Calgary, AB,
15
January
2015
|
15:49
America/Denver

Calgary road closures - January 15, 2015

Northeast

NEW: Regal Crescent N.E. will be closed between Remington Road N.E. and Radford Road N.E. from 6 p.m. on Friday, January 16 to 9 p.m. on Sunday, January 18 due to utility work.

Left turns will be restricted from southbound Metis Trail onto eastbound Country Hills Boulevard from 9 a.m. to 3 p.m. daily from Tuesday, January 13 to Friday, January 16 due to utility work.

Northwest

NEW: Southbound Nose Hill Drive will be reduced to one lane at John Laurie Boulevard from 8 a.m. to 6 p.m. on Saturday, January 17 due to utility work.

NEW: Scenic Acres Gate will be closed between Nose Hill Drive and Scenic Acres Drive from 9 a.m. on Friday, January 16 to 6 p.m. on Sunday, January 18 due to utility work.

Kensington Road will be reduced to one lane in each direction between 11 Street N.W. and 13 Street N.W. from 6 p.m. to midnight, nightly from Tuesday, January 13 to Thursday, January 15 due to utility work.

Eastbound 16 Avenue N.W. will be reduced to one lane east of Sarcee Trail from 9 a.m. to 4 p.m. daily on weekdays until January 30 due to utility work.

Southeast

NEW: Westbound Glenmore Trail will be reduced to one lane west of 18 Street S.E. from 8 p.m. on Friday, January 16 to 5 a.m. on Monday, January 19 due to a water main upgrade project. At this time speed will be reduced to 60 km/h

NEW: The Heritage Drive / 15 Street S.E. connection to and from Glenmore Trail will be closed from 8 p.m. on Saturday, January 17 to 5 a.m. on Monday, January 19 to accommodate work related to a water main upgrade project. Motorists are advised to use Blackfoot Trail or 18 Street S.E.

NEW: 52 Street S.E. will be reduced to one lane in each direction at 23 Avenue S.E. from 7 p.m. to 11 p.m. Friday, January 16 for traffic signal work. At this time left turns from 52 Street S.E. will be restricted and speed will be reduced to 50 km/h.

The left lane and left turn bays on 52 Street S.E. will be closed at 23 Avenue S.E. from 7 a.m. to 5 p.m. daily on Saturday, January 17 and Sunday, January 18 for traffic signal work. At this time speed will be reduced to 50 km/h.

The right lane will be closed on northbound and southbound 52 Street S.E. at 23 Avenue S.E. and the speed limit reduced to 50 km/h 9 a.m. to 3 p.m. daily from Monday, January 12 to Friday, January 16 for traffic signal work.

There will be lane restrictions on Bonnybrook Bridge until the end of January due to utility work. More details on when the restrictions will be lifted will be provided as they become available.

The west sidewalk of 3 Street S.E. between 7 Avenue S.E. and 8 Avenue S.E. is closed for construction until February 2015.

3 Street S.E. will be reduced to one lane in each direction between 6 Avenue S.E. and 8 Avenue S.E. from 9 a.m. to 3 p.m. daily until the end of January 2015. The sidewalk will also be closed during this time.

 Single lane closures will continue on Glenmore Trail west of 18 Street SE until mid-January, to allow for the City of Calgary’s Water Services’ water main upgrade project- under the Graves Bridge on Glenmore Trail over the Bow River. Glenmore Trail is already part of a construction zone with a reduced speed limit of 60 km/h that will remain in effect 24/7 until project is completed.

4 Street S.E. is closed between 9 Avenue S.E. and 8 Avenue S.E. until the end of January 2015.  This closure is needed to facilitate the construction of the +60 pedestrian bridge at the National Music Centre.

Southwest

NEW: 28 Avenue S.W. will be closed west of 30 Street S.W. until 8 p.m. on Saturday, January 17 due to utility work.

NEW: 9 Avenue will have various lane closures between 1 Street S.W. and Macleod Trail from 9 a.m. to 3 p.m. daily (except Sunday) from Friday, January 16 to Friday, January 23 due to building construction.

NEW: Sarcee Trail will have various lane closures north of Richmond Road from 9 p.m. to 3 a.m. on Thursday, January 15 to accommodate LED street light installation.

NEW: 33 Avenue S.W. will be closed between 16 Street S.W. and 17 Street S.W. from 6 p.m. on Friday, January 16 to 5 a.m. on Monday, January 19 due to utility work. At the same time 16 Street S.W. will be closed between 33 Avenue S.W. and 34 Avenue S.E.

Northbound 1 Street S.W. will be closed between 13 Avenue S.W. and 14 Avenue S.W. from 7 a.m. on Thursday, January 15 to 7 p.m. on Saturday, January 17 due to utility work.

Alberta Transportation

For more information visit Alberta Transportation’s website .

Follow The City of Calgary’s Transportation Department on Twitter for up to date information on road closures, projects and all of Transportations’ services at @yyctransport

Visit Calgary.ca/trafficinfo for up-to-date road closure and incident information.