier than previously anticipated as crews have made significant progress on clearing the snow from Priority 2 roads.</span></p>

<p><span>&ldquo;This will allow people to park on snow routes tomorrow morning when they are dropping children off for school or parking for a day of work,&rdquo; Biensch adds.</span></p>

<p><span>Please be aware that another parking ban may be issued in the event of significant snow accumulation across Calgary.</span></p>

<p><span>We encourage Calgarians to visit Calgary.ca/snow or follow us on Twitter @yyctransport for the most up-to-date information.</span>&nbsp;</p>

<p style="text-align: center;">-30-</p>]]></description><category><![CDATA[Transportation]]></category>
            <pubDate>Tue, 06 Feb 2018 15:00:33 -0700</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>City announces snow route parking ban</title>
                        <link>https://newsroom.calgary.ca/city-announces-snow-route-parking-ban/</link>
                        <guid>https://newsroom.calgary.ca/city-announces-snow-route-parking-ban/</guid><pp:caseid>256241</pp:caseid><description><![CDATA[<p>The City of Calgary is advising citizens of a snow route parking ban that will go into effect on Monday, February 5 at 9 a.m. Due to significant accumulations of snow and high drifting across Calgary, the Snow Route parking bans are expected to be in effect for 72 hours, or until lifted by The City.</p>

<p><strong>How snow routes work</strong></p>

<p>Calgarians who live on a snow route are asked to move their vehicles during the ban.&nbsp;Vehicles that remain parked on these roads are subject to enforcement, up to and including a parking tag and tow. Snow routes are marked by a blue sign with a white snowflake. To find more information regarding snow route parking bans, visit <a href="http://calgary.ca/snow">Calgary.ca/snow</a>.</p>

<p>The snow route parking ban will help crews clear Priority 2 routes from curb to curb as efficiently and safely as possible. Snow clearing operations are ongoing. Parked cars must be moved from snow routes when a parking ban is called. Vehicles that remain parked on these roads during the ban are subject to enforcement, up to an including a parking ticket and tow.</p>

<p>Vehicles can continue to park in the ParkPlus system zones during the day (from 6 a.m. to 9 p.m.) Monday to Saturday during a Snow Event. For more information on snow route parking bans, visit <a href="http://calgary.ca/snow">Calgary.ca/snow</a> and click <em>more information</em> under the snow route banner.</p>

<p><strong>Roads continues tackling the snow</strong></p>

<p>Roads crews are working around the clock maintaining Calgary&rsquo;s roads to keep Calgarians on the move.</p>

<p>&ldquo;Crews have been working around the clock since the snow started falling late Friday,&rdquo; says John Bolger, acting Roads Maintenance Manager. &ldquo;With more snow anticipated later tonight, the parking ban will help us get a head start on bus routes and connector roads.&rdquo;</p>

<p>Snow route parking bans&nbsp;support snow plowing operations by removing parked vehicles from the streets, and allowing crews to clear snow from Calgary roads more efficiently. &ldquo;Our goal is always to keep the largest amount of Calgarians moving safely as quickly as possible,&rdquo; added Bolger.</p>

<p>For snow route maps and more information, visit <a href="http://calgary.ca/snow">Calgary.ca/snow</a>.</p>

<p>The City of Calgary would like to thank Calgarians for their cooperation during snow route parking bans.</p>

<p align="center">- 30 -</p>]]></description><category><![CDATA[Transportation,snow route parking ban,banner]]></category>
            <pubDate>Sun, 04 Feb 2018 13:29:00 -0700</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_2016-0018-img-0655-58111.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_2016-0018-img-0655-58111.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/2016-0018-img-0655-58111.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[2016-0018_IMG_0655_58111]]></pp:imageTitle></item><item>
                        <title>The City of Calgary and Cadillac Fairview Open State-of-the-Art Pedestrian Bridge at CF Chinook Centre</title>
                        <link>https://newsroom.calgary.ca/the-city-of-calgary-and-cadillac-fairview-open-state-of-the-art-pedestrian-bridge-at-cf-chinook-centre/</link>
                        <guid>https://newsroom.calgary.ca/the-city-of-calgary-and-cadillac-fairview-open-state-of-the-art-pedestrian-bridge-at-cf-chinook-centre/</guid><pp:caseid>250809</pp:caseid><pp:subtitle>This new modern bridge supports economic development while reducing traffic congestion and improving accessibility in the area.</pp:subtitle><description><![CDATA[<p>On December 8, The City of Calgary and Cadillac Fairview (CF) will open the new pedestrian bridge across Macleod Trail, at 61 Avenue S.W. This bridge will provide a safe, accessible and convenient pedestrian crossing for Calgarians, shoppers, employees and tourists over the busiest pedestrian corridor outside of the downtown core.</p>

<p>The City of Calgary and Cadillac Fairview have partnered to invest a joint cost of $13M ($6.5 M each) in the construction of the 61 Avenue S.W. pedestrian bridge. This iconic landmark leads to one of the main entry points at CF Chinook Centre, which draws 14.8 million visitors per year. The opening of this bridge represents the vision that both The City of Calgary and CF share, which is to help create a vibrant and safe community for all Calgarians to enjoy.</p>

<p>&ldquo;The opening of the new pedestrian bridge marks a significant milestone for Cadillac Fairview and further exemplifies our dedication to providing a premium shopping experience in the community, as well as our continued investment in the city of Calgary,&rdquo; says Paige O&rsquo;Neill, General Manager, CF Chinook Centre.</p>

<p>Acting Director of City of Calgary&rsquo;s Transportation Infrastructure Department, Kerensa Fromherz, elaborates: &ldquo;It&rsquo;s been a big year for us. This is one of 21 transportation projects that make up a $400 million investment to help manage traffic and help people move around our city.&rdquo;</p>

<p>The City of Calgary&rsquo;s investment in the project includes more than $3 million from the Government of Alberta&rsquo;s Municipal Sustainability Initiative, which supports local infrastructure priorities. Municipal Affairs Minister, Shaye Anderson expanded on the importance of that funding. &ldquo;Investing in municipal infrastructure creates jobs, helps build stronger communities and makes life better for Alberta families. Through this partnership we have supported the economy, provided an ongoing boost to businesses, and literally helped to bridge the community.&rdquo;</p>

<p><strong>A formal grand opening ceremony is being held this evening at 7 p.m. inside CF Chinook Centre to celebrate this exciting addition to our city.</strong></p>

<p style="text-align: center;"><strong>- 30 -</strong></p>]]></description><category><![CDATA[city news,Transportation,banner]]></category>
            <pubDate>Fri, 08 Dec 2017 12:35:33 -0700</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_nightview1002.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_nightview1002.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/nightview1002.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[nightview1 (002)]]></pp:imageTitle></item><item>
                        <title>Road &amp; Transit Closure Update</title>
                        <link>https://newsroom.calgary.ca/road--transit-closure-update/</link>
                        <guid>https://newsroom.calgary.ca/road--transit-closure-update/</guid><pp:caseid>243763</pp:caseid><description><![CDATA[<p>Please be aware that road and Transit closures remain in effect this morning after an incident involving falling glass occured this weekend.</p>

<p>Road Closures:</p>

<ul>
<li>1 St &ndash; between 5 Av & 8Av SW</li>
<li>6 Av between Centre & 2 St SW</li>
<li>7 Av between Centre & 2 St SW to pedestrians</li>
</ul>

<p>Transit:</p>

<ul>
<li>C-Trains are running through the core but will not be stopping at 1 St SW Station</li>
</ul>

<p>Thank you for your patience as crews work safely to resolve the situation.</p>

<p><img alt="" src="//content.presspage.com/uploads/1485/500_dtclosure.jpg?x=1509365879130" style="width: 500px; height: 281px; margin: 5px; float: left;" /></p>]]></description><category><![CDATA[city news,Transportation,Public Safety,road closures]]></category>
            <pubDate>Mon, 30 Oct 2017 06:21:46 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>The City of Calgary ready for snow</title>
                        <link>https://newsroom.calgary.ca/the-city-of-calgary-ready-for-snow/</link>
                        <guid>https://newsroom.calgary.ca/the-city-of-calgary-ready-for-snow/</guid><pp:caseid>233252</pp:caseid><description><![CDATA[<p>The City of Calgary is prepared for the upcoming winter season and is ready to address tomorrow&rsquo;s snowy and windy conditions.</p>

<p>Environment Canada is calling for cool, high winds overnight followed by approximately 10 cms of snow in the Calgary area throughout the day Monday.</p>

<p>&ldquo;In anticipation of high winds and heavy snowfall overnight and tomorrow, we have additional trucks and staff on stand-by,&rdquo; says Roads Maintenance Manager Bill Biensch. &ldquo;Significant amounts of snow falling within a short period could result in accumulation on the roads. But the warm road temperatures and mild weather, should make this a relatively easy clean-up if the rain does turn to snow.&rdquo;</p>

<p>The City&rsquo;s Snow and Ice Control (SNIC) program plan is organized months before the winter season to account for a variety of weather conditions. Under the plan, crews sand, salt and plow roads and sidewalks based on a Council-approved priority system - the more traffic there is on a roadway, the higher the priority.</p>

<p>&ldquo;This will keep the greatest number of commuters, moving quickly and safely,&rdquo; says Biensch.</p>

<p>While City crews are prepared, the first snowfall of the season always seems to catch people a little off-guard. For this reason, The City is reminding drivers to prepare for a potentially slower commute tomorrow morning. &ldquo;Give yourself a little bit of extra time, plan for delays, slow down and drive to conditions,&rdquo; adds Biensch.</p>

<p>Crews will also be ready to help clean-up any tree debris and leaves left on public walkways and roads, and The City reminds citizens to lookout for these hazards.</p>

<p>There are several ways Calgarians can stay informed on winter road conditions, visit&nbsp;<a href="http://www.calgary.ca/Transportation/Roads/Pages/Road-Maintenance/Snow-and-ice-control/Default.aspx">calgary.ca/snow</a>, follow&nbsp;us on Twitter <a href="http://www.twitter.com/yyctransport">@yyctransport</a>, view&nbsp;our <a href="http://www.calgary.ca/Transportation/Roads/Pages/Traffic/Advisories-closures-and-detours/Calgary-Traffic-Cameras.aspx">traffic cameras</a> or contact&nbsp;311.</p>

<p>These tools can help Calgarians stay up to date on:</p>

<ul>
<li>Road conditions</li>
<li>Travel times</li>
<li>Traffic incidents</li>
</ul>

<p align="center">- 30 -</p>

<p>&nbsp;</p>]]></description><category><![CDATA[Transportation]]></category>
            <pubDate>Sun, 01 Oct 2017 18:28:08 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Calgary road closures - September 28, 2017</title>
                        <link>https://newsroom.calgary.ca/calgary-road-closures---september-28-2017/</link>
                        <guid>https://newsroom.calgary.ca/calgary-road-closures---september-28-2017/</guid><pp:caseid>233088</pp:caseid><description><![CDATA[<p>Calgary road closures &ndash; September 28, 2017</p>

<p>This press release is aimed at informing 911 and the media of major road closures and lane restrictions. For information on closures in your area, visit Calgary.ca/trafficinfo. Find up to the minute road closure information on the Transportation Twitter account (@yyctransport).</p>

<p>Northeast</p>

<p><strong>NEW:</strong> Reduced lanes at 3419 Edmonton Trail N.E. beginning Friday, September 29 at 6 p.m. until Sunday, October 1 at 7 p.m. Two way traffic to be set-up. This closure accommodates water services.</p>

<p><strong>NEW:</strong> Road closure at 1171 Radnor Avenue N.E. beginning Friday, September 29 at 6 p.m. until Monday, October 2 at 5 a.m. This closure accommodates construction.</p>

<p><strong>NEW:</strong> Reduced lanes on 36 Street N.E. between 5 Avenue and 8 Avenue N.E. on Saturday, September 30 from 7 a.m. to 7 p.m. This closure accommodates paving.</p>

<p><strong>NEW:</strong> Reduced lanes on 36 Street N.E. and 16 Avenue N.E. on Sunday, October 1 from 6 a.m. to 1 p.m. This closure accommodates utility work.</p>

<p><strong>NEW:</strong> Reduced lanes on 80 Avenue N.E. between 36 Street and Metis Trail N.E. beginning Sunday, October 1 at 12 p.m. until Sunday, October 22 at 12 p.m. This closure accommodates construction.</p>

<p><strong>NEW:</strong> Reduced lanes on 64 Avenue N.E. and 68 Street N.E. starting Monday, October 2 until Tuesday, October 3 daily from 8:30 a.m. to 3:30 p.m. This closure accommodates construction.</p>

<p><strong>NEW:</strong> Reduced lanes eastbound on Memorial Drive N.E. between 9 Street and 12 Street N.E. beginning Monday, October 2 until Wednesday, October 4 daily from 7 a.m. to 3 p.m. This closure accommodates transportation infrastructure.</p>

<p><strong>NEW:</strong> Reduced lanes on Country Hills Boulevard N.E. between Barlow Trail and 25 Street N.E. beginning Monday, October 2 until Wednesday, October 4 daily from 9 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Reduced lanes eastbound on Memorial Drive N.E. between 9 Street and 12 Street N.E. beginning Wednesday, September 27 until Friday, September 29 daily from 7 a.m. to 3 p.m. This closure accommodates transportation infrastructure.</p>

<p>Road closure on Regal Crescent N.E. and Russet Road N.E. beginning Friday, September 22 at 6 p.m. until Friday, September 29 at 8 p.m. This closure accommodates sanitary line/storm replacement.</p>

<p>Reduced lanes on Country Hills Boulevard N.E. and Barlow Trail N.E. beginning Monday, September 25 until Friday, September 29 daily from 9 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Northwest</p>

<p><strong>NEW:</strong> Road closure on 14 Avenue N.W. and 19 Street N.W. beginning Friday, September 29 at 7 p.m. until Monday, October 2 at 4 a.m. Two-way flagging will be provided for buses only. This closure accommodates construction.</p>

<p><strong>NEW:</strong> Road closure on Home Road N.W. between 16 Avenue and 32 Avenue and east on 32 Avenue to 48 Street N.W. on Saturday, September 30 from 5:30 a.m. to 7 p.m. This closure accommodates paving.</p>

<p>Reduced lanes and sidewalk closure northbound on Northmount Drive N.W. and Brisebois Drive N.W. beginning Thursday, September 28 until Friday, September 29 daily from 9 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Reduced lanes and partial sidewalk closure on east side of 10 Street N.W. and Kensington Road N.W. starting Tuesday, September 26 until Friday, September 29 daily from 8 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Road closure on 60 Street N.W. between Bowness Road N.W. and Bow Crescent N.W. starting Monday, September 25 at 8 a.m. until Monday, October 2 at 7 p.m. This closure accommodates catch basin installation.</p>

<p>Reduced lanes westbound and eastbound on 16 Avenue and Home Road N.W. beginning Monday, September 11 until Saturday, September 30 daily weekdays from 9 a.m. to 3 p.m. and Saturdays from 7 a.m. to 5 p.m. This closure accommodates construction.</p>

<p>16 Avenue N.W. at 29 Street N.W. / Uxbridge Drive N.W. will see various lane closures until the end of October, 2017 as part of an intersection improvement project.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/TransCanada-Highway-Sarcee-Trail-Interchange-Project.aspx"><strong>Trans Canada Highway / Sarcee Trail Interchange Improvements project</strong></a></p>

<ul>
<li>Daily lane reductions on Sarcee Trail N.W. at 16 Avenue N.W. from 9 a.m. to 3 p.m. through project limits to the end of October.</li>
</ul>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/Bowfort-Rd-Trans-Canada-Hwy-interchange.aspx"><strong>16 Ave NW / Bowfort Road Interchange Improvements</strong></a></p>

<ul>
<li>Daily lane reductions on Bowfort Road N.W. and 16 Avenue N.W. through the project limits from 9 a.m. to 3 p.m. until further notice. For more information on this project, visit the project page.</li>
</ul>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/16-Avenue-Home-Road-NW-Upgrades.aspx"><strong>16 Avenue and Home Road N.W. Upgrades</strong></a></p>

<ul>
<li>Please note that the following lane closures are in effect until the end of September
<ul>
<li>Monday to Friday from 9 a.m. &ndash; 3 p.m.: The right-hand lane will be closed in each direction.</li>
<li>Saturdays from 7 a.m. &ndash; 5 p.m.: The right-hand lane will be closed in each direction</li>
</ul>
</li>
<li>To avoid delays please consider using Bowness Road N.W. as an alternate route to bypass the construction area</li>
</ul>

<p>Southeast</p>

<p><strong>UPDATE:</strong> Road closure eastbound on 3 Avenue S.E. between Centre Street and 1 Street S.E. has been extended until Saturday, October 14 at 7 p.m. Use alternate routes. This closure accommodates sidewalk and curb replacement.</p>

<p><strong>NEW:</strong> The ramp from westbound Glenmore Trail S.E. to Centre Street S will be closed nightly beginning Friday, September 29 until Saturday, October 7 from 10 p.m. until 5 a.m. and over the weekend. This closure accommodates underground utility work.</p>

<p><strong>NEW:</strong> Reduced lanes on 17 Avenue S.E. between 47 Street and Hubalta Road S.E. on Saturday, September 30 from 9 a.m. to 4 p.m. This closure accommodates transportation infrastructure.</p>

<p><strong>NEW:</strong> Road closure on 50 Avenue S.E. between 25 Street and 36 Street S.E. beginning Saturday, September 30 at 6 a.m. until Sunday, October 1 at 4 p.m. This closure accommodates construction.</p>

<p><strong>NEW:</strong> Road closure on Centre Street S.E. between 15 Avenue and 18 Avenue S.E. starting Saturday, September 30 at 7 a.m. until Monday, October 2 at 7 p.m. This closure accommodates transportation infrastructure.</p>

<p>Reduced lanes at 1707 44 Street S.E. beginning Thursday, September 28 at 6 a.m. until Saturday, September 30 at 6:30 p.m. Two way traffic will be set up on east side. This closure accommodates water services.</p>

<p>Road closure on 7 Avenue S.E. between 5 Street and 6 Street S.E. beginning Monday, September 25 at 7 a.m. until Friday, October 6 at 7 p.m. Drivers are advised to use alternate routes. This closure accommodates a service tie-in.</p>

<p>Macleod Trail will have reduced lanes at Southland Drive S.E. starting at 9 a.m. on Wednesday, September 20.</p>

<ul>
<li>During the morning peak hours, there will be a traffic pattern change on Macleod Trail at Southland Drive S.E. (5 a.m. to 9 a.m.).</li>
<li>There will be no left turn for at Southland Drive for traffic travelling in either direction of Macleod Trail at Southland Drive S.E.</li>
<li>Motorists wishing to turn left onto Southland Drive at Macleod Trail are advised to use alternate routes of Heritage Drive or Anderson Road S.E.</li>
<li>During this closure, motorists are advised to expect delays in the area, watch for workers in the construction zone, and use alternate routes when possible. This work will continue through 9 p.m. on Saturday, October 7 and accommodates valve install on the water main in the work area.</li>
</ul>

<p>Reduced lanes westbound on 114 Avenue S.E. between 24 Street and 29 Street S.E. beginning Friday, September 15 until Friday, October 6 daily from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Reduced lanes on 18 Street S.E. north of Douglas Glen Boulevard S.E. beginning Friday, September 1 until Friday, November 3 daily weekdays from 9 a.m. to 6 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Reduced lane northbound on 18 Street S.E. between Riverglen Drive S.E. and Riverbirch Crescent S.E. beginning on Monday, August 14 to Monday, November 6 weekdays only from 9 a.m. to 6 p.m. Closure is to accommodate construction.</p>

<p>Reduced lane eastbound on 17 Avenue S.E. between 19 Street S.E. and Deerfoot Trail S.E. on Cushing Bridge beginning on Thursday, August 10 at 7 a.m. to Tuesday, October 31 at 7 p.m. Speeds will be reduced to 50 km/h through the work area. Flagman will be onsite to direct traffic. Closure is to accommodate construction.</p>

<p>Southwest</p>

<p><strong>NEW:</strong> Reduced lanes and sidewalk closure northbound on Forand Street S.W. between Cyprus Green and Peacekeepers Drive S.W. on Friday, September 29 from 9 a.m. to 3 p.m. This closure accommodates construction.</p>

<p><strong>NEW:</strong> Road closure on 70 Avenue S.W. between MacLeod Trail S and 4A Street S.W. on Saturday, September 30 from 7 a.m. to 5 p.m. These closures accommodate crane lifts.</p>

<p><strong>NEW:</strong> Road closure on 17 Avenue S.W. and 5 Street S.W. on Saturday, September 30 from 7 a.m. to 7 p.m. This closure accommodates transportation infrastructure.</p>

<p><strong>NEW:</strong> Road closure on 14 Avenue S.W. between 1 Street and 2 Street S.W. beginning Saturday, September 30 at 6 a.m. until Sunday, October 1 at 5 p.m. Local traffic will be maintained by flagmen at all times. Use alternate routes and expect delays. This closure accommodates crane set-up.</p>

<p><strong>NEW:</strong> Road closure on 1 Street S.W. between 10 Avenue and 12 Avenue S.W. beginning Saturday, September 30 at 7 a.m. until Sunday, October 1 at 7 p.m. Use alternate routes and expect delays. This closure accommodates milling work.</p>

<p><strong>NEW:</strong> Road closure on 1 Street S.W. between 12 Avenue and 13 Avenue S.W. beginning Saturday, September 30 at 6 a.m. until Sunday, October 1 at 6:30 p.m. Use alternate routes and expect delays. This closure accommodates water services.</p>

<p>Road closure on 70 Avenue S.W. between Macleod Trail South and 4A Street S.W. on Saturday, September 23 and Saturday, September 30 from 7 a.m. to 5 p.m. These closures accommodate crane lifts.</p>

<p>Road closure on 17 Avenue S.W. between 4 Street and 5 Street S.W. beginning Wednesday, September 20 at 7 a.m. until Sunday, October 15 at 7 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Various road closures on 2 Street S.W. between 25 Avenue and 26 Avenue S.W. from 6:30 a.m. to 6:30 p.m. beginning on Monday, September 18. During this closure, motorists are advised to expect delays in the area, and use alternate routes when possible. This closure remains in place until 6:30 p.m. on Saturday, September 30 and accommodates water utility upgrades.</p>

<p>Road closure on 17 Avenue S.W. between 1 Street S.E. and 2 Street S.E. with closure on 1 Street S.W. between 15 Avenue S.W. and 17 Avenue S.W. beginning on Saturday, August 5 at 7 a.m. to Sunday, October 1 at 7 p.m. Restricted parking will also be in place on 17 Avenue S.E. with vehicle detours indicated via signage. Closures are to accommodate construction.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Avenue-S-reconstruction.aspx"><strong>17 Avenue S. reconstruction project</strong></a></p>

<ul>
<li>Reduced lanes westbound on 17 Avenue S.E. between 1 Street S.E. and Macleod Trail S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Reduced lanes westbound on 17 Avenue S.E. between Centre Street S.E. and 1 Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Road closure on 17 Avenue S.E. between 1 Street S.W. and Centre Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Access will be open to local traffic only. Vehicle detours will be indicated via signage.</li>
<li>For more information, visit the <a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Ave-SW-construction-schedule.aspx">construction schedule page</a>.</li>
</ul>

<p>Alberta Transportation</p>

<p>Alberta Transportation maintains Deerfoot Trail (Hwy.2) and Stoney Trail (Hwy. 201). For more information on work happening on these roads visit <a href="http://www.transportation.alberta.ca/">Alberta Transportation&rsquo;s website.</a></p>

<p>Southwest Ring Road Project</p>

<p>24 Street S.W. is permanently closed north of Highway 22x as part of the SWRR construction project. For more information on work happening, visit <a href="http://www.swcrrproject.com/traffic-updates/">http://www.swcrrproject.com/traffic-updates/</a></p>

<h2>Special Events</h2>

<p><strong><u>Calgary&rsquo;s Culture Days Kick-off &ndash; Friday, September 29 &ndash; 6 a.m. to 11:59 p.m.</u></strong></p>

<ul>
<li>30 Avenue S.E. is closed between 17 Street S.E. and 16 Street S.E.</li>
</ul>

<p><strong><u>Harvest Half Marathon &ndash; Saturday, September 30 &ndash; 7:30 a.m. to 10:30 a.m.</u></strong></p>

<ul>
<li>Midlake Rise S.E. is closed; Marathon walkers begin here at 7 a.m., runners at 7:45 a.m.</li>
<li>The right lane of northbound Sun Valley Boulevard S.E. is closed at Sikome Road S.E.</li>
<li>The right lane of northbound Sun Mills Drive S.E. is closed at Sun Valley Boulevard S.E.</li>
<li>The left lane of westbound Midlake Boulevard S.E. is closed east of Midridge Boulevard S.E.</li>
<li>Motorists are advised to watch for police onsite and are advised to use alternate routes.</li>
</ul>

<p><strong><u>CIBC Run for the Cure &ndash; Sunday, October 1 &ndash; 9 a.m. to 11 a.m.</u></strong></p>

<ul>
<li>Willow Park Drive S.E. is closed from Bonaventure Drive S.E. to Acadia Drive S.E.</li>
<li>Acadia Drive S.E. is closed from Willow Park Drive S.E. to Willingdon Boulevard S.E.</li>
<li>Willingdon Boulevard S.E. is closed between Acadia Drive and Fairmount Drive S.E.</li>
<li>Bonaventure Drive S.E. is closed north of Trico Centre to Willow Park Drive S.E.</li>
<li>Motorists are advised to watch for police onsite and are advised to use alternate routes.</li>
</ul>]]></description><category><![CDATA[Transportation,road closures]]></category>
            <pubDate>Thu, 28 Sep 2017 15:35:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Calgary road closures - September 27, 2017</title>
                        <link>https://newsroom.calgary.ca/calgary-road-closures---september-27-2017/</link>
                        <guid>https://newsroom.calgary.ca/calgary-road-closures---september-27-2017/</guid><pp:caseid>232906</pp:caseid><description><![CDATA[<p>Calgary road closures &ndash; September 27, 2017</p>

<p>This press release is aimed at informing 911 and the media of major road closures and lane restrictions. For information on closures in your area, visit Calgary.ca/trafficinfo. Find up to the minute road closure information on the Transportation Twitter account (@yyctransport).</p>

<p>Northeast</p>

<p>Reduced lanes eastbound on Memorial Drive N.E. between 9 Street and 12 Street N.E. beginning Wednesday, September 27 until Friday, September 29 daily from 7 a.m. to 3 p.m. This closure accommodates transportation infrastructure.</p>

<p>Road closure on Regal Crescent N.E. and Russet Road N.E. beginning Friday, September 22 at 6 p.m. until Friday, September 29 at 8 p.m. This closure accommodates sanitary line/storm replacement.</p>

<p>Reduced lanes on Country Hills Boulevard N.E. and Barlow Trail N.E. beginning Monday, September 25 until Friday, September 29 daily from 9 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Northwest</p>

<p><strong>NEW:</strong> Reduced lanes and sidewalk closure northbound on Northmount Drive N.W. and Brisebois Drive N.W. beginning Thursday, September 28 until Friday, September 29 daily from 9 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Reduced lanes and partial sidewalk closure on east side of 10 Street N.W. and Kensington Road N.W. starting Tuesday, September 26 until Friday, September 29 daily from 8 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Road closure on 60 Street N.W. between Bowness Road N.W. and Bow Crescent N.W. starting Monday, September 25 at 8 a.m. until Monday, October 2 at 7 p.m. This closure accommodates catch basin installation.</p>

<p>Reduced lanes westbound and eastbound on 16 Avenue and Home Road N.W. beginning Monday, September 11 until Saturday, September 30 daily weekdays from 9 a.m. to 3 p.m. and Saturdays from 7 a.m. to 5 p.m. This closure accommodates construction.</p>

<p>16 Avenue N.W. at 29 Street N.W. / Uxbridge Drive N.W. will see various lane closures until the end of October, 2017 as part of an intersection improvement project.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/TransCanada-Highway-Sarcee-Trail-Interchange-Project.aspx"><strong>Trans Canada Highway / Sarcee Trail Interchange Improvements project</strong></a></p>

<ul>
<li>Daily lane reductions on Sarcee Trail N.W. at 16 Avenue N.W. from 9 a.m. to 3 p.m. through project limits to the end of October.</li>
</ul>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/Bowfort-Rd-Trans-Canada-Hwy-interchange.aspx"><strong>16 Ave NW / Bowfort Road Interchange Improvements</strong></a></p>

<ul>
<li>Daily lane reductions on Bowfort Road N.W. and 16 Avenue N.W. through the project limits from 9 a.m. to 3 p.m. until further notice. For more information on this project, visit the project page.</li>
</ul>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/16-Avenue-Home-Road-NW-Upgrades.aspx"><strong>16 Avenue and Home Road N.W. Upgrades</strong></a></p>

<ul>
<li>Please note that the following lane closures are in effect until the end of September
<ul>
<li>Monday to Friday from 9 a.m. &ndash; 3 p.m.: The right-hand lane will be closed in each direction.</li>
<li>Saturdays from 7 a.m. &ndash; 5 p.m.: The right-hand lane will be closed in each direction</li>
</ul>
</li>
<li>To avoid delays please consider using Bowness Road N.W. as an alternate route to bypass the construction area</li>
</ul>

<p>Southeast</p>

<p><strong>NEW:</strong> Reduced lanes at 1707 44 Street S.E. beginning Thursday, September 28 at 6 a.m. until Saturday, September 30 at 6:30 p.m. Two way traffic will be set up on east side. This closure accommodates water services.</p>

<p>Road closure on 7 Avenue S.E. between 5 Street and 6 Street S.E. beginning Monday, September 25 at 7 a.m. until Friday, October 6 at 7 p.m. Drivers are advised to use alternate routes. This closure accommodates a service tie-in.</p>

<p>Macleod Trail will have reduced lanes at Southland Drive S.E. starting at 9 a.m. on Wednesday, September 20.</p>

<ul>
<li>During the morning peak hours, there will be a traffic pattern change on Macleod Trail at Southland Drive S.E. (5 a.m. to 9 a.m.).</li>
<li>There will be no left turn for at Southland Drive for traffic travelling in either direction of Macleod Trail at Southland Drive S.E.</li>
<li>Motorists wishing to turn left onto Southland Drive at Macleod Trail are advised to use alternate routes of Heritage Drive or Anderson Road S.E.</li>
<li>During this closure, motorists are advised to expect delays in the area, watch for workers in the construction zone, and use alternate routes when possible. This work will continue through 9 p.m. on Saturday, October 7 and accommodates valve install on the water main in the work area.</li>
</ul>

<p>Reduced lanes westbound on 114 Avenue S.E. between 24 Street and 29 Street S.E. beginning Friday, September 15 until Friday, October 6 daily from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Road closure on eastbound 3 Avenue S.E. between Centre Street and 1 Street S.E. beginning Monday, September 18 at 7 a.m. until Thursday, September 28 at 7 p.m. Use alternate routes and expect delays. This closure is to accommodate curb and sidewalk replacement.</p>

<p>Road closure on Confluence Way S.E. between 6 Avenue and Riverfront Avenue S.E. beginning Monday, September 18 at 7 a.m. until Thursday, September 28 at 7 p.m. Use alternate routes and expect delays. This closure is to accommodate service tie in.</p>

<p>Reduced lanes on 114 Avenue S.E. and 29 Street S.E. originally scheduled for completion Thursday, August 24 has been extended until Thursday, September 28 daily from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Reduced lanes on 18 Street S.E. north of Douglas Glen Boulevard S.E. beginning Friday, September 1 until Friday, November 3 daily weekdays from 9 a.m. to 6 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Reduced lane northbound on 18 Street S.E. between Riverglen Drive S.E. and Riverbirch Crescent S.E. beginning on Monday, August 14 to Monday, November 6 weekdays only from 9 a.m. to 6 p.m. Closure is to accommodate construction.</p>

<p>Reduced lane eastbound on 17 Avenue S.E. between 19 Street S.E. and Deerfoot Trail S.E. on Cushing Bridge beginning on Thursday, August 10 at 7 a.m. to Tuesday, October 31 at 7 p.m. Speeds will be reduced to 50 km/h through the work area. Flagman will be onsite to direct traffic. Closure is to accommodate construction.</p>

<p>Southwest</p>

<p>Road closure on 70 Avenue S.W. between Macleod Trail South and 4A Street S.W. on Saturday, September 23 and Saturday, September 30 from 7 a.m. to 5 p.m. These closures accommodate crane lifts.</p>

<p>Road closure on 17 Avenue S.W. between 4 Street and 5 Street S.W. beginning Wednesday, September 20 at 7 a.m. until Sunday, October 15 at 7 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Various road closures on 2 Street S.W. between 25 Avenue and 26 Avenue S.W. from 6:30 a.m. to 6:30 p.m. beginning on Monday, September 18. During this closure, motorists are advised to expect delays in the area, and use alternate routes when possible. This closure remains in place until 6:30 p.m. on Saturday, September 30 and accommodates water utility upgrades.</p>

<p>Road closure on 17 Avenue S.W. between 1 Street S.E. and 2 Street S.E. with closure on 1 Street S.W. between 15 Avenue S.W. and 17 Avenue S.W. beginning on Saturday, August 5 at 7 a.m. to Sunday, October 1 at 7 p.m. Restricted parking will also be in place on 17 Avenue S.E. with vehicle detours indicated via signage. Closures are to accommodate construction.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Avenue-S-reconstruction.aspx"><strong>17 Avenue S. reconstruction project</strong></a></p>

<ul>
<li>Reduced lanes westbound on 17 Avenue S.E. between 1 Street S.E. and Macleod Trail S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Reduced lanes westbound on 17 Avenue S.E. between Centre Street S.E. and 1 Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Road closure on 17 Avenue S.E. between 1 Street S.W. and Centre Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Access will be open to local traffic only. Vehicle detours will be indicated via signage.</li>
<li>For more information, visit the <a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Ave-SW-construction-schedule.aspx">construction schedule page</a>.</li>
</ul>

<p>Alberta Transportation</p>

<p>Alberta Transportation maintains Deerfoot Trail (Hwy.2) and Stoney Trail (Hwy. 201). For more information on work happening on these roads visit <a href="http://www.transportation.alberta.ca/">Alberta Transportation&rsquo;s website.</a></p>

<p>Southwest Ring Road Project</p>

<p>24 Street S.W. is permanently closed north of Highway 22x as part of the SWRR construction project. For more information on work happening, visit <a href="http://www.swcrrproject.com/traffic-updates/">http://www.swcrrproject.com/traffic-updates/</a></p>]]></description><category><![CDATA[Transportation,road closures]]></category>
            <pubDate>Wed, 27 Sep 2017 15:35:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Calgary road closures - September 26, 2017</title>
                        <link>https://newsroom.calgary.ca/calgary-road-closures---september-26-2017/</link>
                        <guid>https://newsroom.calgary.ca/calgary-road-closures---september-26-2017/</guid><pp:caseid>232734</pp:caseid><description><![CDATA[<p>Calgary road closures &ndash; September 26, 2017</p>

<p>This press release is aimed at informing 911 and the media of major road closures and lane restrictions. For information on closures in your area, visit Calgary.ca/trafficinfo. Find up to the minute road closure information on the Transportation Twitter account (@yyctransport).</p>

<p>Northeast</p>

<p><strong>NEW:</strong> Reduced lanes eastbound on Memorial Drive N.E. between 9 Street and 12 Street N.E. beginning Wednesday, September 27 until Friday, September 29 daily from 7 a.m. to 3 p.m. This closure accommodates transportation infrastructure.</p>

<p>Road closure on Regal Crescent N.E. and Russet Road N.E. beginning Friday, September 22 at 6 p.m. until Friday, September 29 at 8 p.m. This closure accommodates sanitary line/storm replacement.</p>

<p>Reduced lanes on Country Hills Boulevard N.E. and Barlow Trail N.E. beginning Monday, September 25 until Friday, September 29 daily from 9 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Northwest</p>

<p>Reduced lanes and partial sidewalk closure on east side of 10 Street N.W. and Kensington Road N.W. starting Tuesday, September 26 until Friday, September 29 daily from 8 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Road closure on 60 Street N.W. between Bowness Road N.W. and Bow Crescent N.W. starting Monday, September 25 at 8 a.m. until Monday, October 2 at 7 p.m. This closure accommodates catch basin installation.</p>

<p>Reduced lanes westbound and eastbound on 16 Avenue and Home Road N.W. beginning Monday, September 11 until Saturday, September 30 daily weekdays from 9 a.m. to 3 p.m. and Saturdays from 7 a.m. to 5 p.m. This closure accommodates construction.</p>

<p>16 Avenue N.W. at 29 Street N.W. / Uxbridge Drive N.W. will see various lane closures until the end of October, 2017 as part of an intersection improvement project.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/TransCanada-Highway-Sarcee-Trail-Interchange-Project.aspx"><strong>Trans Canada Highway / Sarcee Trail Interchange Improvements project</strong></a></p>

<ul>
<li>Daily lane reductions on Sarcee Trail N.W. at 16 Avenue N.W. from 9 a.m. to 3 p.m. through project limits to the end of October.</li>
</ul>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/Bowfort-Rd-Trans-Canada-Hwy-interchange.aspx"><strong>16 Ave NW / Bowfort Road Interchange Improvements</strong></a></p>

<ul>
<li>Daily lane reductions on Bowfort Road N.W. and 16 Avenue N.W. through the project limits from 9 a.m. to 3 p.m. until further notice. For more information on this project, visit the project page.</li>
</ul>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/16-Avenue-Home-Road-NW-Upgrades.aspx"><strong>16 Avenue and Home Road N.W. Upgrades</strong></a></p>

<ul>
<li>Please note that the following lane closures are in effect until the end of September
<ul>
<li>Monday to Friday from 9 a.m. &ndash; 3 p.m.: The right-hand lane will be closed in each direction.</li>
<li>Saturdays from 7 a.m. &ndash; 5 p.m.: The right-hand lane will be closed in each direction</li>
</ul>
</li>
<li>To avoid delays please consider using Bowness Road N.W. as an alternate route to bypass the construction area</li>
</ul>

<p>Southeast</p>

<p>Road closure on 7 Avenue S.E. between 5 Street and 6 Street S.E. beginning Monday, September 25 at 7 a.m. until Friday, October 6 at 7 p.m. Drivers are advised to use alternate routes. This closure accommodates a service tie-in.</p>

<p>Macleod Trail will have reduced lanes at Southland Drive S.E. starting at 9 a.m. on Wednesday, September 20.</p>

<ul>
<li>During the morning peak hours, there will be a traffic pattern change on Macleod Trail at Southland Drive S.E. (5 a.m. to 9 a.m.).</li>
<li>There will be no left turn for at Southland Drive for traffic travelling in either direction of Macleod Trail at Southland Drive S.E.</li>
<li>Motorists wishing to turn left onto Southland Drive at Macleod Trail are advised to use alternate routes of Heritage Drive or Anderson Road S.E.</li>
<li>During this closure, motorists are advised to expect delays in the area, watch for workers in the construction zone, and use alternate routes when possible. This work will continue through 9 p.m. on Saturday, October 7 and accommodates valve install on the water main in the work area.</li>
</ul>

<p>Reduced lanes westbound on 114 Avenue S.E. between 24 Street and 29 Street S.E. beginning Friday, September 15 until Friday, October 6 daily from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Road closure on eastbound 3 Avenue S.E. between Centre Street and 1 Street S.E. beginning Monday, September 18 at 7 a.m. until Thursday, September 28 at 7 p.m. Use alternate routes and expect delays. This closure is to accommodate curb and sidewalk replacement.</p>

<p>Road closure on Confluence Way S.E. between 6 Avenue and Riverfront Avenue S.E. beginning Monday, September 18 at 7 a.m. until Thursday, September 28 at 7 p.m. Use alternate routes and expect delays. This closure is to accommodate service tie in.</p>

<p>Reduced lanes on 114 Avenue S.E. and 29 Street S.E. originally scheduled for completion Thursday, August 24 has been extended until Thursday, September 28 daily from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Reduced lanes on 18 Street S.E. north of Douglas Glen Boulevard S.E. beginning Friday, September 1 until Friday, November 3 daily weekdays from 9 a.m. to 6 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Reduced lane northbound on 18 Street S.E. between Riverglen Drive S.E. and Riverbirch Crescent S.E. beginning on Monday, August 14 to Monday, November 6 weekdays only from 9 a.m. to 6 p.m. Closure is to accommodate construction.</p>

<p>Reduced lane eastbound on 17 Avenue S.E. between 19 Street S.E. and Deerfoot Trail S.E. on Cushing Bridge beginning on Thursday, August 10 at 7 a.m. to Tuesday, October 31 at 7 p.m. Speeds will be reduced to 50 km/h through the work area. Flagman will be onsite to direct traffic. Closure is to accommodate construction.</p>

<p>Southwest</p>

<p><strong>NEW:</strong> Road closures on 30 Avenue S.W. between 4 Street and Rideau Road S.W. as well as on 5a Street S.W. between Rideau Road and 30 Avenue S.W. on Wednesday, September 27 from 8 a.m. to 6 p.m. These closures accommodate paving.</p>

<p>Road closure on 6 Avenue S.W. west of 11 Street S.W. beginning on Tuesday, September 26 at 10 p.m. Wednesday, September 27 at 5 a.m. This closure accommodates overhead sign removal.</p>

<p>Road closure on 70 Avenue S.W. between Macleod Trail South and 4A Street S.W. on Saturday, September 23 and Saturday, September 30 from 7 a.m. to 5 p.m. These closures accommodate crane lifts.</p>

<p>Road closure on 26 Avenue S.W. between 1 Street S.W. and 4 Street S.W. starting Wednesday, September 20 at 9 a.m. until Wednesday, September 27 at 7 p.m. This closure accommodates underground water main work.</p>

<p>Road closure on 17 Avenue S.W. between 4 Street and 5 Street S.W. beginning Wednesday, September 20 at 7 a.m. until Sunday, October 15 at 7 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Various road closures on 2 Street S.W. between 25 Avenue and 26 Avenue S.W. from 6:30 a.m. to 6:30 p.m. beginning on Monday, September 18. During this closure, motorists are advised to expect delays in the area, and use alternate routes when possible. This closure remains in place until 6:30 p.m. on Saturday, September 30 and accommodates water utility upgrades.</p>

<p>Road closure on 17 Avenue S.W. between 1 Street S.E. and 2 Street S.E. with closure on 1 Street S.W. between 15 Avenue S.W. and 17 Avenue S.W. beginning on Saturday, August 5 at 7 a.m. to Sunday, October 1 at 7 p.m. Restricted parking will also be in place on 17 Avenue S.E. with vehicle detours indicated via signage. Closures are to accommodate construction.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Avenue-S-reconstruction.aspx"><strong>17 Avenue S. reconstruction project</strong></a></p>

<ul>
<li>Reduced lanes westbound on 17 Avenue S.E. between 1 Street S.E. and Macleod Trail S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Reduced lanes westbound on 17 Avenue S.E. between Centre Street S.E. and 1 Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Road closure on 17 Avenue S.E. between 1 Street S.W. and Centre Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Access will be open to local traffic only. Vehicle detours will be indicated via signage.</li>
<li>For more information, visit the <a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Ave-SW-construction-schedule.aspx">construction schedule page</a>.</li>
</ul>

<p>Alberta Transportation</p>

<p>Alberta Transportation maintains Deerfoot Trail (Hwy.2) and Stoney Trail (Hwy. 201). For more information on work happening on these roads visit <a href="http://www.transportation.alberta.ca/">Alberta Transportation&rsquo;s website.</a></p>

<p>Southwest Ring Road Project</p>

<p>24 Street S.W. is permanently closed north of Highway 22x as part of the SWRR construction project. For more information on work happening, visit <a href="http://www.swcrrproject.com/traffic-updates/">http://www.swcrrproject.com/traffic-updates/</a></p>]]></description><category><![CDATA[Transportation,road closures]]></category>
            <pubDate>Tue, 26 Sep 2017 15:35:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Calgary road closures - September 25, 2017</title>
                        <link>https://newsroom.calgary.ca/calgary-road-closures---september-25-2017/</link>
                        <guid>https://newsroom.calgary.ca/calgary-road-closures---september-25-2017/</guid><pp:caseid>232562</pp:caseid><description><![CDATA[<p>Calgary road closures &ndash; September 25, 2017</p>

<p>This press release is aimed at informing 911 and the media of major road closures and lane restrictions. For information on closures in your area, visit Calgary.ca/trafficinfo. Find up to the minute road closure information on the Transportation Twitter account (@yyctransport).</p>

<p>Northeast</p>

<p>Road closure on Regal Crescent N.E. and Russet Road N.E. beginning Friday, September 22 at 6 p.m. until Friday, September 29 at 8 p.m. This closure accommodates sanitary line/storm replacement.</p>

<p>Reduced lanes on Country Hills Boulevard N.E. and Barlow Trail N.E. beginning Monday, September 25 until Friday, September 29 daily from 9 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Northwest</p>

<p><strong>NEW:</strong> Reduced lanes and partial sidewalk closure on east side of 10 Street N.W. and Kensington Road N.W. starting Tuesday, September 26 until Friday, September 29 daily from 8 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Road closure on 60 Street N.W. between Bowness Road N.W. and Bow Crescent N.W. starting Monday, September 25 at 8 a.m. until Monday, October 2 at 7 p.m. This closure accommodates catch basin installation.</p>

<p>Reduced lanes southbound at 305 10 Street N.W. beginning Thursday, September 21 until Tuesday, September 26 daily weekdays only from 9 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Reduced lanes westbound and eastbound on 16 Avenue and Home Road N.W. beginning Monday, September 11 until Saturday, September 30 daily weekdays from 9 a.m. to 3 p.m. and Saturdays from 7 a.m. to 5 p.m. This closure accommodates construction.</p>

<p>16 Avenue N.W. at 29 Street N.W. / Uxbridge Drive N.W. will see various lane closures until the end of October, 2017 as part of an intersection improvement project.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/TransCanada-Highway-Sarcee-Trail-Interchange-Project.aspx"><strong>Trans Canada Highway / Sarcee Trail Interchange Improvements project</strong></a></p>

<ul>
<li>Daily lane reductions on Sarcee Trail N.W. at 16 Avenue N.W. from 9 a.m. to 3 p.m. through project limits to the end of October.</li>
</ul>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/Bowfort-Rd-Trans-Canada-Hwy-interchange.aspx"><strong>16 Ave NW / Bowfort Road Interchange Improvements</strong></a></p>

<ul>
<li>Daily lane reductions on Bowfort Road N.W. and 16 Avenue N.W. through the project limits from 9 a.m. to 3 p.m. until further notice. For more information on this project, visit the project page.</li>
</ul>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/16-Avenue-Home-Road-NW-Upgrades.aspx"><strong>16 Avenue and Home Road N.W. Upgrades</strong></a></p>

<ul>
<li>Please note that the following lane closures are in effect until the end of September
<ul>
<li>Monday to Friday from 9 a.m. &ndash; 3 p.m.: The right-hand lane will be closed in each direction.</li>
<li>Saturdays from 7 a.m. &ndash; 5 p.m.: The right-hand lane will be closed in each direction</li>
</ul>
</li>
<li>To avoid delays please consider using Bowness Road N.W. as an alternate route to bypass the construction area</li>
</ul>

<p>Southeast</p>

<p>Reduced lanes on Heritage Drive S.E. and 79 Street S.E. beginning Monday, September 25 until Tuesday, September 26 daily from 9 a.m. to 3 p.m. This closure accommodates traffic signal work.</p>

<p>Road closure on 7 Avenue S.E. between 5 Street and 6 Street S.E. beginning Monday, September 25 at 7 a.m. until Friday, October 6 at 7 p.m. Drivers are advised to use alternate routes. This closure accommodates a service tie-in.</p>

<p>Macleod Trail will have reduced lanes at Southland Drive S.E. starting at 9 a.m. on Wednesday, September 20.</p>

<ul>
<li>During the morning peak hours, there will be a traffic pattern change on Macleod Trail at Southland Drive S.E. (5 a.m. to 9 a.m.).</li>
<li>There will be no left turn for at Southland Drive for traffic travelling in either direction of Macleod Trail at Southland Drive S.E.</li>
<li>Motorists wishing to turn left onto Southland Drive at Macleod Trail are advised to use alternate routes of Heritage Drive or Anderson Road S.E.</li>
<li>During this closure, motorists are advised to expect delays in the area, watch for workers in the construction zone, and use alternate routes when possible. This work will continue through 9 p.m. on Saturday, October 7 and accommodates valve install on the water main in the work area.</li>
</ul>

<p>Reduced lanes westbound on 114 Avenue S.E. between 24 Street and 29 Street S.E. beginning Friday, September 15 until Friday, October 6 daily from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Road closure on eastbound 3 Avenue S.E. between Centre Street and 1 Street S.E. beginning Monday, September 18 at 7 a.m. until Thursday, September 28 at 7 p.m. Use alternate routes and expect delays. This closure is to accommodate curb and sidewalk replacement.</p>

<p>Road closure on Confluence Way S.E. between 6 Avenue and Riverfront Avenue S.E. beginning Monday, September 18 at 7 a.m. until Thursday, September 28 at 7 p.m. Use alternate routes and expect delays. This closure is to accommodate service tie in.</p>

<p>Reduced lanes on 114 Avenue S.E. and 29 Street S.E. originally scheduled for completion Thursday, August 24 has been extended until Thursday, September 28 daily from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Reduced lanes on 18 Street S.E. north of Douglas Glen Boulevard S.E. beginning Friday, September 1 until Friday, November 3 daily weekdays from 9 a.m. to 6 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Reduced lane northbound on 18 Street S.E. between Riverglen Drive S.E. and Riverbirch Crescent S.E. beginning on Monday, August 14 to Monday, November 6 weekdays only from 9 a.m. to 6 p.m. Closure is to accommodate construction.</p>

<p>Reduced lane eastbound on 17 Avenue S.E. between 19 Street S.E. and Deerfoot Trail S.E. on Cushing Bridge beginning on Thursday, August 10 at 7 a.m. to Tuesday, October 31 at 7 p.m. Speeds will be reduced to 50 km/h through the work area. Flagman will be onsite to direct traffic. Closure is to accommodate construction.</p>

<p>Southwest</p>

<p><strong>NEW:</strong> Road closure on 6 Avenue S.W. west of 11 Street S.W. beginning on Tuesday, September 26 at 10 p.m. Wednesday, September 27 at 5 a.m. This closure accommodates overhead sign removal.</p>

<p>Road closure on 70 Avenue S.W. between Macleod Trail South and 4A Street S.W. on Saturday, September 23 and Saturday, September 30 from 7 a.m. to 5 p.m. These closures accommodate crane lifts.</p>

<p>Road closure on 26 Avenue S.W. between 1 Street S.W. and 4 Street S.W. starting Wednesday, September 20 at 9 a.m. until Wednesday, September 27 at 7 p.m. This closure accommodates underground water main work.</p>

<p>Road closure on 17 Avenue S.W. between 4 Street and 5 Street S.W. beginning Wednesday, September 20 at 7 a.m. until Sunday, October 15 at 7 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Various road closures on 2 Street S.W. between 25 Avenue and 26 Avenue S.W. from 6:30 a.m. to 6:30 p.m. beginning on Monday, September 18. During this closure, motorists are advised to expect delays in the area, and use alternate routes when possible. This closure remains in place until 6:30 p.m. on Saturday, September 30 and accommodates water utility upgrades.</p>

<p>Road closure on 17 Avenue S.W. between 1 Street S.E. and 2 Street S.E. with closure on 1 Street S.W. between 15 Avenue S.W. and 17 Avenue S.W. beginning on Saturday, August 5 at 7 a.m. to Sunday, October 1 at 7 p.m. Restricted parking will also be in place on 17 Avenue S.E. with vehicle detours indicated via signage. Closures are to accommodate construction.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Avenue-S-reconstruction.aspx"><strong>17 Avenue S. reconstruction project</strong></a></p>

<ul>
<li>Reduced lanes westbound on 17 Avenue S.E. between 1 Street S.E. and Macleod Trail S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Reduced lanes westbound on 17 Avenue S.E. between Centre Street S.E. and 1 Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Road closure on 17 Avenue S.E. between 1 Street S.W. and Centre Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Access will be open to local traffic only. Vehicle detours will be indicated via signage.</li>
<li>For more information, visit the <a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Ave-SW-construction-schedule.aspx">construction schedule page</a>.</li>
</ul>

<p>Alberta Transportation</p>

<p>Alberta Transportation maintains Deerfoot Trail (Hwy.2) and Stoney Trail (Hwy. 201). For more information on work happening on these roads visit <a href="http://www.transportation.alberta.ca/">Alberta Transportation&rsquo;s website.</a></p>

<p>Southwest Ring Road Project</p>

<p>24 Street S.W. is permanently closed north of Highway 22x as part of the SWRR construction project. For more information on work happening, visit <a href="http://www.swcrrproject.com/traffic-updates/">http://www.swcrrproject.com/traffic-updates/</a></p>]]></description><category><![CDATA[Transportation,road closures]]></category>
            <pubDate>Mon, 25 Sep 2017 15:35:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Calgary road closures - September 22, 2017</title>
                        <link>https://newsroom.calgary.ca/calgary-road-closures---september-22-2017/</link>
                        <guid>https://newsroom.calgary.ca/calgary-road-closures---september-22-2017/</guid><pp:caseid>232390</pp:caseid><description><![CDATA[<p>Calgary road closures &ndash; September 21, 2017</p>

<p>This press release is aimed at informing 911 and the media of major road closures and lane restrictions. For information on closures in your area, visit Calgary.ca/trafficinfo. Find up to the minute road closure information on the Transportation Twitter account (@yyctransport).</p>

<p>Northeast</p>

<p>Reduced lanes at 343 41 Street N.E. beginning Friday, September 22 at 9 a.m. until Saturday, September 23 at 6:30 p.m. Two-way traffic on north side of road. This closure accommodates water services.</p>

<p>Road closure on Regal Crescent N.E. and Russet Road N.E. beginning Friday, September 22 at 6 p.m. until Friday, September 29 at 8 p.m. This closure accommodates sanitary line/storm replacement.</p>

<p>Reduced lanes on Memorial Drive N.E. at both the Zoo C-train station and Barlow C-train station beginning Friday, September 22 at 10 p.m. until Monday, September 25 at 4 a.m. These closures accommodate train maintenance.</p>

<p>Road closure on 36 Street N.E. between 5 Avenue and 8 Avenue N.E. &ndash; along with the closures of the 5 Avenue and 8 Avenue N.E. intersections - starting Friday, September 22 at 10 p.m. until Monday, September 25 at 4 a.m. These closures accommodate track maintenance.</p>

<p>Reduced lanes on Barlow Trailer N.E. and Freeport Boulevard N.E. beginning Saturday, September 23 until Monday, September 25 daily from 7 a.m. to 7 p.m. This closure accommodates construction.</p>

<p>Road closure on southbound Metis Trail N.E. between 104 and 80 Avenue N.E. on Monday, September 25 from 10 a.m. to 2 p.m. This closure accommodates construction.</p>

<p>Reduced lanes on Country Hills Boulevard N.E. and Barlow Trail N.E. beginning Monday, September 25 until Friday, September 29 daily from 9 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Reduced lanes at 1319 Edmonton Trail N.E. beginning Thursday, September 21 until Saturday, September 23 daily weekdays from 9 a.m. to 3 p.m. and Saturday from 7 a.m. to 7 p.m. This closure accommodates construction.</p>

<p>Northwest</p>

<p><strong>NEW:</strong> Road closure at 6317 Centre Street N.W. beginning ASAP until Sunday, September 24 at 6:30 p.m. Two way traffic will be set up on west-side. This closure accommodates a water emergency.</p>

<p><strong>NEW:</strong> Road closure on 60 Street N.W. between Bowness Road N.W. and Bow Crescent N.W. starting Monday, September 25 at 8 a.m. until Monday, October 2 at 7 p.m. This closure accommodates catch basin installation.</p>

<p><strong>NEW:</strong> Road closure on Charleswood Drive N.W. between John Laurie Boulevard and Northmount Drive N.W. on Sunday, September 24 from 4 a.m. to 7 p.m. Police and detour crews will on site to control traffic. This closure accommodates paving.</p>

<p>Reduced lanes on Northmount Drive N.W. between 52 Avenue N.W. and the mall entrance to the south beginning Friday, September 22 at 9 a.m. until Monday, September 25 at 5 a.m. This closure accommodates underground utility work.</p>

<p>Road closure on 20 Avenue N.W. between 15 Street and 16 Street N.W. starting Saturday, September 23 at 5 a.m. until Monday, September 25 at 5 a.m. This closure accommodates construction work.</p>

<p>Reduced lanes and sidewalk closure westbound on Memorial Drive N.W. and 10A Street N.W. on Monday, September 25 from 9 a.m. until 11 a.m. This closure accommodates construction.</p>

<p>Reduced lanes on 17 Avenue N.W. between 7 Street and 8 Street N.W. on Monday, September 25 from 7 a.m. to 5 p.m. This closure accommodates construction.</p>

<p>Reduced lanes southbound at 305 10 Street N.W. beginning Thursday, September 21 until Tuesday, September 26 daily weekdays only from 9 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Reduced lanes and sidewalk closure on eastbound 16 Avenue N.W. east of 12 Street N.W. in the bus lane beginning Monday, September 11 at 9 a.m. until Monday, September 25 at 3 p.m. This closure accommodates construction.</p>

<p>Reduced lanes westbound and eastbound on 16 Avenue and Home Road N.W. beginning Monday, September 11 until Saturday, September 30 daily weekdays from 9 a.m. to 3 p.m. and Saturdays from 7 a.m. to 5 p.m. This closure accommodates construction.</p>

<p>16 Avenue N.W. at 29 Street N.W. / Uxbridge Drive N.W. will see various lane closures until the end of October, 2017 as part of an intersection improvement project.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/TransCanada-Highway-Sarcee-Trail-Interchange-Project.aspx"><strong>Trans Canada Highway / Sarcee Trail Interchange Improvements project</strong></a></p>

<ul>
<li>Daily lane reductions on Sarcee Trail N.W. at 16 Avenue N.W. from 9 a.m. to 3 p.m. through project limits to the end of October.</li>
</ul>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/Bowfort-Rd-Trans-Canada-Hwy-interchange.aspx"><strong>16 Ave NW / Bowfort Road Interchange Improvements</strong></a></p>

<ul>
<li>Daily lane reductions on Bowfort Road N.W. and 16 Avenue N.W. through the project limits from 9 a.m. to 3 p.m. until further notice. For more information on this project, visit the project page.</li>
</ul>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/16-Avenue-Home-Road-NW-Upgrades.aspx"><strong>16 Avenue and Home Road N.W. Upgrades</strong></a></p>

<ul>
<li>Please note that the following lane closures are in effect until the end of September
<ul>
<li>Monday to Friday from 9 a.m. &ndash; 3 p.m.: The right-hand lane will be closed in each direction.</li>
<li>Saturdays from 7 a.m. &ndash; 5 p.m.: The right-hand lane will be closed in each direction</li>
</ul>
</li>
<li>To avoid delays please consider using Bowness Road N.W. as an alternate route to bypass the construction area</li>
</ul>

<p>Southeast</p>

<p>Reduced lanes on 17 Avenue S.E. between 47 Street and Hubalta Road S.E. on Saturday, September 23 from 9 a.m. to 4 p.m. This closure accommodates transportation infrastructure.</p>

<p>Reduced lanes northbound at 3020 Ogden Road S.E. beginning Saturday, September 23 until Sunday, September 24 from 8 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Reduced lanes on Memorial Drive S.E. and 28 Street S.E. starting Saturday, September 23 at 7 a.m. until Sunday, September 24 at 7 p.m. This closure accommodates train maintenance.</p>

<p>Reduced lanes on Heritage Drive S.E. and 79 Street S.E. beginning Monday, September 25 until Tuesday, September 26 daily from 9 a.m. to 3 p.m. This closure accommodates traffic signal work.</p>

<p>Reduced lanes on 17 Avenue S.E. between 26 Street and 28 Street S.E. on Monday, September 25 from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure.</p>

<p>Road closure on 7 Avenue S.E. between 5 Street and 6 Street S.E. beginning Monday, September 25 at 7 a.m. until Friday, October 6 at 7 p.m. Drivers are advised to use alternate routes. This closure accommodates a service tie-in.</p>

<p>Macleod Trail will have reduced lanes at Southland Drive S.E. starting at 9 a.m. on Wednesday, September 20.</p>

<ul>
<li>During the morning peak hours, there will be a traffic pattern change on Macleod Trail at Southland Drive S.E. (5 a.m. to 9 a.m.).</li>
<li>There will be no left turn for at Southland Drive for traffic travelling in either direction of Macleod Trail at Southland Drive S.E.</li>
<li>Motorists wishing to turn left onto Southland Drive at Macleod Trail are advised to use alternate routes of Heritage Drive or Anderson Road S.E.</li>
<li>During this closure, motorists are advised to expect delays in the area, watch for workers in the construction zone, and use alternate routes when possible. This work will continue through 9 p.m. on Saturday, October 7 and accommodates valve install on the water main in the work area.</li>
</ul>

<p>Reduced lanes westbound on 114 Avenue S.E. between 24 Street and 29 Street S.E. beginning Friday, September 15 until Friday, October 6 daily from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Road closure on eastbound 3 Avenue S.E. between Centre Street and 1 Street S.E. beginning Monday, September 18 at 7 a.m. until Thursday, September 28 at 7 p.m. Use alternate routes and expect delays. This closure is to accommodate curb and sidewalk replacement.</p>

<p>Road closure on Confluence Way S.E. between 6 Avenue and Riverfront Avenue S.E. beginning Monday, September 18 at 7 a.m. until Thursday, September 28 at 7 p.m. Use alternate routes and expect delays. This closure is to accommodate service tie in.</p>

<p>Reduced lanes on 114 Avenue S.E. and 29 Street S.E. originally scheduled for completion Thursday, August 24 has been extended until Thursday, September 28 daily from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Reduced lanes on 18 Street S.E. north of Douglas Glen Boulevard S.E. beginning Friday, September 1 until Friday, November 3 daily weekdays from 9 a.m. to 6 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Reduced lane northbound on 18 Street S.E. between Riverglen Drive S.E. and Riverbirch Crescent S.E. beginning on Monday, August 14 to Monday, November 6 weekdays only from 9 a.m. to 6 p.m. Closure is to accommodate construction.</p>

<p>Reduced lane eastbound on 17 Avenue S.E. between 19 Street S.E. and Deerfoot Trail S.E. on Cushing Bridge beginning on Thursday, August 10 at 7 a.m. to Tuesday, October 31 at 7 p.m. Speeds will be reduced to 50 km/h through the work area. Flagman will be onsite to direct traffic. Closure is to accommodate construction.</p>

<p>Southwest</p>

<p>Road closure southbound on 11 Street S.W. between 8 Avenue S.W. and 9 Avenue S.W. beginning Saturday, September 23 at 6 a.m. until Sunday, September 24 at 5 p.m. Motorists are advised to use the southbound 14 Street S.W. ramp to 9 Avenue S.W. as a detour. This closure accommodates underground utility work.</p>

<p>Road closure on 70 Avenue S.W. between Macleod Trail South and 4A Street S.W. on Saturday, September 23 and Saturday, September 30 from 7 a.m. to 5 p.m. These closures accommodate crane lifts.</p>

<p>Road closure on 26 Avenue S.W. between 1 Street S.W. and 4 Street S.W. starting Wednesday, September 20 at 9 a.m. until Wednesday, September 27 at 7 p.m. This closure accommodates underground water main work.</p>

<p>Road closure on 17 Avenue S.W. between 4 Street and 5 Street S.W. beginning Wednesday, September 20 at 7 a.m. until Sunday, October 15 at 7 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Various road closures on 2 Street S.W. between 25 Avenue and 26 Avenue S.W. from 6:30 a.m. to 6:30 p.m. beginning on Monday, September 18. During this closure, motorists are advised to expect delays in the area, and use alternate routes when possible. This closure remains in place until 6:30 p.m. on Saturday, September 30 and accommodates water utility upgrades.</p>

<p>Reduced lanes on 17 Avenue S.W. between 2 Street and 4 Street S.W. beginning Tuesday, September 5 at 7 a.m. until Thursday, September 21 at 7 a.m. This closure accommodates transportation infrastructure work.</p>

<p>Road closure on 17 Avenue S.W. between 1 Street S.E. and 2 Street S.E. with closure on 1 Street S.W. between 15 Avenue S.W. and 17 Avenue S.W. beginning on Saturday, August 5 at 7 a.m. to Sunday, October 1 at 7 p.m. Restricted parking will also be in place on 17 Avenue S.E. with vehicle detours indicated via signage. Closures are to accommodate construction.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Avenue-S-reconstruction.aspx"><strong>17 Avenue S. reconstruction project</strong></a></p>

<ul>
<li>Reduced lanes westbound on 17 Avenue S.E. between 1 Street S.E. and Macleod Trail S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Reduced lanes westbound on 17 Avenue S.E. between Centre Street S.E. and 1 Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Road closure on 17 Avenue S.E. between 1 Street S.W. and Centre Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Access will be open to local traffic only. Vehicle detours will be indicated via signage.</li>
<li>For more information, visit the <a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Ave-SW-construction-schedule.aspx">construction schedule page</a>.</li>
</ul>

<p>Alberta Transportation</p>

<p>Alberta Transportation maintains Deerfoot Trail (Hwy.2) and Stoney Trail (Hwy. 201). For more information on work happening on these roads visit <a href="http://www.transportation.alberta.ca/">Alberta Transportation&rsquo;s website.</a></p>

<p>Southwest Ring Road Project</p>

<p>24 Street S.W. is permanently closed north of Highway 22x as part of the SWRR construction project. For more information on work happening, visit <a href="http://www.swcrrproject.com/traffic-updates/">http://www.swcrrproject.com/traffic-updates/</a></p>]]></description><category><![CDATA[Transportation,road closures]]></category>
            <pubDate>Fri, 22 Sep 2017 15:35:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Calgary road closures - September 21, 2017</title>
                        <link>https://newsroom.calgary.ca/calgary-road-closures---september-21-2017/</link>
                        <guid>https://newsroom.calgary.ca/calgary-road-closures---september-21-2017/</guid><pp:caseid>232246</pp:caseid><description><![CDATA[<p>Calgary road closures &ndash; September 21, 2017</p>

<p>This press release is aimed at informing 911 and the media of major road closures and lane restrictions. For information on closures in your area, visit Calgary.ca/trafficinfo. Find up to the minute road closure information on the Transportation Twitter account (@yyctransport).</p>

<p>Northeast</p>

<p><strong>NEW:</strong> Reduced lanes at 343 41 Street N.E. beginning Friday, September 22 at 9 a.m. until Saturday, September 23 at 6:30 p.m. Two-way traffic on north side of road. This closure accommodates water services.</p>

<p><strong>NEW:</strong> Road closure on Regal Crescent N.E. and Russet Road N.E. beginning Friday, September 22 at 6 p.m. until Friday, September 29 at 8 p.m. This closure accommodates sanitary line/storm replacement.</p>

<p><strong>NEW:</strong> Reduced lanes on Memorial Drive N.E. at both the Zoo C-train station and Barlow C-train station beginning Friday, September 22 at 10 p.m. until Monday, September 25 at 4 a.m. These closures accommodate train maintenance.</p>

<p><strong>NEW:</strong> Road closure on 36 Street N.E. between 5 Avenue and 8 Avenue N.E. &ndash; along with the closures of the 5 Avenue and 8 Avenue N.E. intersections - starting Friday, September 22 at 10 p.m. until Monday, September 25 at 4 a.m. These closures accommodate track maintenance.</p>

<p><strong>NEW:</strong> Reduced lanes on Barlow Trailer N.E. and Freeport Boulevard N.E. beginning Saturday, September 23 until Monday, September 25 daily from 7 a.m. to 7 p.m. This closure accommodates construction.</p>

<p><strong>NEW:</strong> Road closure on southbound Metis Trail N.E. between 104 and 80 Avenue N.E. on Monday, September 25 from 10 a.m. to 2 p.m. This closure accommodates construction.</p>

<p><strong>NEW:</strong> Reduced lanes on Country Hills Boulevard N.E. and Barlow Trail N.E. beginning Monday, September 25 until Friday, September 29 daily from 9 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Reduced lanes on Barlow Trail and 100 Avenue N.E. beginning Thursday, September 21 until Friday, September 22 daily from 7 a.m. to 7 p.m. This closure accommodates construction.</p>

<p>Reduced lanes at 1319 Edmonton Trail N.E. beginning Thursday, September 21 until Saturday, September 23 daily weekdays from 9 a.m. to 3 p.m. and Saturday from 7 a.m. to 7 p.m. This closure accommodates construction.</p>

<p>Reduced lanes on Memorial Drive and 4 Street N.E. starting Tuesday, September 19 from 12 p.m. to 3 p.m. and continuing from Wednesday, September 20 to Friday, September 22 daily from 9 a.m. to 3 p.m. This closure accommodates construction work.</p>

<p>Reduced lanes on 36 Street N.E. between 88 Avenue and 80 Avenue N.E. starting Wednesday, September 20 until Friday, September 22 daily from 7 a.m. to 4 p.m. This closure accommodates construction.</p>

<p>Reduced lanes On Country Hills Boulevard N.E. between Metis Trail and 52 Street N.E. starting Wednesday, September 13 until Friday, September 22 weekdays from 9 a.m. to 8 p.m., Saturdays from 7 a.m. to 7 p.m. and Sundays from 9 a.m. to 7 p.m. This closure accommodates construction work.</p>

<p>Northwest</p>

<p><strong>NEW:</strong> Reduced lanes and sidewalk closure northbound on Northmount Drive N.W. and Brisebois Drive N.W. on Friday, September 22 from 9 a.m. to 3 p.m. This closure accommodates construction.</p>

<p><strong>NEW:</strong> Reduced lanes on Northmount Drive N.W. between 52 Avenue N.W. and the mall entrance to the south beginning Friday, September 22 at 9 a.m. until Monday, September 25 at 5 a.m. This closure accommodates underground utility work.</p>

<p><strong>NEW:</strong> Road closure on 20 Avenue N.W. between 15 Street and 16 Street N.W. starting Saturday, September 23 at 5 a.m. until Monday, September 25 at 5 a.m. This closure accommodates construction work.</p>

<p><strong>NEW:</strong> Reduced lanes and sidewalk closure westbound on Memorial Drive N.W. and 10A Street N.W. on Monday, September 25 from 9 a.m. until 11 a.m. This closure accommodates construction.</p>

<p><strong>NEW:</strong> Reduced lanes on 17 Avenue N.W. between 7 Street and 8 Street N.W. on Monday, September 25 from 7 a.m. to 5 p.m. This closure accommodates construction.</p>

<p>Reduced lanes southbound at 305 10 Street N.W. beginning Thursday, September 21 until Tuesday, September 26 daily weekdays only from 9 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Reduced lanes on Crowfoot Way and Crowfoot Circle N.W. beginning Wednesday, September 20 until Friday, September 22 daily from 7 a.m. to 7 p.m. This closure accommodates utility work.</p>

<p>Road closure at 221 19 Avenue N.W. starting Wednesday, September 20 until Friday, September 22 daily from 9 a.m. to 7 p.m. This closure accommodates construction.</p>

<p>Reduced lanes and sidewalk closure on eastbound 16 Avenue N.W. east of 12 Street N.W. in the bus lane beginning Monday, September 11 at 9 a.m. until Monday, September 25 at 3 p.m. This closure accommodates construction.</p>

<p>Reduced lanes westbound and eastbound on 16 Avenue and Home Road N.W. beginning Monday, September 11 until Saturday, September 30 daily weekdays from 9 a.m. to 3 p.m. and Saturdays from 7 a.m. to 5 p.m. This closure accommodates construction.</p>

<p>16 Avenue N.W. at 29 Street N.W. / Uxbridge Drive N.W. will see various lane closures until the end of October, 2017 as part of an intersection improvement project.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/TransCanada-Highway-Sarcee-Trail-Interchange-Project.aspx"><strong>Trans Canada Highway / Sarcee Trail Interchange Improvements project</strong></a></p>

<ul>
<li>Daily lane reductions on Sarcee Trail N.W. at 16 Avenue N.W. from 9 a.m. to 3 p.m. through project limits to the end of October.</li>
</ul>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/Bowfort-Rd-Trans-Canada-Hwy-interchange.aspx"><strong>16 Ave NW / Bowfort Road Interchange Improvements</strong></a></p>

<ul>
<li>Daily lane reductions on Bowfort Road N.W. and 16 Avenue N.W. through the project limits from 9 a.m. to 3 p.m. until further notice. For more information on this project, visit the project page.</li>
</ul>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/16-Avenue-Home-Road-NW-Upgrades.aspx"><strong>16 Avenue and Home Road N.W. Upgrades</strong></a></p>

<ul>
<li>Please note that the following lane closures are in effect until the end of September
<ul>
<li>Monday to Friday from 9 a.m. &ndash; 3 p.m.: The right-hand lane will be closed in each direction.</li>
<li>Saturdays from 7 a.m. &ndash; 5 p.m.: The right-hand lane will be closed in each direction</li>
</ul>
</li>
<li>To avoid delays please consider using Bowness Road N.W. as an alternate route to bypass the construction area</li>
</ul>

<p>Southeast</p>

<p><strong>NEW:</strong> Reduced lanes on 17 Avenue S.E. between 47 Street and Hubalta Road S.E. on Saturday, September 23 from 9 a.m. to 4 p.m. This closure accommodates transportation infrastructure.</p>

<p><strong>NEW:</strong> Reduced lanes northbound at 3020 Ogden Road S.E. beginning Saturday, September 23 until Sunday, September 24 from 8 a.m. to 3 p.m. This closure accommodates construction.</p>

<p><strong>NEW:</strong> Reduced lanes on Memorial Drive S.E. and 28 Street S.E. starting Saturday, September 23 at 7 a.m. until Sunday, September 24 at 7 p.m. This closure accommodates train maintenance.</p>

<p><strong>NEW:</strong> Reduced lanes on Heritage Drive S.E. and 79 Street S.E. beginning Monday, September 25 until Tuesday, September 26 daily from 9 a.m. to 3 p.m. This closure accommodates traffic signal work.</p>

<p><strong>NEW:</strong> Reduced lanes on 17 Avenue S.E. between 26 Street and 28 Street S.E. on Monday, September 25 from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure.</p>

<p><strong>NEW:</strong> Road closure on 7 Avenue S.E. between 5 Street and 6 Street S.E. beginning Monday, September 25 at 7 a.m. until Friday, October 6 at 7 p.m. Drivers are advised to use alternate routes. This closure accommodates a service tie-in.</p>

<p>Macleod Trail will have reduced lanes at Southland Drive S.E. starting at 9 a.m. on Wednesday, September 20.</p>

<ul>
<li>During the morning peak hours, there will be a traffic pattern change on Macleod Trail at Southland Drive S.E. (5 a.m. to 9 a.m.).</li>
<li>There will be no left turn for at Southland Drive for traffic travelling in either direction of Macleod Trail at Southland Drive S.E.</li>
<li>Motorists wishing to turn left onto Southland Drive at Macleod Trail are advised to use alternate routes of Heritage Drive or Anderson Road S.E.</li>
<li>During this closure, motorists are advised to expect delays in the area, watch for workers in the construction zone, and use alternate routes when possible. This work will continue through 9 p.m. on Saturday, October 7 and accommodates valve install on the water main in the work area.</li>
</ul>

<p>Reduced lanes westbound on 114 Avenue S.E. between 24 Street and 29 Street S.E. beginning Friday, September 15 until Friday, October 6 daily from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Road closure on eastbound 3 Avenue S.E. between Centre Street and 1 Street S.E. beginning Monday, September 18 at 7 a.m. until Thursday, September 28 at 7 p.m. Use alternate routes and expect delays. This closure is to accommodate curb and sidewalk replacement.</p>

<p>Road closure on Confluence Way S.E. between 6 Avenue and Riverfront Avenue S.E. beginning Monday, September 18 at 7 a.m. until Thursday, September 28 at 7 p.m. Use alternate routes and expect delays. This closure is to accommodate service tie in.</p>

<p>Reduced lanes on 114 Avenue S.E. and 29 Street S.E. originally scheduled for completion Thursday, August 24 has been extended until Thursday, September 28 daily from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Reduced lanes on 18 Street S.E. north of Douglas Glen Boulevard S.E. beginning Friday, September 1 until Friday, November 3 daily weekdays from 9 a.m. to 6 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Reduced lane northbound on 18 Street S.E. between Riverglen Drive S.E. and Riverbirch Crescent S.E. beginning on Monday, August 14 to Monday, November 6 weekdays only from 9 a.m. to 6 p.m. Closure is to accommodate construction.</p>

<p>Reduced lane eastbound on 17 Avenue S.E. between 19 Street S.E. and Deerfoot Trail S.E. on Cushing Bridge beginning on Thursday, August 10 at 7 a.m. to Tuesday, October 31 at 7 p.m. Speeds will be reduced to 50 km/h through the work area. Flagman will be onsite to direct traffic. Closure is to accommodate construction.</p>

<p>Southwest</p>

<p><strong>NEW:</strong> Road closure southbound on 11 Street S.W. between 8 Avenue S.W. and 9 Avenue S.W. beginning Saturday, September 23 at 6 a.m. until Sunday, September 24 at 5 p.m. Motorists are advised to use the southbound 14 Street S.W. ramp to 9 Avenue S.W. as a detour. This closure accommodates underground utility work.</p>

<p><strong>NEW:</strong> Road closure on 70 Avenue S.W. between Macleod Trail South and 4A Street S.W. on Saturday, September 23 and Saturday, September 30 from 7 a.m. to 5 p.m. These closures accommodate crane lifts.</p>

<p>There will be a northbound road closure on 1 Street S.W. between 12 Avenue and 13 Avenue S.W. starting Wednesday, September 20 until Friday, September 22 daily from 7 p.m. to 10 p.m. as well as a full road closure at the same location on Friday, September 22 from 9 a.m. to 10 p.m. Speed limit will be reduced. Use alternate routes. These closures accommodate construction.</p>

<p>Road closure on 26 Avenue S.W. between 1 Street S.W. and 4 Street S.W. starting Wednesday, September 20 at 9 a.m. until Wednesday, September 27 at 7 p.m. This closure accommodates underground water main work.</p>

<p>Road closure on 17 Avenue S.W. between 4 Street and 5 Street S.W. beginning Wednesday, September 20 at 7 a.m. until Sunday, October 15 at 7 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Various road closures on 2 Street S.W. between 25 Avenue and 26 Avenue S.W. from 6:30 a.m. to 6:30 p.m. beginning on Monday, September 18. During this closure, motorists are advised to expect delays in the area, and use alternate routes when possible. This closure remains in place until 6:30 p.m. on Saturday, September 30 and accommodates water utility upgrades.</p>

<p>Reduced lanes on 17 Avenue S.W. between 2 Street and 4 Street S.W. beginning Tuesday, September 5 at 7 a.m. until Thursday, September 21 at 7 a.m. This closure accommodates transportation infrastructure work.</p>

<p>Road closure on 17 Avenue S.W. between 1 Street S.E. and 2 Street S.E. with closure on 1 Street S.W. between 15 Avenue S.W. and 17 Avenue S.W. beginning on Saturday, August 5 at 7 a.m. to Sunday, October 1 at 7 p.m. Restricted parking will also be in place on 17 Avenue S.E. with vehicle detours indicated via signage. Closures are to accommodate construction.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Avenue-S-reconstruction.aspx"><strong>17 Avenue S. reconstruction project</strong></a></p>

<ul>
<li>Reduced lanes westbound on 17 Avenue S.E. between 1 Street S.E. and Macleod Trail S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Reduced lanes westbound on 17 Avenue S.E. between Centre Street S.E. and 1 Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Road closure on 17 Avenue S.E. between 1 Street S.W. and Centre Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Access will be open to local traffic only. Vehicle detours will be indicated via signage.</li>
<li>For more information, visit the <a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Ave-SW-construction-schedule.aspx">construction schedule page</a>.</li>
</ul>

<p>Alberta Transportation</p>

<p>Alberta Transportation maintains Deerfoot Trail (Hwy.2) and Stoney Trail (Hwy. 201). For more information on work happening on these roads visit <a href="http://www.transportation.alberta.ca/">Alberta Transportation&rsquo;s website.</a></p>

<p>Southwest Ring Road Project</p>

<p>24 Street S.W. is permanently closed north of Highway 22x as part of the SWRR construction project. For more information on work happening, visit <a href="http://www.swcrrproject.com/traffic-updates/">http://www.swcrrproject.com/traffic-updates/</a></p>]]></description><category><![CDATA[Transportation,road closures]]></category>
            <pubDate>Thu, 21 Sep 2017 15:35:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Calgary road closures - September 20, 2017</title>
                        <link>https://newsroom.calgary.ca/calgary-road-closures---september-20-2017/</link>
                        <guid>https://newsroom.calgary.ca/calgary-road-closures---september-20-2017/</guid><pp:caseid>232083</pp:caseid><description><![CDATA[<p>Calgary road closures &ndash; September 20, 2017</p>

<p>This press release is aimed at informing 911 and the media of major road closures and lane restrictions. For information on closures in your area, visit Calgary.ca/trafficinfo. Find up to the minute road closure information on the Transportation Twitter account (@yyctransport).</p>

<p>Northeast</p>

<p><strong>NEW:</strong> Reduced lanes on Barlow Trail and 100 Avenue N.E. beginning Thursday, September 21 until Friday, September 22 daily from 7 a.m. to 7 p.m. This closure accommodates construction.</p>

<p><strong>NEW:</strong> Reduced lanes at 1319 Edmonton Trail N.E. beginning Thursday, September 21 until Saturday, September 23 daily weekdays from 9 a.m. to 3 p.m. and Saturday from 7 a.m. to 7 p.m. This closure accommodates construction.</p>

<p>Reduced lanes on Memorial Drive and 4 Street N.E. starting Tuesday, September 19 from 12 p.m. to 3 p.m. and continuing from Wednesday, September 20 to Friday, September 22 daily from 9 a.m. to 3 p.m. This closure accommodates construction work.</p>

<p>Reduced lanes on 36 Street N.E. between 88 Avenue and 80 Avenue N.E. starting Wednesday, September 20 until Friday, September 22 daily from 7 a.m. to 4 p.m. This closure accommodates construction.</p>

<p>Reduced lanes On Country Hills Boulevard N.E. between Metis Trail and 52 Street N.E. starting Wednesday, September 13 until Friday, September 22 weekdays from 9 a.m. to 8 p.m., Saturdays from 7 a.m. to 7 p.m. and Sundays from 9 a.m. to 7 p.m. This closure accommodates construction work.</p>

<p>Northwest</p>

<p><strong>NEW:</strong> Reduced lanes southbound at 305 10 Street N.W. beginning Thursday, September 21 until Tuesday, September 26 daily weekdays only from 9 a.m. to 3 p.m. This closure accommodates construction.</p>

<p>Reduced lanes on Crowfoot Way and Crowfoot Circle N.W. beginning Wednesday, September 20 until Friday, September 22 daily from 7 a.m. to 7 p.m. This closure accommodates utility work.</p>

<p>Road closure at 221 19 Avenue N.W. starting Wednesday, September 20 until Friday, September 22 daily from 9 a.m. to 7 p.m. This closure accommodates construction.</p>

<p>Reduced lanes and sidewalk closure on eastbound 16 Avenue N.W. east of 12 Street N.W. in the bus lane beginning Monday, September 11 at 9 a.m. until Monday, September 25 at 3 p.m. This closure accommodates construction.</p>

<p>Reduced lanes westbound and eastbound on 16 Avenue and Home Road N.W. beginning Monday, September 11 until Saturday, September 30 daily weekdays from 9 a.m. to 3 p.m. and Saturdays from 7 a.m. to 5 p.m. This closure accommodates construction.</p>

<p>16 Avenue N.W. at 29 Street N.W. / Uxbridge Drive N.W. will see various lane closures until the end of October, 2017 as part of an intersection improvement project.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/TransCanada-Highway-Sarcee-Trail-Interchange-Project.aspx"><strong>Trans Canada Highway / Sarcee Trail Interchange Improvements project</strong></a></p>

<ul>
<li>Daily lane reductions on Sarcee Trail N.W. at 16 Avenue N.W. from 9 a.m. to 3 p.m. through project limits to the end of October.</li>
</ul>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/Bowfort-Rd-Trans-Canada-Hwy-interchange.aspx"><strong>16 Ave NW / Bowfort Road Interchange Improvements</strong></a></p>

<ul>
<li>Daily lane reductions on Bowfort Road N.W. and 16 Avenue N.W. through the project limits from 9 a.m. to 3 p.m. until further notice. For more information on this project, visit the project page.</li>
</ul>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/16-Avenue-Home-Road-NW-Upgrades.aspx"><strong>16 Avenue and Home Road N.W. Upgrades</strong></a></p>

<ul>
<li>Please note that the following lane closures are in effect until the end of September
<ul>
<li>Monday to Friday from 9 a.m. &ndash; 3 p.m.: The right-hand lane will be closed in each direction.</li>
<li>Saturdays from 7 a.m. &ndash; 5 p.m.: The right-hand lane will be closed in each direction</li>
</ul>
</li>
<li>To avoid delays please consider using Bowness Road N.W. as an alternate route to bypass the construction area</li>
</ul>

<p>Southeast</p>

<p>Macleod Trail will have reduced lanes at Southland Drive S.E. starting at 9 a.m. on Wednesday, September 20.</p>

<ul>
<li>During the morning peak hours, there will be a traffic pattern change on Macleod Trail at Southland Drive S.E. (5 a.m. to 9 a.m.).</li>
<li>There will be no left turn for at Southland Drive for traffic travelling in either direction of Macleod Trail at Southland Drive S.E.</li>
<li>Motorists wishing to turn left onto Southland Drive at Macleod Trail are advised to use alternate routes of Heritage Drive or Anderson Road S.E.</li>
<li>During this closure, motorists are advised to expect delays in the area, watch for workers in the construction zone, and use alternate routes when possible. This work will continue through 9 p.m. on Saturday, October 7 and accommodates valve install on the water main in the work area.</li>
</ul>

<p>Reduced lanes westbound on 114 Avenue S.E. between 24 Street and 29 Street S.E. beginning Friday, September 15 until Friday, October 6 daily from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Road closure on eastbound 3 Avenue S.E. between Centre Street and 1 Street S.E. beginning Monday, September 18 at 7 a.m. until Thursday, September 28 at 7 p.m. Use alternate routes and expect delays. This closure is to accommodate curb and sidewalk replacement.</p>

<p>Road closure on Confluence Way S.E. between 6 Avenue and Riverfront Avenue S.E. beginning Monday, September 18 at 7 a.m. until Thursday, September 28 at 7 p.m. Use alternate routes and expect delays. This closure is to accommodate service tie in.</p>

<p>Reduced lanes on 114 Avenue S.E. and 29 Street S.E. originally scheduled for completion Thursday, August 24 has been extended until Thursday, September 28 daily from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Reduced lanes on 18 Street S.E. north of Douglas Glen Boulevard S.E. beginning Friday, September 1 until Friday, November 3 daily weekdays from 9 a.m. to 6 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Reduced lane northbound on 18 Street S.E. between Riverglen Drive S.E. and Riverbirch Crescent S.E. beginning on Monday, August 14 to Monday, November 6 weekdays only from 9 a.m. to 6 p.m. Closure is to accommodate construction.</p>

<p>Reduced lane eastbound on 17 Avenue S.E. between 19 Street S.E. and Deerfoot Trail S.E. on Cushing Bridge beginning on Thursday, August 10 at 7 a.m. to Tuesday, October 31 at 7 p.m. Speeds will be reduced to 50 km/h through the work area. Flagman will be onsite to direct traffic. Closure is to accommodate construction.</p>

<p>Southwest</p>

<p>There will be a northbound road closure on 1 Street S.W. between 12 Avenue and 13 Avenue S.W. starting Wednesday, September 20 until Friday, September 22 daily from 7 p.m. to 10 p.m. as well as a full road closure at the same location on Friday, September 22 from 9 a.m. to 10 p.m. Speed limit will be reduced. Use alternate routes. These closures accommodate construction.</p>

<p>Road closure on 26 Avenue S.W. between 1 Street S.W. and 4 Street S.W. starting Wednesday, September 20 at 9 a.m. until Wednesday, September 27 at 7 p.m. This closure accommodates underground water main work.</p>

<p>Road closure on 17 Avenue S.W. between 4 Street and 5 Street S.W. beginning Wednesday, September 20 at 7 a.m. until Sunday, October 15 at 7 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Various road closures on 2 Street S.W. between 25 Avenue and 26 Avenue S.W. from 6:30 a.m. to 6:30 p.m. beginning on Monday, September 18. During this closure, motorists are advised to expect delays in the area, and use alternate routes when possible. This closure remains in place until 6:30 p.m. on Saturday, September 30 and accommodates water utility upgrades.</p>

<p>Reduced lanes on 17 Avenue S.W. between 2 Street and 4 Street S.W. beginning Tuesday, September 5 at 7 a.m. until Thursday, September 21 at 7 a.m. This closure accommodates transportation infrastructure work.</p>

<p>Road closure on 17 Avenue S.W. between 1 Street S.E. and 2 Street S.E. with closure on 1 Street S.W. between 15 Avenue S.W. and 17 Avenue S.W. beginning on Saturday, August 5 at 7 a.m. to Sunday, October 1 at 7 p.m. Restricted parking will also be in place on 17 Avenue S.E. with vehicle detours indicated via signage. Closures are to accommodate construction.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Avenue-S-reconstruction.aspx"><strong>17 Avenue S. reconstruction project</strong></a></p>

<ul>
<li>Reduced lanes westbound on 17 Avenue S.E. between 1 Street S.E. and Macleod Trail S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Reduced lanes westbound on 17 Avenue S.E. between Centre Street S.E. and 1 Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Road closure on 17 Avenue S.E. between 1 Street S.W. and Centre Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Access will be open to local traffic only. Vehicle detours will be indicated via signage.</li>
<li>For more information, visit the <a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Ave-SW-construction-schedule.aspx">construction schedule page</a>.</li>
</ul>

<p>Alberta Transportation</p>

<p>Alberta Transportation maintains Deerfoot Trail (Hwy.2) and Stoney Trail (Hwy. 201). For more information on work happening on these roads visit <a href="http://www.transportation.alberta.ca/">Alberta Transportation&rsquo;s website.</a></p>

<p>Southwest Ring Road Project</p>

<p>24 Street S.W. is permanently closed north of Highway 22x as part of the SWRR construction project. For more information on work happening, visit <a href="http://www.swcrrproject.com/traffic-updates/">http://www.swcrrproject.com/traffic-updates/</a></p>]]></description><category><![CDATA[Transportation,road closures]]></category>
            <pubDate>Wed, 20 Sep 2017 15:38:07 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Calgary road closures - September 19, 2017</title>
                        <link>https://newsroom.calgary.ca/calgary-road-closures---september-19-2017/</link>
                        <guid>https://newsroom.calgary.ca/calgary-road-closures---september-19-2017/</guid><pp:caseid>231934</pp:caseid><description><![CDATA[<p>Calgary road closures &ndash; September 19, 2017</p>

<p>This press release is aimed at informing 911 and the media of major road closures and lane restrictions. For information on closures in your area, visit Calgary.ca/trafficinfo. Find up to the minute road closure information on the Transportation Twitter account (@yyctransport).</p>

<p>Northeast</p>

<p><strong>NEW:</strong> Reduced lanes on Memorial Drive and 4 Street N.E. starting Tuesday, September 19 from 12 p.m. to 3 p.m. and continuing from Wednesday, September 20 to Friday, September 22 daily from 9 a.m. to 3 p.m. This closure accommodates construction work.</p>

<p><strong>NEW:</strong> Reduced lanes on Memorial Drive N.E. between Deerfoot Trail and St. George&rsquo;s Drive N.E. on Wednesday, September 20 from 9 a.m. to 3 p.m. This closure accommodates material delivery.</p>

<p><strong>NEW:</strong> Reduced lanes on Harvest Hills Boulevard N.E. and Country Village Road N.E. on Wednesday, September 20 from 9 a.m. to 3 p.m. This closure accommodates construction.</p>

<p><strong>NEW:</strong> Reduced lanes at 1616 1 Street N.E. on Wednesday, September 20 from 9 a.m. to 3 p.m. This closure accommodates construction.</p>

<p><strong>NEW:</strong> Reduced lanes on 36 Street N.E. between 88 Avenue and 80 Avenue N.E. starting Wednesday, September 20 until Friday, September 22 daily from 7 a.m. to 4 p.m. This closure accommodates construction.</p>

<p>Reduced lanes On Country Hills Boulevard N.E. between Metis Trail and 52 Street N.E. starting Wednesday, September 13 until Friday, September 22 weekdays from 9 a.m. to 8 p.m., Saturdays from 7 a.m. to 7 p.m. and Sundays from 9 a.m. to 7 p.m. This closure accommodates construction work.</p>

<p>Northwest</p>

<p><strong>NEW:</strong> Reduced lanes and sidewalk closure at 219 19 Street N.W. on Wednesday, September 20 from 10 a.m. to 1 p.m. This closure accommodates construction.</p>

<p><strong>NEW:</strong> Reduced lanes on Crowfoot Way and Crowfoot Circle N.W. beginning Wednesday, September 20 until Friday, September 22 daily from 7 a.m. to 7 p.m. This closure accommodates utility work.</p>

<p><strong>NEW:</strong> Road closure at 221 19 Avenue N.W. starting Wednesday, September 20 until Friday, September 22 daily from 9 a.m. to 7 p.m. This closure accommodates construction.</p>

<p>Reduced lanes and sidewalk closure on eastbound 16 Avenue N.W. east of 12 Street N.W. in the bus lane beginning Monday, September 11 at 9 a.m. until Monday, September 25 at 3 p.m. This closure accommodates construction.</p>

<p>Reduced lanes westbound and eastbound on 16 Avenue and Home Road N.W. beginning Monday, September 11 until Saturday, September 30 daily weekdays from 9 a.m. to 3 p.m. and Saturdays from 7 a.m. to 5 p.m. This closure accommodates construction.</p>

<p>Reduced lanes &ndash; right lane and parking lane closures &ndash; on Bowness Road N.W. from 61 Street to 66 Street N.W. daily weekdays beginning on Wednesday, August 23 until Wednesday, September 20 from 8:30 a.m. to 3:30 p.m. This closure is to accommodate construction.</p>

<p>16 Avenue N.W. at 29 Street N.W. / Uxbridge Drive N.W. will see various lane closures until the end of October, 2017 as part of an intersection improvement project.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/TransCanada-Highway-Sarcee-Trail-Interchange-Project.aspx"><strong>Trans Canada Highway / Sarcee Trail Interchange Improvements project</strong></a></p>

<ul>
<li><strong>Update:</strong> Daily lane reductions on Sarcee Trail N.W. at 16 Avenue N.W. from 9 a.m. to 3 p.m. through project limits to the end of October.</li>
</ul>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/Bowfort-Rd-Trans-Canada-Hwy-interchange.aspx"><strong>16 Ave NW / Bowfort Road Interchange Improvements</strong></a></p>

<ul>
<li>Daily lane reductions on Bowfort Road N.W. and 16 Avenue N.W. through the project limits from 9 a.m. to 3 p.m. until further notice. For more information on this project, visit the project page.</li>
</ul>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/16-Avenue-Home-Road-NW-Upgrades.aspx"><strong>16 Avenue and Home Road N.W. Upgrades</strong></a></p>

<ul>
<li>Please note that the following lane closures are in effect until the end of September
<ul>
<li>Monday to Friday from 9 a.m. &ndash; 3 p.m.: The right-hand lane will be closed in each direction.</li>
<li>Saturdays from 7 a.m. &ndash; 5 p.m.: The right-hand lane will be closed in each direction</li>
</ul>
</li>
<li>To avoid delays please consider using Bowness Road N.W. as an alternate route to bypass the construction area</li>
</ul>

<p>Southeast</p>

<p><strong>NEW:</strong> Macleod Trail will have reduced lanes at Southland Drive S.E. starting at 9 a.m. on Wednesday, September 20.</p>

<ul>
<li>During the morning peak hours, there will be a traffic pattern change on Macleod Trail at Southland Drive S.E. (5 a.m. to 9 a.m.).</li>
<li>There will be no left turn for at Southland Drive for traffic travelling in either direction of Macleod Trail at Southland Drive S.E.</li>
<li>Motorists wishing to turn left onto Southland Drive at Macleod Trail are advised to use alternate routes of Heritage Drive or Anderson Road S.E.</li>
<li>During this closure, motorists are advised to expect delays in the area, watch for workers in the construction zone, and use alternate routes when possible. This work will continue through 9 p.m. on Saturday, October 7 and accommodates valve install on the water main in the work area.</li>
</ul>

<p>Reduced lanes westbound on 114 Avenue S.E. between 24 Street and 29 Street S.E. beginning Friday, September 15 until Friday, October 6 daily from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Road closure on eastbound 3 Avenue S.E. between Centre Street and 1 Street S.E. beginning Monday, September 18 at 7 a.m. until Thursday, September 28 at 7 p.m. Use alternate routes and expect delays. This closure is to accommodate curb and sidewalk replacement.</p>

<p>Road closure on Confluence Way S.E. between 6 Avenue and Riverfront Avenue S.E. beginning Monday, September 18 at 7 a.m. until Thursday, September 28 at 7 p.m. Use alternate routes and expect delays. This closure is to accommodate service tie in.</p>

<p>Reduced lanes on 114 Avenue S.E. and 29 Street S.E. originally scheduled for completion Thursday, August 24 has been extended until Thursday, September 28 daily from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Reduced lanes on 18 Street S.E. north of Douglas Glen Boulevard S.E. beginning Friday, September 1 until Friday, November 3 daily weekdays from 9 a.m. to 6 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Reduced lane northbound on 18 Street S.E. between Riverglen Drive S.E. and Riverbirch Crescent S.E. beginning on Monday, August 14 to Monday, November 6 weekdays only from 9 a.m. to 6 p.m. Closure is to accommodate construction.</p>

<p>Reduced lane eastbound on 17 Avenue S.E. between 19 Street S.E. and Deerfoot Trail S.E. on Cushing Bridge beginning on Thursday, August 10 at 7 a.m. to Tuesday, October 31 at 7 p.m. Speeds will be reduced to 50 km/h through the work area. Flagman will be onsite to direct traffic. Closure is to accommodate construction.</p>

<p>Southwest</p>

<p><strong>NEW:</strong> There will be a northbound road closure on 1 Street S.W. between 12 Avenue and 13 Avenue S.W. starting Wednesday, September 20 until Friday, September 22 daily from 7 p.m. to 10 p.m. as well as a full road closure at the same location on Friday, September 22 from 9 a.m. to 10 p.m. Speed limit will be reduced. Use alternate routes. These closures accommodate construction.</p>

<p><strong>NEW:</strong> Road closure on 26 Avenue S.W. between 1 Street S.W. and 4 Street S.W. starting Wednesday, September 20 at 9 a.m. until Wednesday, September 27 at 7 p.m. This closure accommodates underground water main work.</p>

<p><strong>NEW:</strong> Road closure on 17 Avenue S.W. between 4 Street and 5 Street S.W. beginning Wednesday, September 20 at 7 a.m. until Sunday, October 15 at 7 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Various road closures on 2 Street S.W. between 25 Avenue and 26 Avenue S.W. from 6:30 a.m. to 6:30 p.m. beginning on Monday, September 18. During this closure, motorists are advised to expect delays in the area, and use alternate routes when possible. This closure remains in place until 6:30 p.m. on Saturday, September 30 and accommodates water utility upgrades.</p>

<p>Reduced lanes on 17 Avenue S.W. between 2 Street and 4 Street S.W. beginning Tuesday, September 5 at 7 a.m. until Thursday, September 21 at 7 a.m. This closure accommodates transportation infrastructure work.</p>

<p>Road closure on 17 Avenue S.W. between 1 Street S.E. and 2 Street S.E. with closure on 1 Street S.W. between 15 Avenue S.W. and 17 Avenue S.W. beginning on Saturday, August 5 at 7 a.m. to Sunday, October 1 at 7 p.m. Restricted parking will also be in place on 17 Avenue S.E. with vehicle detours indicated via signage. Closures are to accommodate construction.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Avenue-S-reconstruction.aspx"><strong>17 Avenue S. reconstruction project</strong></a></p>

<ul>
<li>Reduced lanes westbound on 17 Avenue S.E. between 1 Street S.E. and Macleod Trail S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Reduced lanes westbound on 17 Avenue S.E. between Centre Street S.E. and 1 Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Road closure on 17 Avenue S.E. between 1 Street S.W. and Centre Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Access will be open to local traffic only. Vehicle detours will be indicated via signage.</li>
<li>For more information, visit the <a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Ave-SW-construction-schedule.aspx">construction schedule page</a>.</li>
</ul>

<p>Alberta Transportation</p>

<p>Alberta Transportation maintains Deerfoot Trail (Hwy.2) and Stoney Trail (Hwy. 201). For more information on work happening on these roads visit <a href="http://www.transportation.alberta.ca/">Alberta Transportation&rsquo;s website.</a></p>

<p>Southwest Ring Road Project</p>

<p>24 Street S.W. is permanently closed north of Highway 22x as part of the SWRR construction project. For more information on work happening, visit <a href="http://www.swcrrproject.com/traffic-updates/">http://www.swcrrproject.com/traffic-updates/</a></p>]]></description><category><![CDATA[Transportation,road closures]]></category>
            <pubDate>Tue, 19 Sep 2017 15:42:24 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Calgary road closures - September 14, 2017</title>
                        <link>https://newsroom.calgary.ca/calgary-road-closures---september-14-2017/</link>
                        <guid>https://newsroom.calgary.ca/calgary-road-closures---september-14-2017/</guid><pp:caseid>228228</pp:caseid><description><![CDATA[<p>Calgary road closures &ndash; September 14, 2017</p>

<p>This press release is aimed at informing 911 and the media of major road closures and lane restrictions. For information on closures in your area, visit Calgary.ca/trafficinfo. Find up to the minute road closure information on the Transportation Twitter account (@yyctransport).</p>

<p>Northeast</p>

<p><strong>NEW:</strong> Reduced lanes eastbound on Memorial Drive N.E. between 9 Street and 12 Street N.E. on Friday, September 15 from 7 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p><strong>NEW:</strong> Road closure at 229 12 Avenue N.E. beginning Friday, September 15 at 6 p.m. until Monday, September 18 at 5 a.m. This closure accommodates water/sewer tie in.</p>

<p><strong>NEW:</strong> Reduced lanes on Memorial Drive N.E. and Edmonton Trail N.E. starting Friday, September 15 until Tuesday, September 19 weekdays only from 9 a.m. to 3 p.m. This closure accommodates utility work.</p>

<p><strong>NEW:</strong> Reduced lanes on 36 Street N.E. between Airport Trail and 88 Avenue N.E. beginning Saturday, September 16 until Tuesday, September 19 (excluding Sunday) from 7 a.m. to 4 p.m. daily. This closure accommodates construction.</p>

<p><strong>NEW:</strong> Ramp will be closed at Memorial Drive and 12 Street N.E. beginning Sunday, September 17 at 8 p.m. until Monday, September 18 at 1 a.m. This closure accommodates utility work.</p>

<p><strong>NEW:</strong> Reduced lanes at Memorial Drive and 12 Street N.E. beginning Monday, September 18 at 1 a.m. until further notice. This closure accommodates new curb alignment.</p>

<p>Reduced lanes northbound on 32 Street N.E. and 23 Avenue N.E. beginning Thursday, September 14 until Saturday, September 16 daily from 8:30 a.m. until 3:30 p.m. This closure accommodates utility work.</p>

<p>Reduced lanes southbound on 36 Street N.E. between 88 Avenue and 80 Avenue N.E. beginning Thursday, September 14 at 7 a.m. until Saturday, September 16 at 4 p.m. This closure accommodates landscaping work.</p>

<p>Reduced lanes On Country Hills Boulevard N.E. between Metis Trail and 52 Street N.E. starting Wednesday, September 13 until Friday, September 22 weekdays from 9 a.m. to 8 p.m., Saturdays from 7 a.m. to 7 p.m. and Sundays from 9 a.m. to 7 p.m. This closure accommodates construction work.</p>

<p>Northwest</p>

<p><strong>NEW:</strong> Road closure on 17 Avenue N.W. between 7 Street and 8 Street N.W. on Friday, September 15 from 6 a.m. to 6 p.m. This closure accommodates construction work.</p>

<p><strong>NEW:</strong> Reduced lanes on 52 Avenue N.W. between Northland Drive and Brisebois Drive N.W. on Saturday, September 16 from 4 a.m. to 7 p.m. Flaggers will be on site to direct traffic in and out of the area. This closure accommodates paving.</p>

<p>Reduced lanes and sidewalk closure on eastbound 16 Avenue N.W. east of 12 Street N.W. in the bus lane beginning Monday, September 11 at 9 a.m. until Monday, September 25 at 3 p.m. This closure accommodates construction.</p>

<p>Reduced lanes westbound and eastbound on 16 Avenue and Home Road N.W. beginning Monday, September 11 until Saturday, September 30 daily weekdays from 9 a.m. to 3 p.m. and Saturdays from 7 a.m. to 5 p.m. This closure accommodates construction.</p>

<p>Reduced lanes at 5031 Nosehill Drive N.W. beginning Friday, September 8 until Friday, September 15 daily weekdays from 9 a.m. to 3 p.m. and Saturdays from 7 a.m. to 7 p.m. This closure accommodates construction.</p>

<p>Reduced lanes northbound and westbound Edgemont Boulevard N.W. and Edgebrook Drive N.W. beginning Thursday, September 7 until Saturday, September 16 weekdays from 9 a.m. to 3 p.m. and Saturdays from 7 a.m. to 5 p.m. This closure accommodates construction work.</p>

<p>Reduced lanes &ndash; right lane and parking lane closures &ndash; on Bowness Road N.W. from 61 Street to 66 Street N.W. daily weekdays beginning on Wednesday, August 23 until Wednesday, September 20 from 8:30 a.m. to 3:30 p.m. This closure is to accommodate construction.</p>

<p>16 Avenue N.W. at 29 Street N.W. / Uxbridge Drive N.W. will see various lane closures until the end of October, 2017 as part of an intersection improvement project.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/Bowfort-Rd-Trans-Canada-Hwy-interchange.aspx"><strong>16 Ave NW / Bowfort Road Interchange Improvements</strong></a></p>

<ul>
<li>Daily lane reductions on Bowfort Road N.W. and 16 Avenue N.W. through the project limits from 9 a.m. to 3 p.m. until further notice. For more information on this project, visit the project page.</li>
</ul>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/16-Avenue-Home-Road-NW-Upgrades.aspx"><strong>16 Avenue and Home Road N.W. Upgrades</strong></a></p>

<ul>
<li>Please note that the following lane closures are in effect until the end of September
<ul>
<li>Monday to Friday from 9 a.m. &ndash; 3 p.m.: The right-hand lane will be closed in each direction.</li>
<li>Saturdays from 7 a.m. &ndash; 5 p.m.: The right-hand lane will be closed in each direction</li>
</ul>
</li>
<li>To avoid delays please consider using Bowness Road N.W. as an alternate route to bypass the construction area</li>
</ul>

<p>Southeast</p>

<p><strong>NEW:</strong> Reduced lanes on 17 Avenue S.E. between 26 Street and 28 Street S.E. on Friday, September 15 from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p><strong>NEW:</strong> Southbound 1 Street S.E between 15 Avenue and 18 Avenue S.E. will be reduced to one lane beginning Friday, September 15 until Sunday, September 17 from 7 p.m. to 10 p.m. This closure accommodates transportation infrastructure work.</p>

<p><strong>NEW:</strong> Reduced lanes westbound on 114 Avenue S.E. between 24 Street and 29 Street S.E. beginning Friday, September 15 until Friday, October 6 daily from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p><strong>NEW:</strong> Reduced lanes northbound on 18 Street S.E. and Riverglen Drive S.E. on Saturday, September 16 from 9 a.m. to 6 p.m. This closure accommodates transportation infrastructure work.</p>

<p><strong>NEW:</strong> Road closure on 17 Avenue S.E. between Hubalta Road and 60 Street S.E. beginning Saturday, September 16 at 6 a.m. until Sunday, September 17 at 4 p.m. This closure accommodates construction.</p>

<p><strong>NEW:</strong> Road closure on eastbound 3 Avenue S.E. between Centre Street and 1 Street S.E. beginning Monday, September 18 at 7 a.m. until Thursday, September 28 at 7 p.m. Use alternate routes and expect delays. This closure is to accommodate curb and sidewalk replacement.</p>

<p><strong>NEW:</strong> Road closure on Confluence Way S.E. between 6 Avenue and Riverfront Avenue S.E. beginning Monday, September 18 at 7 a.m. until Thursday, September 28 at 7 p.m. Use alternate routes and expect delays. This closure is to accommodate service tie in.</p>

<p>Reduced southbound lanes on Centre Street between Riverfront Avenue S.E. and Samis Road N.E. beginning Saturday, September 9 until Friday, September 15 daily weekdays from 9 a.m. to 3 p.m. and weekends from 7 a.m. to 5 p.m. This closure accommodates overhead utility work.</p>

<p>Reduced lanes at Heritage Drive S.E. and 79 Avenue S.E. beginning Monday, September 11 until Friday, September 15 daily from 9 a.m. to 3 p.m. This closure accommodates traffic signal work.</p>

<p>Reduced lanes on southbound McKenzie Lake Boulevard S.E. from Mt. Sparrowhawk Landing S.E. to Stoney Trail S.E. beginning on Monday, September 11 to Friday, September 15 from 9 a.m. to 3 p.m. daily. Speeds will be reduced through the construction zone. This closure accommodates underground utility work.</p>

<p>Reduced lanes on 114 Avenue S.E. and 29 Street S.E. originally scheduled for completion Thursday, August 24 has been extended until Thursday, September 28 daily from 9 a.m. to 3 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Reduced lanes on 18 Street S.E. north of Douglas Glen Boulevard S.E. beginning Friday, September 1 until Friday, November 3 daily weekdays from 9 a.m. to 6 p.m. This closure accommodates transportation infrastructure work.</p>

<p>Road closure on 6 Avenue S.E. between 5 Street and Confluence Way S.E. has been extended until 6 p.m. on Tuesday, September 12. Drivers are asked to use alternate routes and expect delays. This closure accommodates underground utility installation.</p>

<p>Reduced lanes southbound Centre Street S between Riverfront Avenue S.E. and Samis Road N.E. beginning Saturday, August 26 until Tuesday, September 19. Closure begins daily from 9 a.m. to 3 p.m. on weekdays and from 7 a.m. to 5 p.m. on weekends. This closure accommodates overhead utility work.</p>

<p>Reduced lane northbound on 18 Street S.E. between Riverglen Drive S.E. and Riverbirch Crescent S.E. beginning on Monday, August 14 to Monday, November 6 weekdays only from 9 a.m. to 6 p.m. Closure is to accommodate construction.</p>

<p>Reduced lane eastbound on 17 Avenue S.E. between 19 Street S.E. and Deerfoot Trail S.E. on Cushing Bridge beginning on Thursday, August 10 at 7 a.m. to Tuesday, October 31 at 7 p.m. Speeds will be reduced to 50 km/h through the work area. Flagman will be onsite to direct traffic. Closure is to accommodate construction.</p>

<p>Reduced lane southbound on 18 Street S.E. between Douglas Glen Boulevard S.E. and 24 Street S.E. beginning on Thursday, August 3 to Monday, September 18 weekdays daily from 9 a.m. to 6 p.m. Speeds will be reduced to 50 km/h through the work area. Closure is to accommodate construction.</p>

<p>Southwest</p>

<p><strong>NEW:</strong> Lane restrictions on 4 Street S.W. between 15 Avenue and 18 Avenue S.W. on Friday, September 15 from 9 a.m. to 7 p.m. This closure accommodates transportation infrastructure work.</p>

<p><strong>NEW:</strong> Road closure on 17 Avenue S.W. and 4 Street S.W. beginning Friday, September 15 at 7 p.m. until Sunday, September 17 at 10 p.m. This closure accommodates transportation infrastructure work.</p>

<p><strong>NEW:</strong> The City Hall driveway to parkade at 3 Street S.E. between 6 Avenue and 9 Avenue S.E. will be closed on Friday, September 15, 2017 at 6 p.m. until Monday, September 18 at 5 a.m. This closure accommodates paving. Alternate&nbsp;access to parkade will be provided from Edwards Place driveway and will be accessible at all times.</p>

<p><strong>NEW:</strong> Road closure on 1 Street S.W. between 13 Avenue and 14 Avenue S.W. on Saturday, September 16 from 7 a.m. to 7 p.m. Use alternate routes and expect delays. This closure accommodates concrete work.</p>

<p><strong>NEW:</strong> Various road closures on 2 Street S.W. between 25 Avenue and 26 Avenue S.W. from 6:30 a.m. to 6:30 p.m. beginning on Monday, September 18. During this closure, motorists are advised to expect delays in the area, and use alternate routes when possible. This closure remains in place until 6:30 p.m. on Saturday, September 30 and accommodates water utility upgrades.</p>

<p>Reduced lanes on 17 Avenue S.W. between 2 Street and 4 Street S.W. beginning Tuesday, September 5 at 7 a.m. until Thursday, September 21 at 7 a.m. This closure accommodates transportation infrastructure work.</p>

<p>Road closure on 17 Avenue S.W. between 1 Street S.E. and 2 Street S.E. with closure on 1 Street S.W. between 15 Avenue S.W. and 17 Avenue S.W. beginning on Saturday, August 5 at 7 a.m. to Sunday, October 1 at 7 p.m. Restricted parking will also be in place on 17 Avenue S.E. with vehicle detours indicated via signage. Closures are to accommodate construction.</p>

<p><a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Avenue-S-reconstruction.aspx"><strong>17 Avenue S. reconstruction project</strong></a></p>

<ul>
<li>Reduced lanes westbound on 17 Avenue S.E. between 1 Street S.E. and Macleod Trail S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Reduced lanes westbound on 17 Avenue S.E. between Centre Street S.E. and 1 Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Although closed to through westbound traffic, access to local traffic and businesses will remain. Parking restrictions will be in place through work area. Vehicle and pedestrian detours will be indicated via signage. Closure is to accommodate construction.</li>
<li>Road closure on 17 Avenue S.E. between 1 Street S.W. and Centre Street S.E. beginning on Monday, July 17 at 7 a.m. to Sunday, October 1 at 7 p.m. Access will be open to local traffic only. Vehicle detours will be indicated via signage.</li>
<li>For more information, visit the <a href="http://www.calgary.ca/Transportation/TI/Pages/Road-projects/17-Ave-SW-construction-schedule.aspx">construction schedule page</a>.</li>
</ul>

<p>Alberta Transportation</p>

<p>Alberta Transportation maintains Deerfoot Trail (Hwy.2) and Stoney Trail (Hwy. 201). For more information on work happening on these roads visit <a href="http://www.transportation.alberta.ca/">Alberta Transportation&rsquo;s website.</a></p>

<p>Southwest Ring Road Project</p>

<p>24 Street S.W. is permanently closed north of Highway 22x as part of the SWRR construction project. For more information on work happening, visit <a href="http://www.swcrrproject.com/traffic-updates/">http://www.swcrrproject.com/traffic-updates/</a></p>]]></description><category><![CDATA[Transportation,road closures]]></category>
            <pubDate>Thu, 14 Sep 2017 15:35:00 -0600</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1485.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/clients/150_1485.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1485.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>City of Calgary wins international award for pedestrian strategy</title>
                        <link>https://newsroom.calgary.ca/city-of-calgary-wins-international-award-for-pedestrian-strategy/</link>
                        <guid>https://newsroom.calgary.ca/city-of-calgary-wins-international-award-for-pedestrian-strategy/</guid><pp:caseid>226766</pp:caseid><description><![CDATA[<p>The City of Calgary&rsquo;s pedestrian strategy&mdash;Step Forward&mdash;has been awarded the Institute of Transportation Engineers (ITE) 2017 Transportation Planning Council Best Project Award. This international award recognizes Calgary&rsquo;s pedestrian strategy for its comprehensive approach to gathering stakeholders&rsquo; input, and evaluating ideas against their ability to be implemented and their level of impact.</p>

<p>&ldquo;We are thrilled to accept this award for Calgary&rsquo;s pedestrian strategy, Step Forward," says Dale Lynch, Manager Liveable Streets. &ldquo;The strategy was built on the input shared by thousands of Calgarians. It acknowledges that Calgarians think it&rsquo;s important to improve walking in the city. Not only is walking a transportation choice, it also helps people benefit from an active lifestyle and supports local communities."</p>

<p>Approved in 2016, Calgary&rsquo;s pedestrian strategy includes 49 actions to help make Calgary safer, more comfortable, and interesting for walking. Some of the actions identified are already underway, including:</p>

<ul>
<li>Improving intersections with the installation of 75 new Rectangular Rapid Flashing Beacons.</li>
<li>Building missing sidewalk and pathway connections near schools and transit stations.</li>
<li>Launch of the ActivateYYC microgrant program to help citizens to initiate 150 walkability projects in their communities.</li>
</ul>

<p>To learn more about The City&rsquo;s pedestrian strategy, Step Forward, visit <a href="http://www.calgary.ca/Transportation/TP/Pages/Planning/Calgary-Transportation-Plan/Pedestrian-Strategy.aspx?redirect=/pedestrianstrategy">calgary.ca/PedestrianStrategy</a>.</p>]]></description><category><![CDATA[banner,Transportation]]></category>
            <pubDate>Wed, 13 Sep 2017 10:34:58 -0600</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1485/500_tacticalurbanism-action17ofthepedestrianstrategy.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1485/500_tacticalurbanism-action17ofthepedestrianstrategy.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1485/tacticalurbanism-action17ofthepedestrianstrategy.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[Tactical Urbanism - Action 17 of the Pedestrian Strategy]]></pp:imageTitle></item></channel>
                    </rss>