Calgary, AB,
05
April
2013
|
16:08
America/Denver
Calgary road closures and lane restrictions for April 5, 2013
Special events
Glencoe Club Ice Breaker 10 km Road Race
The right lane of Elbow Drive between 32 Avenue S.W. and 4 street S.W., will be closed, from 9 a.m. to 11 a.m. on Sunday, April 7, for the Glencoe Club Ice Breaker 10 km Road Race.
Glencoe Club Ice Breaker 10 km Road Race
The right lane of Elbow Drive between 32 Avenue S.W. and 4 street S.W., will be closed, from 9 a.m. to 11 a.m. on Sunday, April 7, for the Glencoe Club Ice Breaker 10 km Road Race.
Mount Royal University Sprint Triathlon – Sunday, April 14
- The right lane on 33 Avenue S.W. will be closed between Sarcee Road and Crowchild Trail from 10 a.m. to 3 p.m. on Sunday, April 14.
- The right lane will be closed on Southbound Crowchild Trail, between 33 Avenue S.W. and Mount Royal Gate from 10 a.m. to 3 p.m. on Sunday, April 14.
- Calgary Police will be on-site. Motorists should drive with caution and watch for cyclists.
- Motorists are advised to watch for cyclists on Sarcee Road between Richardson Way and 33 Avenue S.W.
Northeast
36 Street N.E. will be closed between 80 Avenue N.E. and Country Hills Boulevard, beginning Monday, April 8, for the roadway between Airport Trail and Country Hills Boulevard to be reconstructed from two lanes to four lanes. The closure, which will last approximately four months, will allow Airport Trail connections to be made to 36 Street N.E. eastbound from the Airport Trail tunnel. Motorists are advised to use Métis Trail N.E. as an alternative route.
36 Street N.E. will be closed between 80 Avenue N.E. and Country Hills Boulevard, beginning Monday, April 8, for the roadway between Airport Trail and Country Hills Boulevard to be reconstructed from two lanes to four lanes. The closure, which will last approximately four months, will allow Airport Trail connections to be made to 36 Street N.E. eastbound from the Airport Trail tunnel. Motorists are advised to use Métis Trail N.E. as an alternative route.
McKnight Boulevard between Edmonton Trail and Deerfoot Trail will be reduced to one lane in each direction, from 8 p.m. on Friday, April 5 to 8 p.m. on Sunday, April 7, for bridge rehabilitation.
Southeast
6 Avenue S.E. between Centre Street and 1 Street S.E., will have two left lanes closed, from 8 a.m. to 5 p.m. daily, from Saturday, April 6 to Sunday, April 7, for construction.
5 Avenue S.E. between 1 Street S.W. and 1 Street S.E., will be reduced to two lanes, from 7 a.m. to 3 p.m. on Saturday, April 6, for construction.
62 Avenue S.E. between 17A Street S.E. and 18 Street S.E., will be closed, from 9 a.m. Thursday, April 4 to 7 p.m. Sunday, April 7, to allow for sewer main replacement. Local traffic will be directed to 60 Avenue S.E. to bypass the construction. Alternate routes are recommended as delays are expected.
Memorial Drive between 47 Street S.E. and Forest Road, will be reduced to one lane in each direction, from 8 a.m. to 3 p.m. daily, from Thursday, April 4 to Tuesday, April 9, for water services repair.
68 Street S.E. between 106 Avenue S.E. and 108 Avenue S.E. will have all traffic shifted to an adjacent eastside road, to allow for utility installations and surface upgrades, starting at 10 a.m. Wednesday, March 6. The speed limit of the detour road will be reduced to 30 km/h. This stage of construction is expected to last for approximately 30 days. Updates will be provided as the project progresses.
100 Street S.E., between Glenmore Trail and Venture Avenue, will be closed for approximately six weeks starting at 10 a.m. Tuesday, April 2 to allow for water service upgrades and utility connections. Traffic will be directed to 84 Street S.E. to bypass the construction. Local business access will be maintained.
Northbound Deerfoot Trail S.E., between highway 22X and Cranston Avenue/Seton Boulevard S.E., will be diverted to the southbound lanes nightly, from 10 p.m. to 6 a.m. starting April 1 and lasting to April 13. Traffic speeds will be reduced to 50km/h in the construction zone and motorists may experience intermittent stops for the delivery of bridge girders. This traffic detour is to facilitate bridge construction on Stoney Trail.
Southwest
Centre Street between 5 Avenue S.W. and 7 Avenue S.W., will be reduced to one lane in each direction, from 8 a.m. to 5 p.m. daily, from Saturday, April 6 to Sunday, April 7, for construction.
Centre Street between 5 Avenue S.W. and 7 Avenue S.W., will be reduced to one lane in each direction, from 8 a.m. to 5 p.m. daily, from Saturday, April 6 to Sunday, April 7, for construction.
4 Street S.W. between 22 Avenue S.W. and 23 Avenue S.W., will be closed, from 10 a.m. on Friday, April 5 to 7 p.m. on Sunday, April 7, for the installation of an underground utility.
The two left lanes of northbound 4 Street S.W. at 10 Avenue S.W. In addition, 10 Avenue S.W. westbound will be closed between 4 Street S.W. and 5 Street S.W., from 9 a.m. Thursday, March 28 to 7 p.m. on Saturday, April 6, to allow for water service upgrades and main replacement. Traffic will be directed to use either 11 Avenue S.W. or 6 Avenue S.W. to bypass the construction. Also, the west sidewalk will be closed on 4 Street S.W. between 10 Avenue S.W. and 8 Avenue S.W. during the same timeframe.
The left lane on northbound 4 Street S.W. at 10 Avenue S.W. and the right lane on westbound 10 Avenue S.W. at 4 Street S.W. will be closed from 9 a.m. Monday, April 8 to 7 p.m. Tuesday, April 9 to allow for concrete repairs at northwest corner of intersection.
This work is part of a number of ongoing road closures and lane restrictions in Calgary. For more information on these and other closures, please visit www.calgary.ca/trafficinfo.
-30-
Public Contact Information:
The City of Calgary, 311 Operations Centre
Phone: 311 or from outside the local calling area phone 403.268.CITY (2489)
Public Web Contact: Complete and submit the Contact Us/Feedback form.