Northeast

NEW: The right lane of southbound 36 Street N.E. at 44 Avenue N.E. is closed between 9 a.m. and 3 p.m. on Tuesday, May 26. This closure accommodates utility work.

NEW: The right lane of southbound Saddletown Circle N.E. is closed at Martindale Drive N.E. between 7 a.m. and 5 p.m. on Tuesday, May 26. This closure accommodates construction.

4 Avenue N.E. is closed between Edmonton Trail N.E. and 4A Street N.E. beginning at 7 a.m. on Monday, May 25. This closure continues until 6 p.m. on Friday, May 29 and accommodates construction.

Centre A Street N.E. is closed between 13 Avenue N.E. to 16 Avenue N.E. beginning at 8 a.m. on Tuesday, May 19. This closure continues until 7 p.m. on Tuesday, May 26 and accommodates new service installation.

The right lane of 64 Avenue N.E. between 9 Street N.E. and 11 Street N.E. is closed beginning at 9 a.m. on Monday, May 11. This closure continues until 3 p.m. on Friday, May 29 and accommodates construction.

The right lane of southbound Edmonton Trail N.E. at 36 Avenue N.E. is closed beginning at 7 a.m. on Wednesday, May 20. This closure continues until 9 p.m. on Wednesday, May 27 and accommodates construction.

The right lane of westbound Country Hills Boulevard N.E. is closed between Metis Trail N.E. and 36 Street N.E. daily between 9 a.m. and 3 p.m. beginning Wednesday, May 13. This closure continues until Wednesday, May 27 and accommodates construction.

2 Street N.E. between 5 Avenue N.E. and 9 Avenue N.E. will have various lane closures beginning at 9 a.m. on Wednesday, April 29. These closures will continue until Monday, June 15 and accommodate utility upgrade work.

Northwest

The right lane of westbound Memorial Drive N.W. west of 4 Street N.W. will be closed between 9 a.m. and 3 p.m. beginning on Monday, May 25. This closure continues daily during these hours until Friday, May 29 and accommodates flood restoration work.

Southbound 10 Street N.W. at 2 Avenue N.W. is reduced to a single left lane. This closure remains in place until the end of May and accommodates new development construction.

Eastbound 16 Avenue N.W. will be reduced to one lane east of Sarcee Trail N.W. from 9 a.m. to 4 p.m. daily on weekdays until the end of May due to utility work.

Country Hills Boulevard N.W. east of Rocky Ridge Road N.W. will be reduced to a single lane in each direction beginning at 9 a.m. on Monday, May 4. This construction project continues until the end of June.

Southeast

Eastbound Glenmore Trail S.E. between Odgen Road S.E. and Barlow Trail S.E. will have various single lane closures and the speed limit reduced to 50 km/h between 9:30 a.m. and 3 p.m. daily on Monday, May 25 and Tuesday, May 26. This closure accommodates Enmax overhead utility work. Crews will be on site to stop traffic as required, while the overhead lines are moved across roadway.

Northbound and southbound Shepard Road S.E. south of Glenmore Trail S.E. will have various single lane closures between 9:30 a.m. and 3 p.m. daily on Monday, May 25 and Tuesday, May 26. This closure accommodates Enmax overhead utility work. Crews will be on site to stop traffic as required, while the overhead lines are moved across roadway.

11 Street S.E. under Glenmore Trail S.E. will have various single lane closures between 9 a.m. and 3 p.m. beginning Monday, May 25. This closure continues until Friday, May 29 and accommodates bridge work.

The exit ramp allowing U-turns from southbound 1 Street S.E. to northbound Macleod Trail, north of 25 Avenue S.E. will be closed beginning at 5 a.m. on Tuesday, May 19. In addition, the regional pathway link to the Macleod Trail bridge deck (Victoria Bridge) will also be closed. Pathway users will be directed to use the 1 Street S.E. link one block to the west. These closures will remain in place for the duration of the 2015 construction season. For more information on the Victoria Trail Bridge re-habilitation project, visit Calgary.ca and search “Victoria Bridge.”

The existing westbound left lane closure and 60 km/h speed reduction will remain in place 24/7 until mid-May across the Graves Bridge over the Bow River on Glenmore Trail west of 18 Street S.E. Multiple westbound lane closures will be allowed during evenings and weekends. The eastbound right lane will be closed and the speed reduced to 60 km/h on the Graves Bridge, Beginning Monday, May 11 and remains in place 24/7 until mid-June. This is the continuation of the Water Services new water main installation, using bridge structure as above ground support to cross Bow River.

94 Avenue S.E. between 52 Street S.E. and 60 Street S.E. will be closed beginning at 7 a.m. on Monday, April 20. The closure will remain in place until 8.pm. on Friday, July 31 and accommodates new road construction.

4 Street S.E. is reduced to one lane in each direction between 9 Avenue S.E. and 8 Avenue S.E. until September 30. This closure is needed to facilitate the construction of the +60 pedestrian bridge at the National Music Centre.

Southwest

13 Avenue S.W. is closed between 4 Street S.W. and 5 Street S.W. beginning at 7 a.m. on Friday, May 22. This closure will continue until 7 p.m. on Tuesday, May 26 and accommodates Enmax utility work.

The north lane of 12 Avenue S.W. between 5 Street S.W. and 11 Street S.W. is permanently closed beginning on May 4 due to cycle track construction.

12 Avenue S.W. between 32 Street S.W. and 28 Street S.W. will be closed beginning at 6 a.m. on Friday, May 1. This closure will continue until 7 p.m. on Sunday, May 31 and accommodates sanitary line upgrades.

5 Street S.W. between 2 Avenue S.W. and 3 Avenue S.W. will be closed beginning at 8:30 a.m. on Monday, May 4. This closure will continue until 7 p.m. on Monday, June 8 and accommodates +15 construction between Eau Claire Tower and Centennial Place.

Southbound 1 Street S.W. will be reduced to one lane between 9 Avenue S.W. and 10 Avenue S.W. starting Sunday, January 25 to accommodate the 1 Street S.W. underpass enhancement project. At the same time the sidewalk on southbound 1 Street S.W. will be closed. Pedestrians should use the sidewalk on the east side of 1 Street S.W. These closures will be in place until the work on the west side of the underpass is complete.

Cycle Track Closures

  • From Sunday, May 10 onwards, there will be no parking permitted on either side of 8 Avenue between 11 St. S.W. and 3 St. S.W. due to lane spotting and lane marking work.
  • From Sunday, May 10 onwards, there will be no parking permitted on either side of 5 Street between 3 Ave. S.W. and 17 Ave. S.W. due to lane marking work.

Alberta Transportation

For more information visit Alberta Transportation’s website.

Follow The City of Calgary’s Transportation Department on Twitter for up to date information on road closures, projects and all of Transportations’ services at @yyctransport.

Visit Calgary.ca/trafficinfo for up-to-date road closure and incident information.