Calgary, AB,
24
April
2017
|
15:35
America/Denver

Calgary road closures - April 24, 2017

Calgary road closures – April 24, 2017

Calgary road closures and lane restrictions press release

This press release is aimed at informing 911 and the media of major road closures and lane restrictions. For information on closures in your area, visit Calgary.ca/trafficinfo.

Find up to the minute road closure information on the Transportation Twitter account (@yyctransport).

Northeast

Reduced lanes on westbound McKnight Boulevard N.E. at Aviation Boulevard N.E. beginning at 5 a.m. on Friday, April 21. This closure continues daily until 7 p.m. on Wednesday, April 26 and accommodates utility work.

Reduced lanes on eastbound Country Hills Boulevard N.E. at Barlow Trail N.E. daily from 6 a.m. to 3 p.m. beginning on Monday, April 24. This closure occurs daily during these hours until 3 p.m. on Friday, May 5 and accommodates utility work.

Northwest

NEW: Sarcee Trail N.W. is reduced to a single lane with alternating traffic at 112 Avenue N.W. During this closure, a temporary traffic signal will alternate northbound and southbound traffic. This closure continues until 8 p.m. on Sunday, May 6 and accommodates construction.

Centre Street N is reduced to a single lane in each direction at 40 Avenue N.W. beginning at 6 a.m. on Monday, April 24. This closure remains in place until 7 p.m. on Tuesday, April 25 and accommodates water services utility work.

Westbound Silver Springs Boulevard N.W. is reduced to a single lane at Silvergrove Drive N.W. daily on weekdays from 9 a.m. to 3 p.m. beginning on Friday, April 21. This closure continues daily during weekdays until 3 p.m. on Friday, April 28 and accommodates utility work.

29 Street N.W. is reduced to a single lane in each direction south of 16 Avenue N.W. beginning at 9 a.m. on Monday, April 24. During this closure, the west sidewalk will be closed between Hospital Drive and 16 Avenue N.W. – pedestrian detour signage will indicate the pedestrian detour route. This closure accommodates deep utility work and will be in place through the end of April 2017.

Various single lane closures on 16 Avenue N.W. at 29 Street N.W. / Uxbridge Drive N.W. beginning at 9 a.m. on Monday, April 17. Pedestrian and vehicle detours will be indicated via signage. This closure is part of an intersection improvement project and is expected to continue through October 2017.

Reduced lanes on westbound 16 Avenue N.W. west of 14 Street N.W. daily from 9 a.m. to 3 p.m. During this closure, the speed limit will be reduced to 50 km/hr. through the construction zone. This closure continues daily during these hours until 3 p.m. on Friday, April 28 and accommodates construction.

16 Ave NW / Bowfort Road Interchange Improvements

  • Beginning at 7 p.m. on Sunday, April 23 there will be a new traffic pattern on eastbound 16 Avenue N.W. at Bowfort Road N.W. Motorists wishing to access Bowfort Road should remain in the left lane, all other traffic will be diverted under the bridge.
  • Daily lane reductions on Bowfort Road N.W. and 16 Avenue N.W. through the project limits from 9 a.m. to 3 p.m. until further notice.
  • For more information on this project, visit the project page.

Stoney Trail/ Sarcee Trail Interchange Improvements

  • NEW: Southbound Sarcee Trail N.W. south of 16 Avenue N.W. will be reduced to a single lane until 8 p.m. Sunday, April 30.
  • Daily lane reductions on Sarcee Trail N.W. and 16 Avenue N.W. through the project limits from 9 a.m. to 3 p.m. until further notice.
  • The right lane of westbound 16 Avenue N.W. is closed at Sarcee Trail N.W. daily from 6 a.m. to 3 p.m. beginning on Thursday, March 2. This closure repeats daily on weekdays until late April 2017.
  • For more information on this project, visit the project page.

Southeast

6 Avenue S.E. is closed between 5 Street S.E. and Confluence Way S.E. beginning at 9 a.m. on Monday, April 24. This closure remains in place until 7 p.m. on Wednesday, May 31 and accommodates deep utility work. Local access will be maintained. Motorists are advised to expect delays in the area and use alternate routes.

Eastbound 6 Avenue S.E. is closed at Macleod Trail S.E. beginning at 9 a.m. on Tuesday, April 25. During this closure, local access will be maintained on 6 Avenue S.E. This closure remains in place until 6 p.m. on Friday, April 28 and accommodates utility repair work.

Eastbound 17 Avenue S.E. has reduced lanes east of 19 Street S.E. daily from 7 a.m. to 3 p.m. on weekdays through 3 p.m. on Friday, May 12 for construction work.

Glenmore Trail / Ogden Interchange

  • NEW: The left lane will be closed on northbound and Southbound Barlow Trail south of Glenmore Trail from 9 a.m. to 3 p.m. daily on Monday, April 24 until Friday, April 28 to allow for road work related to the Glenmore Trail / Ogden Road interchange project. Barlow Trail at Glenmore Trail is already part of a construction zone with a reduced speed limit of 50 km/h, that will remain in effect 24/7 for duration of construction.
  • The left lane will be closed on northbound and Southbound Barlow Trail south of Glenmore Trail from 9 a.m. to 3 p.m. daily on Monday, April 17 until Friday, April 21 to allow for road work related to the Glenmore Trail / Ogden Road interchange project. Barlow Trail at Glenmore Trail is already part of a construction zone with a reduced speed limit of 50 km/hr. that will remain in effect 24/7 for duration of construction.
  • The Shepard Road access south of Glenmore is closed. There will be a new access created at 24 Street S.E. south of Glenmore Trail, west of the existing Shepard Road alignment. Traffic requiring to access Shepard Road south of Glenmore Trial will be detoured via the new 24 Street S.E. exit and then along 86 Avenue S.E. to reconnect with Shepard Road.
  • For more information, visit the project page.

Macleod Trail / 162 Avenue construction project

  • NEW: There will be various lane closures on southbound Macleod Trail between Shawnessy Boulevard / Midlake Boulevard and 162 Avenue S.E. / Sun Valley Boulevard from 7 a.m. to 3 p.m. daily on Monday, April 24 until Friday, April 28.
  • NEW: There will be various lane closures on northbound Macleod Trail between 162 Avenue S.E. / Sun Valley Boulevard and Shawnessy Boulevard / Midlake Boulevard from 10 a.m. to 5 p.m. daily on Monday, April 24 until Friday, April 28.
  • NEW: The right lane will be closed on northbound and southbound Shawville Boulevard at 162 Avenue S.E. from 9 a.m. to 3 p.m. daily Monday, April 24 until Friday, April 28
  • NEW: The left lane of the dual turn from southbound Macleod Trail to eastbound Sun Valley Boulevard will be closed from 7 a.m. to 3 p.m. on Tuesday, April 25.
  • NEW: The right lane will be closed on eastbound 162 Avenue S.E. / Sun Valley Boulevard at Macleod Trail from 9 a.m. to 3 p.m. daily on Wednesday, April 26 and Thursday, April 27. The ramps to access Macleod Trail from 162 Avenue S.E. / Sun Valley Boulevard will remain open.
  • For more information, visit the project page.

Southwest

NEW: Reduced lanes on 9 Avenue S.W. west of 11 Street S.W. daily from 9 a.m. to 3 p.m. beginning on Tuesday, April 25. This closure continues daily during these hours until 3 p.m. on Thursday, April 27 and accommodates utility work.

UPDATE: Reduced lanes on 5 Street S.W. between 9 Avenue and 10 Avenue S.W. nightly from 7 p.m. to 5 a.m. beginning 7 p.m. on Tuesday, April 25. These closures continue nightly during these hours until 5 a.m. on Monday, May 1.

The two right lanes of 6 Avenue S.W. are closed between 8 Street S.W. and 9 Street S.W. from 7 a.m. to 2:30 p.m. on weekdays beginning on Thursday, March 9. This closure continues daily on weekdays during these hours, and also on Saturdays from 7 a.m. to 1 p.m. This closure accommodates utility work and continues until 2:30 p.m. on Saturday, April 29.

Reduced lanes on 12 Avenue S.W. between 4 Street and 2 Street S.W. daily from 9 a.m. to 3 p.m. beginning on Monday, April 24. During this closure, cycle track traffic will be diverted into the closed traffic lanes. This closure continues daily during these hours until 3 p.m. on Wednesday, May 3 and accommodates construction.

5 Street S.W. is reduced to a single lane between 7 Avenue and 8 Avenue S.W. from 7 p.m. to 9 p.m. on Monday, April 24.

39 Street S.E. is reduced to a single lane in each direction between Memorial Drive S.E. and Fonda Way S.E. beginning at 9 a.m. on Monday, April 24. During this closure, there will be no right turn from eastbound Memorial to 39 Street S.E., motorists will be detoured to 44 Street S.E. This closure remains in place until 8 p.m. on Sunday, April 30 and accommodates construction.

17 Avenue S. reconstruction project

  • 17 Avenue S.W. is closed between Macleod Trail S.E. and 1 Street S.E. beginning at 7 a.m. on Monday, April 17. During this closure, local business access will be maintained. This closure remains in place until 7 p.m. on Monday, June 19.
  • For more information, visit the project page.

Alberta Transportation

Alberta Transportation maintains Deerfoot Trail (Hwy.2) and Stoney Trail (Hwy. 201). For more information on work happening on these roads visit Alberta Transportation’s website.

Southwest Ring Road Project

Work is underway on the Southwest Ring Road project. For more information on work happening, visit http://www.swcrrproject.com/traffic-updates/