Calgary, AB,
26
April
2013
|
15:28
America/Denver

Calgary road closures and lane restrictions for April 26, 2013

Special events
Police Half Marathon and 5K Walk and Run
Sunday, April 28, 8 a.m. to 11 a.m.
  • The exit ramp from northbound Crowchild Trail to Mount Royal Gate (50 Avenue S.W.) will be closed.
  • Mount Royal Gate (50 Avenue S.W.) will be reduced to one lane in each direction between Richard Road S.W. and 16 Street S.W.
  • Richard Road S.W. will be closed between Mount Royal Gate (50 Avenue S.W.) and Peace Keeper Way S.W.
  • 66 Avenue S.W. will have runners in the south curb lane between 37 Street S.W. and Crowchild Trail S.W.
Please be aware that there will be a significant police presence in the area during this event. Drivers are advised to use caution when near participants, organizers and volunteers.
 
Southwest
16 street S.W. at 45 Avenue S.W. will be closed, from 6 p.m. on Friday, April 26 until 8 p.m. on Saturday, April 27, for installation of an underground utility.

Centre Street between 6 Avenue S.W. and 7 Avenue S.W. will be reduced to one lane in each direction, from 9 a.m. to 3 p.m. daily between Monday, April 29 to Friday, May 3. In addition, the west sidewalk will be closed from 9 a.m. on Monday, April 29 to Friday, May 3, for replacing a sidewalk.

Westbound 13 Avenue S.W. between 1 Street S.W. to 4 Street S.W. will be closed starting at 7 a.m. on Monday, April 29, for approximately two months for the 13 Avenue Heritage Greenway Project.

Southbound Crowchild Trail at 33 Avenue S.W., the two left lanes will be closed, from 8 a.m. to 2 p.m. on Saturday, April 27, for paving.
The ramp from southbound Crowchild Trail to westbound Bow Trail will be closed from 9 a.m. to 3 p.m. on Thursday, April 25 and Friday, April 26 for roadwork. Motorists will be detoured via 12 Avenue S.W.
 
Southeast
The right lane will be closed  and the speed restricted to 60 km/h on northbound Blackfoot Trail south of Heritage Drive from 9 a.m. to 3 p.m. daily Monday, April 29 to Friday May 3, to allow for new roadway construction at the future 85 Avenue S.E. connection to Blackfoot Trail. The 60 km/h speed reduction will remain in effect 24/7 during construction activities close to roadway.
 
The right lane will be closed  and the speed restricted to 60 km/h on northbound Macleod Trail at 210 Avenue S.E. starting at 12 p.m. Saturday, April 27 for approximately one week, to allow for roadway construction.

Southbound Macleod Trail (1 Street S.E.)  between 5 Avenue S.E. and 6 Avenue S.E. will be reduced to two centre lanes from 9 a.m. to 3 p.m. daily from Friday, April 26 until Wednesday, May 1, for construction.

Motorists heading east on Stoney Trail/Highway 22X will shift to westbound lanes between Cranston Boulevard/McKenzie Lake Boulevard S.E. and Deerfoot Trail from Wednesday, April 24 to Friday, April 26 between 10 p.m. to 6 a.m. for the new Stoney Trail bridge construction.
Southbound Deerfoot Trail speed will be reduced to 50 km/h in the construction zone and motorists may experience delays from April 21 until May 10, for trucks moving materials from Deerfoot Trail S.E. between highway 22X and Cranston Avenue/Seton Boulevard S.E.

Northbound 3 Street S.E. at 7 Avenue S.E., the right lane will be closed. In addition, the eastside of sidewalk on 3 Street S.E. north of 7 Avenue S.E. will be closed. This will start at 9 a.m. on Monday, April 15 until 6 p.m. on Friday, May 10, for construction.

68 Street S.E. between 106 Avenue S.E. and 108 Avenue S.E. will have all traffic shifted to an adjacent eastside road, to allow for utility installations and surface upgrades, starting at 10 a.m. Wednesday, March 6. The speed limit of the detour road will be reduced to 30 km/h. This stage of construction is expected to last until mid-May. Updates will be provided as the project progresses.
 
100 Street S.E., between Glenmore Trail and Venture Avenue, will be closed for approximately six weeks starting at 10 a.m. Tuesday, April 2 to allow for water service upgrades and utility connections. Traffic will be directed to 84 Street S.E. to bypass the construction. Local business access will be maintained.
 
Northeast
Southbound 36 Street N.E. at Marlborough CTrain station the left turn lane will be closed, from 9 a.m. to 3 p.m. daily, between Monday, April 22 until Friday, April 26, for the NE CTrain platform extension project. For more information please visit www.calgary.ca/4carplatforms.

36 Street N.E. will be closed between 80 Avenue N.E. and Country Hills Boulevard, beginning Monday, April 8, between Airport Trail and Country Hills Boulevard for the roadway to be reconstructed from two lanes to four lanes. The closure, which will last approximately four months, will allow Airport Trail connections to be made to 36 Street N.E. eastbound from the Airport Trail tunnel. Motorists are advised to use Métis Trail N.E. as an alternative route. For more information, visit 36 Street N.E. road reconstruction and widening.
 
Northwest
Eastbound 16 Avenue N.W. at 12 Street N.W., will be reduced to one lane, from 6 a.m. on 3 p.m. to Saturday, April 27, for construction.

Memorial Drive  N.W. between 10 Street N.W. and 85 Street N.W., will be reduced to one lane in each direction, from 6 a.m. on Saturday, April 27 to 6 p.m. on Sunday, April 28, for utility work.
 
Bowness Road N.W. between 60 Street N.W. and 61 Street N.W. will be closed, from 7 a.m. on Saturday, April 27 to 8 p.m. on Sunday, April 28, for utility work.
 
Westbound 16 Avenue N.W. west of Sarcee Trail, one lane will be closed, from 8 a.m. to 4 p.m. daily, between Saturday, April 27 to Sunday, April 28, for construction.
 
Northbound Centre Street at 43 Avenue N.W. will be reduced to one lane, for 8 a.m. until 3 p.m. on Saturday, April 27, for utilities work.

Lane closures on Centre Street between Laycock Drive and Thorncrest Road will restrict traffic to a single lane in each direction starting at 4 a.m. Monday, April 22, for the Centre Street Reconstruction and Transit Priority project. Construction will last for approximately six to eight weeks, expect delays.  For more information, please visit www.calgary.ca/centrestreet.
 
Westbound 16 Avenue N.W. west of Sarcee Trail, one lane will be closed, 8 a.m. to 3 p.m. daily, from Tuesday, April 9 until Friday, May 3, for noise wall replacement.
 
This work is part of a number of ongoing road closures and lane restrictions in Calgary. For more information on these and other closures, please visit www.calgary.ca/trafficinfo.
-30-
Public Contact Information:
The City of Calgary, 311 Operations Centre.
Phone: 311 or from outside the local calling area phone 403.268.CITY (2489).
Public Web Contact: Complete and submit the Contact Us/Feedback form.